INSP - Final | 4/3/1998 | 4/3/1998 | 4/3/1998 | | PASS |
|
|
|
/ / 338 - made ok l/c issued # 014261
|
INSP - Letter of compliance | 4/3/1998 | 4/3/1998 | 4/3/1998 | | PASS |
|
|
|
/ / 338 - # 014261
|
INSP - Letter of compliance | 4/3/1998 | 4/3/1998 | 4/3/1998 | | PASS |
|
|
|
/ / 338 - # 014261
|
INSP-Final Inspection | 4/3/1998 | 4/3/1998 | 4/3/1998 | | PASS |
|
|
|
REINSP OK FOR CERT OF COMPLETION
|
INSP-Final Inspection | 3/31/1998 | 4/1/1998 | 4/1/1998 | P | FAIL |
Joe Tawney
|
|
|
04/01/98 406 - as per 406 1:00-tracy ###-#### FINAL SHELL AND CORE FAIL DUCT DETECTORS BARRICADES FOR GAS METERS
|
INSP-Final Inspection | 3/27/1998 | 3/30/1998 | 3/30/1998 | A | PASS |
Joe Tawney
|
|
|
03/30/98 406 - at 9:00as per 406-tracy ###-#### OK ON SPKLR ROUGH IN & HYDRO TEST WINDOW SPKLR INSTAL OK
|
INSP - Framing/Rough-in | 2/23/1998 | 2/24/1998 | 2/24/1998 | A | CANC |
|
|
|
02/24/98 333 - canc by perry CONFERENCE WITH JACK AT ###-####--HE WILL C TIME.
|
INSP-Supply line flush | 2/17/1998 | 2/17/1998 | 2/17/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 2/9/1998 | 2/9/1998 | 2/9/1998 | P | PART |
|
|
|
02/09/98 338 - jack ###-#### cell conference conference only on the rati and the extension of the 2-hour wall
|
INSP - Framing/Rough-in | 2/9/1998 | 2/9/1998 | 2/9/1998 | | PART |
|
|
|
/ / 333 - pre frame
|
INSP - Framing/Rough-in | 1/30/1998 | 1/30/1998 | 1/31/1998 | P | PART |
|
|
|
01/30/98 338 - ###-#### jack vrbl c/n on the roof deck strapping
|