Permit Information
Permit NumberBLD97-02259
StatusExpired
Name BOISE SAMARITAN VILLAGE
Site Address 3115 N SYCAMORE DR
Project NameGOOD SAMARITAN
Customer Number 
ePlanReviewNo
Description
To remodel the office area of 12,252 sq ft existing instutional facility in accordance with approved plans on file. Work covers primarily life safety upgrades that will be finished in stages this is the first phase of five by letter of agreement on file. Construction will include remodel of physical therapy room, and relocating dentist office, Upgrades will include new 90 min. fire rated egress doors through three 2-hr area separation walls, the upgrade of the entire corridor area of this building, including smoke/fire dampers, and extending one-hour wall to the ceiling, 20 min. fire rated door assemblys and 45 min rated sidelites, upgrade of existing fire sprinkler system per NFPA#13, infill of various window openings. Adding exterior exit door and panic hardware to room 270. NOTE: This building is fully fire sprinklered. (P.C.#497-97)RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/2/199811/3/199811/3/1998ANR
DetailsCarl Dependahl
###-#### JOEL...not at site, called.
INSP-Final Inspection11/2/199811/3/199811/3/1998AFAIL
Details
alarm plans not approved,detectors too close to hvac openings, doors on hold open without detectors, sprinkler missing from beauty shop, vert sidewall head pointe wrong way, occ load not posted. strobes not provided.
INSP - Final10/29/199810/29/199810/29/1998PNR
DetailsCarl Dependahl
joel, will call, want 3-3:30 insp if possible. need fire/safety, unable to contact in pm for insp.
INSP - Framing/Rough-in10/19/199810/19/199810/19/1998PPART
DetailsCarl Dependahl
firestopping & 2hr wall at "patio" at kitchen...ok, framed up through roof, 2 layers gyp ok
INSP - Framing/Rough-in10/8/199810/8/199810/8/1998PPART
DetailsCarl Dependahl
dave ###-#### pager call before going so he can meet you 2hr wall at boiler room...fan at lid moved, replumbed, penetrations. ok
INSP - Framing/Rough-in9/8/19989/8/19989/8/1998PPART
DetailsCarl Dependahl
DAVE TERRELL...2hr wall thru roof at mech rm. 2 layers gyp ok...ok to cover & roof.
INSP - Framing/Rough-in9/3/19989/3/19989/3/1998PNH
DetailsWes Worcester
09/03/98 342 - no job # 2pm apt and no one to be found. no one knew wher
INSP - Framing/Rough-in9/1/19989/1/19989/1/1998PPART
DetailsCarl Dependahl
DAVE CM COMPANY; 2hr wall adjacent to training & mech. rooms...framing complete to roof decking and to existing masonry; 1st layer rock installed at ext. portions. Need to firestop & repair existing masonry at mech rm...ok to add 2nd layer, will req. insp.
INSP - Framing/Rough-in8/27/19988/27/19988/27/1998PFAIL
DetailsCarl Dependahl
conf only w/ Steve Pavlick, proj. arch...gave c/n for resubmittal to clarify procedure at 2hr wall at boiler room.
INSP - Wall cover8/27/19988/27/19988/27/1998PFAIL
DetailsCarl Dependahl
call from Dave Terrel w/ CM CO...need exam of 2hr wall at room 236 ...chk'd occupancy separation/penetrations, met w/ plumber. Also chk'd roof/wall at adjacent 2hr...need complete to roof deck; requested resubmittal. C/n to cm co, copy to arch.
INSP - Framing/Rough-in8/24/19988/24/19988/24/1998ANR
DetailsCarl Dependahl
conf only; w/ Dan Stuart re contractors proposal at rm 236/ 2hr wall to roof deck.
INSP - Framing/Rough-in8/20/19988/20/19988/20/1998PPART
DetailsCarl Dependahl
nailing at 2hr wall...1st layer;adjacent to cafeteria.
INSP - Framing/Rough-in8/18/19988/19/19988/19/1998PPART
DetailsCarl Dependahl
meet w/ arch (Steve & ? of olsen) & cm co.(Jackie, proj. mgr) at 2:30...ok to cover 2hr wall adjacent to cafeteria; chk'd 2hr wall off kitchen area. asked arch to resubmit/clarify extent of existing "2hr walls". ok to field approve known assemblies. for any proposed changes...ok to field approve if known approved assembly used
INSP - Framing/Rough-in8/18/19988/18/19988/18/1998PPART
DetailsCarl Dependahl
dave no phone at site...ok to cover lid & wall at employee patio area
INSP - Framing/Rough-in8/18/19988/18/19988/18/1998ANR
DetailsCarl Dependahl
conf only; w/ Jackie, proj. mgr. for CM CO...wants to meet onsite w/ arch.
INSP - Framing/Rough-in8/17/19988/17/19988/17/1998PPART
DetailsCarl Dependahl
no phone #...employee patio area, drywall ok for 2hr wall/ 1hr lid; need clarification for protection of roof framing at opposite side (cafeteria). need to complete firestopping before cover at lid.
INSP - Wall cover8/11/19988/12/19988/12/1998ACANC
DetailsWes Worcester
08/11/98 342 - fire wall jim ###-#### given to Carl
INSP - Framing/Rough-in8/11/19988/11/19988/11/1998ANR
DetailsCarl Dependahl
conf w/ Steve of Olsen Arch's re c/n of 8-10...need detail for penetrations; equivalent alternate const at 2hr wall ok so as to give contractor option.
INSP - Framing/Rough-in8/7/19988/10/19988/10/1998PFAIL
DetailsCarl Dependahl
nailing late pm levar ###-####...1st layer gyp ok at ext wall/lid at break room area. C/N ...need detail for penetration protection at 2hr. area sep. wall. Wall is framed, not cmu as per arch's detail
INSP - Framing/Rough-in8/7/19988/7/19988/7/1998PNR
DetailsCarl Dependahl
conf. only; rec'd add'l resubmittal re 2hr wall
INSP - Framing/Rough-in8/5/19988/5/19988/5/1998PNR
DetailsCarl Dependahl
discussed resub w/ wes; spoke w/ Joel of CM CO
INSP - Framing/Rough-in8/5/19988/5/19988/5/1998 PART
DetailsWes Worcester
/ / 342 -
INSP - Wall cover8/4/19988/5/19988/5/1998AFAIL
DetailsWes Worcester
08/05/98 342 - give a write-up on the fire wall outside the kitchen need wall type at kitchen ###-####
INSP - Framing/Rough-in8/3/19988/4/19988/4/1998ANR
DetailsWes Worcester
08/04/98 342 - ###-####
INSP - Framing/Rough-in7/6/19987/6/19987/6/1998PPART
DetailsCarl Dependahl
not insp, conf w/ c/m co...left msg for Joel Brown
INSP - Framing/Rough-in5/28/19985/28/19985/28/1998PNR
DetailsCarl Dependahl
resubmittal; work not completed.
INSP - Framing/Rough-in5/11/19985/11/19985/11/1998APART
DetailsCarl Dependahl
not insp, conf. for resubmittal at 2 hr wall
INSP - Framing/Rough-in5/8/19985/8/19985/8/1998APART
DetailsCarl Dependahl
NOT INSP, REC'D RESUBMITTAL; CONF W/ DAN STUART
INSP - Framing/Rough-in4/15/19984/15/19984/15/1998PPART
DetailsCarl Dependahl
1hr req's w/ Joel...not insp
INSP - Framing/Rough-in3/18/19983/18/19983/18/1998APART
DetailsCarl Dependahl
not insp, conf. w/ cont re 1hr req's
INSP - Framing/Rough-in3/18/19983/17/19983/17/1998PPART
DetailsCarl Dependahl
TOOK FOR WES...OK TO COVER RESTROOM OFF MAIN CORRIDOR
INSP - Framing/Rough-in3/16/19983/17/19983/17/1998ACANC
DetailsWes Worcester
03/17/98 342 - jay ###-####
INSP - Framing/Rough-in3/13/19983/12/19983/12/1998PPART
DetailsCarl Dependahl
conf w/ arch re fire doors, labels, etc
INSP - Framing/Rough-in3/10/19983/9/19983/9/1998PPART
DetailsCarl Dependahl
conf w/ arch, chk openings...
INSP - Framing/Rough-in3/6/19983/6/19983/6/1998APART
DetailsCarl Dependahl
re exiting wire glass at corridors; chk w/ Dan S & Ron H; ok if not specifically called out to change opening...
INSP - Framing/Rough-in3/5/19983/5/19983/5/1998ANR
DetailsCarl Dependahl
discussed test/ cert report for door jambs w/ joel; will reinsp
INSP - Framing/Rough-in3/5/19983/5/19983/5/1998PPART
DetailsCarl Dependahl
WILL CALL FOR TIME; ok to cover restroom off corridor (central hall by dining & office
INSP - Framing/Rough-in3/4/19983/5/19983/5/1998ACANC
DetailsWes Worcester
03/05/98 342 - JOEL WILL CALL YOU given to Carl ###-####
INSP - Framing/Rough-in3/4/19983/4/19983/4/1998ANR
DetailsCarl Dependahl
REC'D NON-COMPLYING REPORT ON DOORS FROM INTER-TEK (WARNOCK-HERSEY)...CALLED JOEL BROWN, WAITING FOR REPLY.
INSP - Framing/Rough-in2/11/19982/12/19982/12/1998PFAIL
DetailsCarl Dependahl
joel at samaritan; corridor wall, ducts, firestops. C/N, NEED GYP MEMBRANE THROUGHOUT...FIRESTOP ALL STRUCT BRG WALLS, FIREBLOCK WOOD FRAMING, ETC,
INSP - Framing/Rough-in2/13/19982/12/19982/12/1998PPART
DetailsCarl Dependahl
NOT FRAME, CONF W/ DAN S. & RON HILL RE PLAN REQ'S...FOR 1HR CONST
INSP - Wall cover2/12/19982/11/19982/11/1998PNR
DetailsCarl Dependahl
CONF W/ JOEL; NEED COMPLETE 1HR DETAILS...
INSP - Framing/Rough-in2/10/19982/10/19982/10/1998PNR
DetailsCarl Dependahl
joel ###-#### framing, NR, NEED COMPLETE DETAILING FOR 1HR CONST...FIRESTOPS, GYP ETC... NEED TO CHK W/ RON HILL IF SPRINKLER SUBSTITUTION USED,NOT INDICATED ON PLAN.
INSP - Conference1/23/19981/23/19981/23/1998APASS
DetailsCarl Dependahl
w/ Joel re drinking fountain proposed change: need ADA reqs...alcove or wing walls or? also details of struct resub.
INSP - Carpentry1/22/19981/22/19981/22/1998PPASS
DetailsCarl Dependahl
got arch's detail & calcs from Ron Hill
INSP - Carpentry1/21/19981/20/19981/20/1998PPART
DetailsCarl Dependahl
AREA B...OK TO COVER SOFFIT; NEED VERIFY ELEC RI
INSP - Framing/Rough-in1/16/19981/16/19981/16/1998PPART
DetailsCarl Dependahl
GOOD SAMARITAN JOEL BROWN ###-####\PARTIAL...CALLED JOEL, COULDN'T FIND ONSITE, NO RESPONSE. WORK AT ROOMSIDE OF AREA B LOOKED OK, LEFT NOTE
INSP - Conference1/12/19981/9/19981/9/1998PPASS
DetailsCarl Dependahl
W/ SUPT. RE INSP OK'S
INSP - Framing/Rough-in1/8/19981/8/19981/8/1998PPART
DetailsCarl Dependahl
AREA 2, NEED DETAIL FOR PROPOSED BEAM AT PARTITION(TO SUPPORT ROOF) OK TO COVER ROOMSIDE WALL ONLY, CHK FIRESTOPS, DAMPERS, ETC. AS NEEDED.
INSP - Conference1/2/19981/5/19981/5/1998APASS
DetailsTom Arcoraci
CONTRACTOR WILL MAKE FLOOR PLAN FOR INSPECTORS TO MARK OFF AREAS THAT WILL BE OK FOR COVER