INSP - Final | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PASS |
|
|
|
06/16/99 338 - signed the occ req card
|
Permanent Occupancy | | 6/15/1999 | 6/15/1999 | | DONE |
|
|
|
|
INSP - Final | 9/29/1998 | 9/29/1998 | 9/29/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Final Inspection | 8/26/1998 | 8/31/1998 | 8/31/1998 | A | FAIL |
Joe Tawney
|
|
|
08/31/98 406 - james ###-#### REINSP FAIL NFPA 72 - FAX OF ALARM SIGNALS - AIR BALANCE REPORT
|
INSP - Final | 7/6/1998 | 7/6/1998 | 7/6/1998 | P | PART |
|
|
|
07/06/98 338 - final chuck a rama/ ###-#### signed the temp col of the o
|
INSP - Final | 7/2/1998 | 7/6/1998 | 7/6/1998 | A | NR |
|
|
|
07/05/98 338 - JAMES ###-#### NEED TO INSTALL LANDING AT THE WEST EMERGE
|
INSP-Final Inspection | 7/2/1998 | 7/6/1998 | 7/6/1998 | A | PART |
Joe Tawney
|
|
|
07/06/98 406 - JAMES ###-#### OK FOR TEMP OCC
|
INSP-Final Inspection | 7/2/1998 | 7/2/1998 | 7/6/1998 | P | FAIL |
Joe Tawney
|
|
|
07/02/98 406 - james ###-#### FINAL FAIL ANSUL SYSTEM ALARM SYSTEM EXIT DOORS
|
INSP-Final Inspection | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | FAIL |
Joe Tawney
|
|
|
07/02/98 406 - Tracy ###-#### FINAL FAIL
|
INSP - Final | 6/26/1998 | 6/26/1998 | 6/26/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - SPKLR FINAL FAIL OBSTRUCTION MISSING HEAD TAMPER SWITCHES
|
INSP-Sprinkler Rough-in/Hydro | 6/15/1998 | 6/16/1998 | 6/16/1998 | P | PART |
Joe Tawney
|
|
|
06/16/98 406 - AT 1 P.M. ###-#### TRACY OK ON ABOVE GROUND HYDRO TEST
|
INSP - Wall cover | 6/4/1998 | 6/5/1998 | 6/5/1998 | P | PART |
|
|
|
06/05/98 338 - part ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 6/5/1998 | 6/5/1998 | 6/5/1998 | P | PART |
Joe Tawney
|
|
|
06/05/98 406 - ###-#### said you were meeting him at 2 SPKLR ROUGH IN OK TO COVER SPKLR PROTECTION PROVIDED FOR ALL COMB CONSTR
|
INSP-Conference | 6/3/1998 | 6/3/1998 | 6/3/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF ON LOCATION OF SMOKE DETECTORS AND OUTSIDE ALARM BELL
|
INSP - Wall cover | 6/1/1998 | 6/2/1998 | 6/2/1998 | P | CANC |
|
|
|
06/02/98 338 - not ready as fire ins has failed will recall for thursday
|
INSP-Sprinkler Rough-in/Hydro | 6/1/1998 | 6/1/1998 | 6/1/1998 | P | FAIL |
Joe Tawney
|
|
|
06/01/98 406 - 1 p.m. ###-#### tracy said he talked with you ROUGH IN INSP PROTECTION NEEDED FOR ALL EXPOSED COMBUSTIBLE CONSTRUCTION
|
INSP-Final Inspection | 5/6/1998 | 5/6/1998 | 5/6/1998 | P | PART |
Joe Tawney
|
|
|
05/06/98 406 - tracy ###-#### ROUGH IN OF ROOM ON NE CORNER OK TO COVER ì
|
INSP - Wall cover | 5/4/1998 | 5/5/1998 | 5/5/1998 | A | PART |
|
|
|
05/05/98 338 - made ok to cover 1-side only
|
INSP - Wall cover | 5/5/1998 | 5/5/1998 | 5/5/1998 | | PART |
|
|
|
05/05/98 338 - UPPER LEVEL MADE OK
|
INSP - Framing/Rough-in | 4/30/1998 | 5/1/1998 | 5/1/1998 | P | NR |
|
|
|
Scheduled by Hello!. Contact phone is [6580016].
|
INSP-Sprinkler Rough-in/Hydro | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | PART |
Joe Tawney
|
|
|
05/01/98 406 - reinspection tracy ###-#### OK ON ROUGH IN OF KITCHEN AREA
|
INSP-Conference | 4/22/1998 | 4/23/1998 | 4/23/1998 | A | PART |
Joe Tawney
|
|
|
04/23/98 406 - ###-####/JAMES - CONFERENCE. CONF ON CONCEALED COMBUSTABLE SPACES
|
INSP - Framing/Rough-in | 4/16/1998 | 4/17/1998 | 4/17/1998 | A | PART |
|
|
|
04/17/98 338 - ok to cover the ext walls and start the ceilings behind t
|
INSP - Framing/Rough-in | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | CANC |
|
|
|
Scheduled by Hello!. Contact phone is [6580016]. Cancelled by Hello! (Last update by [HLO]). Contact: [6580016].
|
INSP - Framing/Rough-in | 4/13/1998 | 4/14/1998 | 4/14/1998 | A | PART |
|
|
|
04/14/98 338 - MET WITH SUPER MIKE OTTO AND DISCUSSED THE PLANS AND REQU
|
INSP-Conference | 4/14/1998 | 4/14/1998 | 4/14/1998 | | PART |
|
|
|
CONF ON ALARM SYSTEM WITH RALPH OF SECURITY GROUP
|
INSP - Framing/Rough-in | 4/9/1998 | 4/9/1998 | 4/9/1998 | P | PART |
|
|
|
04/09/98 338 - conference handled on the phone
|
INSP-Supply line flush | 4/7/1998 | 4/7/1998 | 4/7/1998 | P | PART |
Joe Tawney
|
|
|
PAT ###-#### PAGER OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 4/10/1998 | 4/13/1998 | 4/3/1998 | A | PART |
|
|
|
|
INSP - Framing/Rough-in | 3/30/1998 | 3/30/1998 | 3/31/1998 | P | PART |
|
|
|
03/30/98 333 - ok to cover tjis at south half ceiling only
|
INSP-Sprinkler Rough-in/Hydro | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | FAIL |
Joe Tawney
|
|
|
03/16/98 406 - CHUCK A RAMA--MICK WILL CALL TO SCHEDULE--###-#### UNDERGROUND FLUSH FAIL VLV CLOSED IN UNDERGROUND UNITED WATER TO CHECK
|
INSP - Framing/Rough-in | 2/18/1998 | 2/19/1998 | 2/19/1998 | A | PART |
|
|
|
02/19/98 338 - this is a masonry insp ok to pour this lift r-bar in plac inspected
|
INSP - Foundation | 12/20/1997 | 12/19/1997 | 12/19/1997 | | PASS |
|
|
|
12/19/97 338 - made ok with sp insp approval
|
INSP - Foundation | 12/20/1997 | 12/19/1997 | 12/19/1997 | | PASS |
|
|
|
12/19/97 338 - made ok with sp insp approval
|
INSP - Footings | 12/15/1997 | 12/15/1997 | 12/15/1997 | | PART |
|
|
|
/ / 338 - footing ok to pour the perimeter except 100 lf in the north concrete truck access. special inspector to be on site for the entire p
|
INSP - Foundation | 12/12/1997 | 12/15/1997 | 12/15/1997 | P | CANC |
|
|
|
12/15/97 338 - madeok forthe footing insp only at 16:50:28.
|