Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD97-02465
StatusFinaled
Name STEVE HOSAC
Site Address 1211 W MYRTLE ST
Project NamePIONEER PLAZA II
Customer Number 
ePlanReviewNo
Description
PIONEER PLAZA PHASE 2 * (SHELL AND CORE ONLY) TO CONSTRUCT A NEW 3-STORY, TYPE II ONE-HOUR, FULLY FIRE SPRINKLERED, MULTI TENANT SHELL OFFICE BUILDING. WORK TO INCLUDE THE INSTALLATION OF THE TWO STAIR ENCLOSURES, RESTROOMS ON EACH FLOOR AND AN ELEVATOR TO EACH FLOOR, THE INSTALLATION OF THE CORE MECHANICAL SYSTEM. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING USED FOR ONE-HOUR SUBSTITUTION. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI 117.1 AND THE 1994 EDITIN OF THE UBC. WORK ON SITE TO INCLUDE LANDSCAPING, PAVING SITE UTILITIES. THIS PERMIT DOES NOT ALLOW FOR OCCUPANCY OF THE STRUCTURE. SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCIES MUST BE OBTAINED FOR EACH SEPARATE TENANT SPACE TO BE FINISHED. THE ACCUMULTIVE OCCUPANT LOAD FOR EACH FLOOR CAN NOT EXCEED 100. MJP (P.C.#543-97) DR#44-97 CU-34-97 GRADING PERMIT BLD97-2723 ISSUED 10-08-97 FOUNDATION PERMIT ISSUED, PERMIT NUMBER MIS97-0213 ON 10/16/97.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/27/19999/27/19999/27/1999APASS
Details
made ok for l/c
INSP - Final6/23/19996/23/19996/23/1999PFAIL
Details
06/23/99 338 - achd not approved
INSP - Framing/Rough-in6/14/19996/15/19996/15/1999AFAIL
Details
06/15/99 338 - need to complete assys as per details
INSP - Framing/Rough-in6/15/19996/15/19996/15/1999 FAIL
Details
06/15/99 338 - need fix on the horiz. beam at the east prop line wall
INSP - Final6/7/19996/7/19996/7/1999PFAIL
Details
06/07/99 338 - MUST FOLLOW ASSEMBLIES SUBMITTED SLOPPY WORK
INSP - Final6/2/19996/2/19996/2/1999 FAIL
Details
06/02/99 338 - cancelled will reschedule
INSP-Final Inspection5/26/19995/27/19995/27/1999PPASS
DetailsRick Jackson
2pm Doug ###-#### occ approved
INSP - Framing/Rough-in5/14/19995/17/19995/17/1999PFAIL
Details
conference/ Joe ###-#### c/n on the final need assy for the wall to floor deck at the stair rated walls and the redo of the fire proofing of the east I beam at each level this work is to be done per the plan approved by 338 in its complete detail.
INSP - Final5/11/19995/12/19995/12/1999PFAIL
Details
05/12/99 338 - other agencies not approved
INSP-Final Inspection5/11/19995/12/19995/12/1999PFAIL
DetailsRick Jackson
###-#### KEN//FIRE & LIFE SAFETY alarm plans not approved; access road not complete; elevator not working; address; tampers not wired properly
INSP - Framing/Rough-in4/21/19994/21/19994/30/1999PPART
Details
04/26/99 338 - ok to drop in the tiles
INSP-Conference3/29/19993/30/19993/30/1999APART
Details
03/30/99 338 - made ok for conf
INSP - Framing/Rough-in2/18/19992/19/19992/19/1999APART
DetailsJim Storey
02/19/99 301 - 2nd and 3hrd floor line east wall ok.
INSP - Framing/Rough-in2/15/19992/16/19992/16/1999APART
Details
02/16/99 338 - made ok to cover ext walls only
INSP - Energy code compliance2/2/19992/2/19992/2/1999PPART
Details
02/02/99 338 - madeok for the details of the heater protection and the v
INSP - Framing/Rough-in2/1/19992/1/19992/1/1999PPART
Details
02/01/99 338 - made ok to cover the rest room areas only
INSP - Framing/Rough-in1/28/19991/29/19991/29/1999ANR
DetailsCarl Dependahl
01/29/99 340 - KEN SKAGGS ###-#### FR INSP unable to contact
INSP - Framing/Rough-in1/25/19991/25/19991/25/1999PPART
Details
MADE OK FO TPOUR
INSP-Conference1/7/19991/7/19991/7/1999APART
DetailsRick Jackson
informed general contractor that the alarm plans have not been submitted and approved. electrical contractor was calling simplex as I was leaving...
INSP - Framing/Rough-in11/18/199811/19/199811/19/1998APART
Details
11/19/98 333 - resub on efis system
INSP - Framing/Rough-in11/12/199811/12/199811/12/1998APART
Details
11/12/98 333 - north wall efis exterior only ok
INSP - Framing/Rough-in10/22/199810/27/199810/27/1998APART
Details
10/27/98 333 - pre con
INSP-Conference10/27/199810/27/199810/27/1998APART
DetailsRick Jackson
pre-con meeting with Kim M. Sprinkler plans from State FM not on site and alarm plans not approved - requested both from K2 contractors
INSP - Framing/Rough-in10/20/199810/21/199810/21/1998PFAIL
Details
10/21/98 333 - conference on handrails clearances to wall not correct
INSP - Concrete9/23/19989/24/19989/24/1998APASS
Details
09/24/98 333 - north half slab ok