Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-02549
StatusFinaled
Name AMERISUITES HOTEL
Site Address 925 MILWAUKEE ST
Project NameAMERISUITES HOTEL
Customer Number 
ePlanReviewNo
Description
AMERISUITES HOTEL * TO CONSTRUCT A FOUR STORY 70,754 SQ.FT. 128 ROOM HOTEL WITH EXERCISE ROOM, MEETING ROOMS, IN HOUSE LAUNDRY, AND ATTACHED 2478 SQ. FT. SWIMMING POOL ENCLOSURE. DR#8-97 CU-93-96 PC#561-97 FIRE SPRINKLERS USED FOR AREA.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/199910/11/199910/9/1999APASS
Details
Final reinspect for the Amerisuites Hotel
Permanent Occupancy 10/8/199910/8/1999 DONE
Details
FIRE-Final Inspection10/7/199910/5/199910/5/1999PPASS
DetailsJoe Tawney
reinsp ok for permanent occupancy
INSP-Final Inspection5/12/19995/12/19995/12/1999PNR
DetailsJoe Tawney
05/12/99 406 - not ready allC/N items not completed
INSP-Conference1/22/19991/22/19991/22/1999 PART
DetailsJoe Tawney
/ / 406 - CHECKED LOCATION OF HYDRANTS AT SITE TO VERIFY ADEQUATE WATE OK
INSP - Final1/11/19991/11/19991/11/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR FULL TEMP OCC
INSP - Final1/11/19991/11/19991/11/1999 PART
Details
/ / 338 - MADE OK FOR TEMP SIGNED THE TEMP COLSTILL NEED HARD COPY OF
INSP - Final1/7/19991/7/19991/7/1999 PART
DetailsJoe Tawney
/ / 406 - FINAL OK FOR LIMITED TEMP OCC NO PUBLIC ACCESS AT THIS TIME.
INSP - Final1/6/19991/6/19991/6/1999 PART
Details
/ / 338 - made ok for conditionaql temporary occ cert for hotel person
INSP-Final Inspection1/4/19991/5/19991/5/1999ANR
DetailsJoe Tawney
01/05/99 406 - Preston ###-#### FINAL NOT READY
INSP - Final12/30/199812/31/199812/31/1998AFAIL
DetailsTom Arcoraci
12/31/98 408 - preston- ###-#### temp occ insp NOT READY WITH FIRE INSPECTOR
INSP-Final Inspection12/30/199812/31/199812/31/1998AFAIL
DetailsRick Jackson
preston- ###-#### fn fire insp tested sprinkler alarms only. corridors and stairtowers not complete.
INSP-Final Inspection12/31/199812/31/199812/31/1998 FAIL
DetailsRick Jackson
12/31/98 409 - preston- ###-#### fn fire insp tested sprinkler alarm portion only. stair towers and corridors, alarms
INSP-Final Inspection12/14/199812/17/199812/17/1998APART
DetailsJoe Tawney
12/17/98 406 - ERIC PAGER ###-#### PER JOE 9:00 FN INSP
INSP-Conference12/14/199812/14/199812/14/1998 PART
DetailsJoe Tawney
/ / 406 - PROFIT MEETING WITH ALL INSPECTORS, CONTRACTOR AND SUB CONTR
INSP - Framing/Rough-in12/10/199812/11/199812/11/1998APART
Details
12/11/98 338 - made ok to drop in he tile in east hall 1st floor
INSP - Final12/10/199812/10/199812/10/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON HYDRO TEST OF 1ST & 2ND FLRS, OK ON BOOSTER PUMP TEST
INSP - Wall cover11/13/199811/16/199811/16/1998APART
Details
11/14/98 338 - PRESTON ###-#### WALL COVER INSP madeok to cover restroom
INSP - Framing/Rough-in11/9/199811/10/199811/10/1998AFAIL
Details
11/10/98 338 - PRESTON BAKER- ###-####-2ND FLOOR BATHROOMS fail penetrat
INSP - Framing/Rough-in11/6/199811/9/199811/9/1998APART
Details
11/09/98 338 - made ok to cover the 2nd floor and the rest of the 3rd fl
INSP - Framing/Rough-in11/4/199811/4/199811/5/1998PPART
DetailsTom Arcoraci
11/04/98 408 - 3RD FLOOR BATHROOM--PRESTON ###-#### ok to cover 3rd floor
INSP - Framing/Rough-in11/2/199811/2/199811/2/1998PPART
Details
11/03/98 338 - ok to cover east end of 4 th floor
INSP-Sprinkler Rough-in/Hydro10/27/199810/27/199810/27/1998 PART
DetailsJoe Tawney
/ / 406 - ok on hydro test of 3rd & 4th flrs, underground,FDC,DPV,& st
INSP - Framing/Rough-in10/22/199810/23/199810/23/1998APART
Details
10/23/98 338 - COVER INSPECTION PRESTON ###-#### ok to cover parts of th
INSP - Wall cover10/19/199810/20/199810/20/1998AFAIL
Details
10/20/98 338 - fire caulk putty pads not complet no cover
INSP - Wall cover10/15/199810/15/199810/15/1998PPART
Details
MADE K TO COVER 4TH FLOOR WALLS BETWEEN SUITES
INSP - Framing/Rough-in9/29/199810/13/199810/13/1998AFAIL
Details
10/13/98 338 - need eng for the holes cut in bearing/ demising walls
INSP - Wall cover10/9/199810/13/199810/13/1998APART
DetailsTom Arcoraci
10/13/98 408 - preston ###-#### done by 338
INSP - Wall cover10/13/199810/13/199810/13/1998 PART
Details
/ / 338 - MADD OK RECIEVED ENG FIX FOR RE ROUT OF STORM DRAINS
INSP - Framing/Rough-in9/29/199810/12/199810/12/1998ANR
Details
10/12/98 338 - will call for insp for 10-13-98
INSP - Framing/Rough-in9/29/199810/9/199810/9/1998APART
Details
10/09/98 338 - conference on the plans review and approved plans and the
INSP - Framing/Rough-in9/29/199810/8/199810/8/1998APART
Details
10/08/98 338 - made ok to cover the 1st floor all penetrations made ok.
INSP - Framing/Rough-in9/29/199810/7/199810/7/1998AFAIL
Details
10/07/98 338 - PROPER ASSYS NOT ON SITE NO INSP MADE
INSP - Framing/Rough-in9/29/199810/6/199810/6/1998ANR
Details
10/06/98 338 - not ready assys were not on site inspection will not be d
INSP-Supply line flush10/6/199810/6/199810/6/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON SUPPLY LINE FLUSH OK ON 4TH FLR ROUGH IN
INSP - Framing/Rough-in9/29/199810/5/199810/5/1998ANR
Details
10/05/98 338 - need fire stop info prior to inspection
INSP - Framing/Rough-in9/29/199810/2/199810/2/1998AFAIL
Details
subs do not have proper info not ready no insp completed
INSP - Framing/Rough-in10/2/199810/2/199810/2/1998 PART
Details
10/02/98 338 - MADE OK TO COVER PART OF THE 3RD FLOOR EAST END
INSP - Framing/Rough-in9/29/199810/1/199810/1/1998ACANC
DetailsTom Arcoraci
bob called early and said insp could wait til tomorroe as subs were all not ready
INSP - Framing/Rough-in9/29/19989/30/19989/30/1998AFAIL
Details
09/30/98 338 - not ready fire assys are not complete next not complete i
INSP - Framing/Rough-in9/30/19989/30/19989/30/1998PPART
Details
09/30/98 338 - made ok to cover the suite walls in the west of the 3rd a
INSP - Framing/Rough-in9/28/19989/29/19989/29/1998AFAIL
Details
09/29/98 338 - sheer wall bob ###-#### NOT REWADY FOR INSP OTHER AGENCIE
INSP - Wall cover9/24/19989/25/19989/25/1998APART
Details
09/25/98 338 - made ok for to cover the 2nd floor rooms only not hall
INSP-Sprinkler Rough-in/Hydro9/16/19989/16/19989/16/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON ROUGH IN OF 2ND FLOOR OK TO COVER
INSP - Framing/Rough-in9/4/19989/8/19989/8/1998AFAIL
Details
09/08/98 338 - NOT READY TO COVER C/N ISSUED FIRE ASSYS AND FIRE BLOCK A
INSP - Framing/Rough-in8/31/19988/31/19988/31/1998 NR
Details
08/28/98 338 - with m otto , P BAKER. B LEONARD. PLMER SUPER AND MYSELF
INSP - Framing/Rough-in8/28/19988/28/19988/28/1998PNR
Details
fireproofing/bob ###-#### this is a conf had m otto on site to answer questions on the fire proofing requirements and the rated wall assys
INSP - Conference8/14/19988/14/19988/14/1998 FAIL
DetailsAlan Hauser
/ / 350 - wanted underground pipe looked at, they don't have permit, c
INSP - Framing/Rough-in8/13/19988/13/19988/13/1998PPART
Details
08/13/98 338 - ok to start rocking as inspected
INSP - Framing/Rough-in8/11/19988/12/19988/12/1998APART
Details
08/12/98 338 - ok to cover bob ###-####
INSP - Wall cover8/11/19988/11/19988/11/1998PPART
Details
08/11/98 338 - conf with bob leonard and p baker on the use of approved
INSP - Wall cover8/7/19988/7/19988/7/1998PCANC
Details
this is for a conf only no framing is to be covered
INSP - Wall cover8/7/19988/7/19988/7/1998 PART
Details
08/07/98 338 - bob ###-#### struc. and wall need to supply ner 200 for t
INSP - Framing/Rough-in8/4/19988/5/19988/5/1998PNR
Details
08/05/98 338 - this is a conference to speak to the rated walls and fram attending Dave McKlenna, Bob Leonard, Prestom Baker and P Paine.Must rev
INSP - Framing/Rough-in8/3/19988/4/19988/4/1998ANR
Details
08/04/98 338 - NR NO ONE ON JOBSITE
INSP - Foundation6/8/19986/8/19986/8/1998PPART
Details
06/08/98 338 - Preston ###-#### FOOTINGS out of time will inspect 06-09-
INSP - Foundation6/3/19986/3/19986/3/1998PPART
Details
06/03/98 338 - MADE OK WITH SP INSP APPROVAL R-BAR IS PLACED
INSP - Foundation6/1/19986/2/19986/2/1998APART
Details
06/02/98 338 - made ok with sp insp for the west end only sp insp for th
INSP - Foundation5/27/19985/28/19985/28/1998APART
Details
AROUND 12:00-PRESTON ###-#### ok to pour only south and north walls
INSP - Concrete5/18/19985/19/19985/19/1998PPART
Details
made ok with sp insp approval
INSP - Conference5/12/19985/12/19985/12/1998 PART
Details
/ / 338 - WITH OWNERS REP PROJECT SUPER AND SP INSP
INSP - Foundation5/7/19985/7/19985/7/1998PPART
Details
05/07/98 338 - made ok to pour south wall 100 ft. +-