INSP - Final | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PART |
Jim Sly
|
|
|
01/15/98 316 - Temp Occ...Health and Welfare...Needs signature for code
|
INSP - Final | 1/13/1998 | 1/15/1998 | 1/15/1998 | A | FAIL |
Jim Sly
|
|
|
01/14/98 316 - Need signature for electrical....
|
INSP-Final Inspection | 1/9/1998 | 1/14/1998 | 1/14/1998 | A | PASS |
Joe Tawney
|
|
|
01/14/98 406 - ###-#### ROBERT REINSP OK FOR PERM OCC ADDRESS IS 1720 WESTGATE
|
INSP - Final | 12/24/1997 | 12/26/1997 | 12/26/1997 | A | CANC |
Tom Arcoraci
|
|
|
HE DIDN'T IF YOU WERE GOING TO MAKE IT WED PM OCC CARD NOT COMPLETE CONTRACTOR WILL RE CALL FOR FINAL
|
INSP - Final | 12/24/1997 | 12/24/1997 | 12/24/1997 | P | NH |
Jim Sly
|
|
|
12/24/97 316 - HEALTH AND WELFARE No one on site...4:30 Xmas eve..left n
|
INSP-Final Inspection | 12/23/1997 | 12/24/1997 | 12/24/1997 | A | PASS |
Joe Tawney
|
|
|
12/24/97 406 - HEALTH AND WELFARE FINAL OK FOR TEMP OCC
|
INSP-Alarm Testing | 12/18/1997 | 12/22/1997 | 12/22/1997 | P | NR |
Joe Tawney
|
|
|
12/22/97 406 - ALARM TEST NOT READY APPROVED SUBMITTALS NOT ON SITE
|
INSP - Final | 12/19/1997 | 12/19/1997 | 12/21/1997 | P | PART |
Jim Sly
|
|
|
12/21/97 316 - Conference with superintendent for requirements for final
|
INSP - Final | 12/19/1997 | 12/19/1997 | 12/19/1997 | | NR |
Jim Sly
|
|
|
12/19/97 316 - Conference with superintendant for requirements for final
|
INSP - Framing/Rough-in | 12/10/1997 | 12/11/1997 | 12/11/1997 | A | PART |
Jim Sly
|
|
|
12/10/97 316 - Ceiling grid inspection...2 areas to west OK (areas sep b
|
INSP - Energy code compliance | 12/4/1997 | 12/4/1997 | 12/4/1997 | P | PASS |
Jim Sly
|
|
|
Insulation OK entire bldg.
|
INSP - Framing/Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | | PART |
Jim Sly
|
|
|
/ / 316 - Framing OK far East end and including 1hr wall...
|
INSP - Framing/Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | P | PART |
Jim Sly
|
|
|
health and welfare Far East end OK frame.
|
INSP - Carpentry | 12/3/1997 | 12/3/1997 | 12/3/1997 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...Arch to submit detail for duct penitr @ 2hr wall.
|
INSP - Framing/Rough-in | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Jim Sly
|
|
|
12/01/97 316 - Looked at framing on far East end.....OK
|
INSP - Framing/Rough-in | 11/26/1997 | 11/28/1997 | 11/28/1997 | A | PART |
Tom Arcoraci
|
|
|
WESTGATE PHASE 11 SHELL AND CORE
|
INSP-Final Inspection | 11/21/1997 | 11/21/1997 | 11/21/1997 | | PASS |
Joe Tawney
|
|
|
11/21/97 406 - CONFERENCE ON LOCATION OF FIRE EXT ALSO OK TO COVER ON CE
|
INSP - Framing/Rough-in | 11/18/1997 | 11/19/1997 | 11/19/1997 | A | PART |
Jim Sly
|
|
|
11/18/97 316 - Inspection of framing section next to West end (section).
|
INSP - Energy code compliance | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PART |
Jim Sly
|
|
|
11/14/97 316 - Far West Section Ok
|
INSP - Framing/Rough-in | 11/14/1997 | 11/14/1997 | 11/14/1997 | P | PART |
Jim Sly
|
|
|
11/14/97 316 - Interior walls ..far West section OK...
|
INSP - Framing/Rough-in | 11/12/1997 | 11/13/1997 | 11/13/1997 | A | FAIL |
Jim Sly
|
|
|
11/12/97 316 - FIRE WALL AND METAL STUDS Need fire smoke dampers...2hr w
|
INSP - Conference | 11/7/1997 | 11/10/1997 | 11/10/1997 | A | PASS |
Jim Sly
|
|
|
11/07/97 316 - Conference with Gene from Petra - fire walls, etc. OK : )
|