Permanent Occupancy | | 8/17/1998 | 8/17/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/5/1998 | 8/5/1998 | 8/5/1998 | P | PASS |
Joe Tawney
|
|
|
08/05/98 406 - ###-#### please call he will need to meet you out there REINSP OK FOR PERM OCC
|
INSP - Final | 6/18/1998 | 6/18/1998 | 6/18/1998 | P | PART |
|
|
|
06/18/98 338 - made ok for temp occ, life safety and plmg ele are temp.
|
INSP-Final Inspection | 6/18/1998 | 6/18/1998 | 6/18/1998 | P | PART |
Joe Tawney
|
|
|
06/18/98 406 - final jim ###-#### REINSP OK FOR TEMP OCC ADDRESS RISER ROOM AIR BALANCE REPORT
|
INSP-Final Inspection | 6/16/1998 | 6/16/1998 | 6/16/1998 | P | FAIL |
Joe Tawney
|
|
|
06/16/98 406 - Jim ###-#### REINSP FAIL FEW ITEMS LEFT FOR TEMP AND FINAL
|
INSP-Final Inspection | 6/11/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Joe Tawney
|
|
|
06/12/98 406 - temp occ. arround 11 a.m. ###-####/ FINAL FAIL ANSUL SYSTEM TESTS EMERG AND EXIT LIGHTS
|
INSP-Sprinkler Rough-in/Hydro | 6/11/1998 | 6/11/1998 | 6/11/1998 | P | FAIL |
Joe Tawney
|
|
|
06/11/98 406 - sprinkler ###-#### jim FINAL FAIL ALARM SYSTEM EXIT AND EMERG LIGHTS
|
INSP - Framing/Rough-in | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
|
|
|
06/05/98 338 - final on ceiling/ ###-#### jim ceiling grid ok to drop in the tiles willcheck slack wires again at the
|
INSP-Sprinkler Rough-in/Hydro | 6/3/1998 | 6/3/1998 | 6/3/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
|
INSP-Conference | 6/1/1998 | 6/1/1998 | 6/1/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF ON TAMPER SWITCHES FOR ANTI FREEZE LOOP VLVS
|
INSP-Conference | 5/27/1998 | 5/27/1998 | 5/27/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - PROFIT CONFERENCE WANT OCC BY 6/19/98
|
INSP - Final | 5/20/1998 | 5/21/1998 | 5/21/1998 | A | PASS |
|
|
|
OK TO COVER THE SHAFTS
|
INSP - Framing/Rough-in | 5/19/1998 | 5/20/1998 | 5/20/1998 | A | PART |
|
|
|
grease duct chase ###-#### they are to recall whith verbal correction repairs
|
INSP - Framing/Rough-in | 5/13/1998 | 5/14/1998 | 5/15/1998 | A | PASS |
|
|
|
05/15/98 338 - grease chase ###-#### FAIL BAD CLEARANCES AND POOR WORKM
|
INSP - Framing/Rough-in | 4/20/1998 | 4/21/1998 | 4/21/1998 | A | PART |
|
|
|
04/21/98 338 - approved and posted resubmittals for the duct shaft attac
|
INSP - Framing/Rough-in | 3/30/1998 | 3/31/1998 | 3/31/1998 | A | PART |
|
|
|
made ok to insulate ext walls only
|
INSP-Supply line flush | 3/25/1998 | 3/26/1998 | 3/26/1998 | A | PASS |
Joe Tawney
|
|
|
03/26/98 406 - 8:30 AS PER 406-GREGG ###-#### DIGITIAL OK ON UNDERGROUND FLUSH
|
INSP - Framing/Rough-in | 3/17/1998 | 3/18/1998 | 3/18/1998 | P | PART |
|
|
|
03/18/98 338 - sheer wall roof sheathing nailing harold ###-####
|