INSP - Final | 12/16/1998 | 12/16/1998 | 12/16/1998 | | PASS |
|
|
|
12/16/98 338 - made ok for perm other agencies approved
|
INSP-Final Inspection | 12/16/1998 | 12/16/1998 | 12/16/1998 | | PASS |
Joe Tawney
|
|
|
12/16/98 406 - CLAY ###-#### FN FIRE INSP REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 12/16/1998 | 12/16/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/28/1998 | 10/29/1998 | 11/29/1998 | P | FAIL |
Joe Tawney
|
|
|
10/29/98 406 - CLAY ###-#### 1:00 ? PER JOE FINAL ALARM TEST FAIL NUMBER OF ITEMS NEED CORRECTING
|
INSP-Final Inspection | 11/2/1998 | 11/3/1998 | 11/3/1998 | A | PART |
Joe Tawney
|
|
|
11/03/98 406 - CLAY- ###-#### REINSP OK FOR TEMP OCC
|
INSP - Final | 11/2/1998 | 11/2/1998 | 11/3/1998 | P | FAIL |
|
|
|
11/03/98 338 - ###-####- CLAY FN OCC INSP
|
INSP-Final Inspection | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | FAIL |
Joe Tawney
|
|
|
11/02/98 406 - CLAY ###-#### FIRE FN-ALARM SYS INSP REINSP FAIL 24 ITEM C/N ISSUED
|
INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | CANC |
|
|
|
CLAY ###-#### alarms were not ready - try again on monday
|
INSP-Final Inspection | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | FAIL |
Joe Tawney
|
|
|
10/26/98 406 - clay ###-#### final fire REINSP OF SPKLR SYSTEM FAIL FEW ITEMS LEFT
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Joe Tawney
|
|
|
10/26/98 406 - clay ###-#### OK ON HYDRO TEST FOR 1ST AND 2ND FLOORS
|
INSP-Final Inspection | 10/21/1998 | 10/22/1998 | 10/23/1998 | P | FAIL |
Joe Tawney
|
|
|
10/22/98 406 - CLAY -###-#### -FN FIRE-HYDRO-STATIC 1 & 2-STAND PIPE INS HYDRO TEST 1 & 2 FLRS FAIL 1ST FLR ROUGH IN FAIL BRACING NOT COMPLETE
|
INSP-Final Inspection | 10/20/1998 | 10/20/1998 | 10/20/1998 | P | FAIL |
Joe Tawney
|
|
|
10/20/98 406 - clay-###-####-ROOM 417 -2,3, 4TH VENDING STORAGE ROOM REINSP 3RD & 4TH FLRS FAIL BRACING SPKLR HDS STANDPIPE CAPS
|
INSP-Final Inspection | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | FAIL |
Joe Tawney
|
|
|
10/19/98 406 - CLAY ###-#### FINAL ON 3RD AND 4TH REINSP 3RD & 4TH FLOORS FAIL ALL CORRECTION ITEMS NOT COMPLETED
|
INSP-Final Inspection | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
Joe Tawney
|
|
|
10/16/98 406 - CLAY ###-#### FINAL SPKLR INSP 3RD & 4TH FLRS FAIL OK ON HYDRO TEST 3RD & 4TH FLRS ì
|
INSP-Final Inspection | 10/14/1998 | 10/15/1998 | 10/15/1998 | P | CANC |
Joe Tawney
|
|
|
10/15/98 406 - CLAY ###-#### 3RD AND 4TH FLOOR HYDRO AND FINAL CANCELLED
|
INSP-Conference | 8/27/1998 | 8/27/1998 | 8/27/1998 | P | PART |
Joe Tawney
|
|
|
08/27/98 406 - charlie ###-#### CONF ON PROJ BEAM DETECTOR NO INFO AVAIL TO VERIFY LOCATION
|
INSP-Sprinkler Rough-in/Hydro | 8/10/1998 | 8/10/1998 | 8/10/1998 | P | PART |
Joe Tawney
|
|
|
08/10/98 406 - clay ###-#### OK ON UNDERGROUND FLUSH ì
|
INSP-Sprinkler Rough-in/Hydro | 7/30/1998 | 7/30/1998 | 7/30/1998 | A | PART |
Joe Tawney
|
|
|
07/30/98 406 - clay ###-#### OK ON ROUGH IN OF SPKLR SYSTEM IN CENTER AREA OF 1ST FLOOR
|
INSP - Framing/Rough-in | 7/22/1998 | 7/22/1998 | 7/23/1998 | P | PART |
|
|
|
07/22/98 338 - clay ###-#### for fr where is clay no answer at the conta
|
INSP-Final Inspection | 6/24/1998 | 6/25/1998 | 6/25/1998 | P | PART |
Joe Tawney
|
|
|
06/25/98 406 - clay ###-#### OK ROUGH IN FOR NW WING 4TH FLR EXC JACUZZI SUITES ì
|
INSP - Conference | 6/24/1998 | 6/24/1998 | 6/24/1998 | | NR |
Carl Dependahl
|
|
|
/ / 340 - unable to contact; no name or ph#
|
INSP-Conference | 5/20/1998 | 6/24/1998 | 6/24/1998 | P | NR |
Carl Dependahl
|
|
|
AS PER 338; no name, unable to contact.
|
INSP - Framing/Rough-in | 6/22/1998 | 6/22/1998 | 6/22/1998 | P | PASS |
|
|
|
06/22/98 338 - clay ###-#### MADE OK TO CONTINUE WITH THE 4TH FLOOR IN THE GUEST ROOMS ONLY
|
INSP-Conference | 5/20/1998 | 6/17/1998 | 6/17/1998 | P | PART |
|
|
|
06/18/98 338 - AS PER 338 made ok for the cover of the guest units of the 3rd floor west wing
|
INSP-Sprinkler Rough-in/Hydro | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Joe Tawney
|
|
|
06/11/98 406 - 3rd floor / clay ###-#### OK ON ROUGH IN OF NORTH WING OF 3RD FLOOR
|
INSP-Conference | 5/20/1998 | 6/10/1998 | 6/10/1998 | P | CANC |
|
|
|
06/09/98 338 - BY THE CONTR.
|
INSP-Conference | 5/20/1998 | 6/3/1998 | 6/3/1998 | P | PART |
|
|
|
06/03/98 338 - MADE OK TO COVER GUEST ROOMS IN THE 2ND FLOOR WEST WING
|
INSP-Final Inspection | 6/1/1998 | 6/2/1998 | 6/2/1998 | A | PART |
Joe Tawney
|
|
|
06/02/98 406 - 2nd floor clay ###-#### OK ON ROUGH IN OF NORTH EAST WING OF 2ND FLOOR
|
INSP-Conference | 5/20/1998 | 5/27/1998 | 5/27/1998 | P | PART |
|
|
|
PART
|
INSP - Framing/Rough-in | 5/22/1998 | 5/26/1998 | 5/26/1998 | A | PART |
|
|
|
4th floor clay ###-#### ok to insulate and hang ceilings of units in the east wing only
|
INSP-Conference | 5/20/1998 | 5/20/1998 | 5/20/1998 | P | PART |
|
|
|
ok to cover the laundry room and insul in progress throughout 1 ceiling at suite
|
INSP-Final Inspection | 5/18/1998 | 5/19/1998 | 5/19/1998 | A | PART |
Joe Tawney
|
|
|
05/19/98 406 - ###-#### OK ON ROUGH IN OF 3RD FLR EAST WING
|
INSP - Framing/Rough-in | 5/8/1998 | 5/12/1998 | 5/12/1998 | A | PART |
|
|
|
05/12/98 338 - made ok to cover guest rooms in the 3rd floor east wing a
|
INSP - Framing/Rough-in | 5/7/1998 | 5/8/1998 | 5/8/1998 | P | PART |
|
|
|
05/08/98 338 - 2nd floor guest rooms only for cover fire caulk ok
|
INSP - Framing/Rough-in | 5/6/1998 | 5/7/1998 | 5/7/1998 | A | PASS |
|
|
|
05/07/98 338 - 2nd floor east rooms only verbal corrections ok to insula
|
INSP-Sprinkler Rough-in/Hydro | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Joe Tawney
|
|
|
04/28/98 406 - john ###-#### OK ROUGH IN ON 1ST, 2ND, & 3RD FLR EAST WING OK TO COVER EXC CORRIDOR
|
INSP - Conference | 4/16/1998 | 4/16/1998 | 4/16/1998 | | PART |
|
|
|
/ / 338 - conf on combustable trim placement
|
INSP - Framing/Rough-in | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PART |
|
|
|
04/15/98 338 - ok to cover in the pump/sorage roomclay ###-#### framing
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
|
|
|
04/09/98 338 - verbal corrections to repair fireproofing and recall for
|
INSP - Framing/Rough-in | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | PART |
Jim Storey
|
|
|
LOBBY \\ ###-#### CLAY lobby ceilling ok
|
INSP - Foundation | 5/1/1998 | 5/1/1998 | 4/1/1998 | P | PART |
|
|
|
###-####meeting with clay odell on the cover of units ok to start cover on the east wing first floor units only.
|
INSP - Framing/Rough-in | 3/13/1998 | 3/17/1998 | 3/17/1998 | A | NR |
|
|
|
03/17/98 338 - CONFERENCE WITH CLAY AT ###-####--AMERITEL INN made ok co
|
INSP - Concrete | 3/9/1998 | 3/10/1998 | 3/8/1998 | A | PART |
|
|
|
03/10/98 338 - poured and sp insp approvalSLAB POUR--CLAY ###-####
|
INSP - Conference | 2/26/1998 | 2/26/1998 | 2/26/1998 | | PART |
|
|
|
/ / 338 - met with gslane,barchibald,kmaurer, per questions raised by
|
INSP - Framing/Rough-in | 2/19/1998 | 2/19/1998 | 2/20/1998 | P | PART |
|
|
|
02/19/98 338 - conf on fire proofingPRE CONSTRUCTION MEETING--CLAY 870-7
|
INSP - Framing/Rough-in | 2/17/1998 | 2/17/1998 | 2/19/1998 | P | NR |
|
|
|
02/17/98 338 - CONFERENCE ###-#### CLAY postponed
|
INSP-Conference | 2/13/1998 | 2/17/1998 | 2/17/1998 | A | CANC |
Wes Worcester
|
|
|
02/17/98 342 - CLAY ###-#### cancelled by Clay until 2/18
|
INSP - Framing/Rough-in | 1/15/1998 | 1/15/1998 | 1/15/1998 | P | PASS |
|
|
|
01/15/98 338 - conf. clay ###-####
|