Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD97-02956
StatusFinaled
Name LORENE SPEAR
Site Address 2405 S GEKELER LN
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1202 sq. ft. one story single family dwelling with a 290 sq. ft. unfinished basement a 426 sq. ft. attached two car garage and 96 sq. ft. concrete patio per approved plans and attached requirement lists. Note: Seperate permit will be required to finish basement. Special inspection is required on polysteel form systems. Provide inspection records to Boise City Structural Inspector. Note: Reward foundation system does not have approved testing through ICBO. Engineered calculations are provided for structural analysis. See condition list. ACHD #98-0005 PC #764 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
12/19/97 301 - Final FNL -OK FINAL
INSP - Final12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
12/19/97 301 - Final FNL -OK FINAL
INSP - Letter of compliance12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 14208
INSP - Letter of compliance12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 14208
INSP - Letter of compliance12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 14208
INSP - Letter of compliance12/19/199712/19/199712/19/1997 PASS
DetailsJim Storey
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 14208
INSP - Energy code compliance11/28/199711/28/199711/28/1997 PASS
DetailsJim Storey
/ / 301 - INSL-OK INSULATION-ENERGY CODE
INSP - Framing/Rough-in11/26/199711/26/199711/28/1997PPASS
DetailsJim Storey
11/26/97 301 - Wanted an additional inspection if you don't pass him at FRAM-OK FRAMING
INSP - Framing/Rough-in11/25/199711/26/199711/26/1997PPART
DetailsJim Storey
11/26/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to insulate
INSP - Conference11/18/199711/18/199711/18/1997 FAIL
Conference w/Foundation supplier.#1. Product is not approved by this jurisdiction,no ICBO or supporting analysis (info from Bob G.). #2. Contractor proceeded beyond early start permit(framing stage).#3 Product not installed per manufactures requirements. #4 Foundation is to be removed and replaced w/conventional wall.
INSP - Miscellaneous11/17/199711/17/199711/17/1997AFAIL
DetailsJim Storey
11/17/97 301 - Place a swo on this project for unapproved material and i manufactures recomendations, #325. stop work posted...
INSP - Footings10/29/199710/29/199710/30/1997PFAIL
DetailsJim Storey
10/29/97 301 - will you please check on the foundation between 2401 and that was poured w/o an inspection to see if the space between them are correct. no plan on site, p/l not able to find pins, fence is 5' from footing on side, early sta
INSP - Footings10/22/199710/22/199710/23/1997PPART
DetailsJim Storey
10/22/97 301 - Early start - Hi rickshaw rider!! EAR-EARLY START POURED WITHOUT INSPECTION