INSP - Grading Inspection | 7/7/1998 | | 7/7/1998 | | PASS |
Rita DeYoung
|
|
|
Revegetation and final grading have been completed. $500.00 bond can be released.
|
INSP - Final | 2/20/1998 | 2/23/1998 | 2/23/1998 | A | NR |
Wes Worcester
|
|
|
02/22/98 342 - ryan cont ###-#### tile roof not complete
|
INSP - Final | 2/23/1998 | 2/23/1998 | 2/23/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - ryan called and roofer arrived on site to finish valley's
|
INSP - Energy code compliance | 12/2/1997 | 12/3/1997 | 12/3/1997 | P | PASS |
Wes Worcester
|
|
|
12/02/97 342 -
|
INSP - Framing/Rough-in | 12/1/1997 | 12/2/1997 | 12/2/1997 | A | PART |
Wes Worcester
|
|
|
12/01/97 342 -
|
INSP - Framing/Rough-in | 12/1/1997 | 12/1/1997 | 12/1/1997 | P | PASS |
Wes Worcester
|
|
|
12/01/97 342 -
|
INSP - Conference | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - met w/Steve on site and went over setbacks....per site plan
|
INSP - Footings | 10/20/1997 | 10/21/1997 | 10/21/1997 | A | PASS |
Wes Worcester
|
|
|
10/21/97 342 -
|
INSP - Foundation | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PASS |
Wes Worcester
|
|
|
/ / 342 - per site plan
|
INSP - Foundation | 10/21/1997 | 10/21/1997 | 10/21/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - noted difference between site plan and grading plan...13 vs
|
INSP - Footings | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PART |
Wes Worcester
|
|
|
10/20/97 342 - ck nw corner of garage as property pin on No side (sunnyr
|
INSP - Site Preparation | 10/20/1997 | 10/20/1997 | 10/20/1997 | | NR |
Wes Worcester
|
|
|
/ / 342 - NW corner of garage not string lined as property pin was kno
|