Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-03096
StatusFinaled
Name THE BON MARCHE
Site Address 370 N MILWAUKEE ST
Project NameBTS - THE BON MARCHE
Customer Number 
ePlanReviewNo
Description
To finish the inside of the 28,862 sq.ft. shell built under BLD97-1876 and remodel the interior of the existing 2 story structure per approved plans on file. Work to include the addition of a complete smoke control system. NOTE: Fire sprinklers with quick response head and smoke removal system is existing for area increase. MJP (P.C.#665-97)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/14/19988/14/1998 DONE
Details
INSP - Final7/23/19987/24/19987/24/1998PPASS
Details
07/24/98 338 - SIGNED THE TEMP COL OF THE OCC REQ CARD FOR PHASE 5
INSP-Final Inspection7/23/19987/24/19987/24/1998APASS
DetailsJoe Tawney
07/24/98 406 - FINAL POSSIBLE A TEMP OCC. JOHN ###-#### THE BON MARCHE REINSP OK ON PHASE 5 AND OK FOR PERM OCC & OR CERT OF COMPLETION
INSP - Final7/6/19987/7/19987/7/1998PPART
Details
07/07/98 338 - TCO -TEMP C OF O ISSUED ok for same i signed the occ req
INSP-Final Inspection7/6/19987/7/19987/7/1998PPART
DetailsJoe Tawney
07/07/98 406 - John ###-#### OK FOR TEMP OCC OF PHASE VI ì
INSP - Final6/9/19986/10/19986/10/1998PPART
DetailsJoe Tawney
06/10/98 406 - JOHN ###-#### AND 338 IS ALSO SCHEDULED TO GO OUT TEMP OCC FINAL OK FOR TEMP ON PHASE IV
INSP-Conference6/9/19986/10/19986/10/1998PPASS
Details
06/09/98 338 - OK FOR THE PHASE 5 OF PROJECT FOR TEMP OCC
INSP-Final Inspection6/3/19986/3/19986/3/1998PPART
DetailsJoe Tawney
06/03/98 406 - fire sprinkle Mike ###-#### OK SPKLR PROTECTION FOR ESCALATOR OPENING OK RI FOR PHASE 4 PART PHASE 5
INSP - Final5/13/19985/14/19985/14/1998PPART
Details
05/14/98 338 - signed the temp col for this phase
INSP-Final Inspection5/13/19985/14/19985/14/1998PPART
DetailsJoe Tawney
05/14/98 406 - john ###-#### FINAL PHASE III OK FOR TEMP OCC
INSP - Final5/7/19985/11/19985/8/1998PPART
Details
05/11/98 338 - sogned the temp col called cathy to verify
INSP - Final5/7/19985/7/19985/7/1998 PART
DetailsJoe Tawney
/ / 406 - FINAL OK ON SPKLR SYSTEM COVERAGE WOMENS DEPT PHASE III
INSP-Final Inspection5/7/19985/7/19985/7/1998PPART
DetailsJoe Tawney
05/07/98 406 - ###-#### SHOE DEPT PHASE II OK FOR TEMP OCC
INSP - Framing/Rough-in4/30/19985/1/19985/1/1998APASS
Details
made ok seizmic ok935
INSP - Framing/Rough-in4/30/19984/30/19984/30/1998 CANC
Details
04/30/98 338 - cancelled till 05-01-98
INSP - Framing/Rough-in4/29/19984/30/19984/30/1998ACANC
Details
CANCELLED BY JON TILL 05-01-98
INSP - Framing/Rough-in4/30/19984/30/19984/30/1998 CANC
Details
04/30/98 338 - cancelled till 05-01-98
INSP-Final Inspection4/30/19984/30/19984/30/1998PPART
DetailsJoe Tawney
04/30/98 406 - mike ###-#### OK ON SPKLR ROUGH IN FOR MALL AREA OF BON ADD ONE HEAD
INSP - Final4/23/19984/24/19984/24/1998APASS
Details
04/24/98 338 - c/c issued final approval documentation from sp insp agen
INSP - Letter of compliance4/24/19984/24/19984/24/1998 PASS
Details
/ / 338 - # 014265
INSP - Letter of compliance4/24/19984/24/19984/24/1998 PASS
Details
/ / 338 - # 014265
INSP-Final Inspection4/22/19984/23/19984/24/1998PPART
DetailsJoe Tawney
04/23/98 406 - JOHN ###-#### FINAL OK FOR TEMP OCC ON "IN BON" PHASE OF REMODEL
INSP - Final4/22/19984/23/19984/23/1998PPART
Details
04/24/98 338 - temp made ok fire ext in place for phase 2-a/b
INSP-Final Inspection4/15/19984/16/19984/16/1998APART
DetailsJoe Tawney
mike ###-#### OK ON ROUGH IN OF IN BON PORTION OF REMODEL
INSP - Framing/Rough-in4/7/19984/7/19984/7/1998PPART
Details
04/07/98 338 - verify slip joint at the attachment of the overhead door
INSP - Final3/24/19983/27/19983/27/1998APART
Details
03/27/98 338 - TCO -TEMP C OF O ISSUED by cathy for the 2nd phase/additi
INSP-Final Inspection3/24/19983/27/19983/27/1998APASS
DetailsJoe Tawney
03/27/98 406 - 7:00 as per 406 and 338 john ###-#### FINAL OK FOR TEMP OCC OF NEW ADDITION
INSP-Alarm Testing3/25/19983/26/19983/26/1998APART
DetailsJoe Tawney
03/26/98 406 - JOHN ###-#### ALARM TEST OK ON SIGNALLING DEVICES, PULLS, & SMOKE DET DUCT DET NOT TES
INSP-Conference3/23/19983/23/19983/23/1998 PASS
DetailsJoe Tawney
/ / 406 - CONF ON SMOKE EVAC SYSTEM AND FINAL INSPECTION SCHEDULE WITH
INSP - Conference3/17/19983/17/19983/17/1998 PART
Details
/ / 338 - with Jon Anderson on the signoffs needed for temp occ on the
INSP - Framing/Rough-in3/9/19983/11/19983/10/1998PCANC
Details
CONFERENCE WITH JOHN FOR 2:00 PLEASE--###-####. HE WILL CALL YOU TO CONFIRM.. cancelled as per 338.mps
INSP-Conference3/9/19983/11/19983/10/1998PCANC
DetailsJoe Tawney
JOHN WILL CALL TO CONFIRM 2:00 WITH YOU..###-#### cancelled as per 338.mps
INSP - Conference3/10/19983/10/19983/10/1998 PART
Details
/ / 338 - with Jack Bolar and jon anderson ---requiremens for the smok
INSP - Conference3/9/19983/9/19983/9/1998 PASS
Details
/ / 338 - with jon on conf request of an inspection to determin possib of new 20,000 s.f. addition prior to the installation of the new evac sy the system parts are not to arrive until same date as gand opening conf for wed p.m. 03
INSP - Conference3/9/19983/9/19983/9/1998 PASS
Details
/ / 338 - with jon on conf request of an inspection to determin possib of new 20,000 s.f. addition prior to the installation of the new evac sy the system parts are not to arrive until same date as gand opening conf for wed p.m. 03
INSP - Framing/Rough-in3/5/19983/6/19983/6/1998APART
Details
03/06/98 338 - most of 2nd 1/2 of ceiling gridScheduled by Hello!. Cont
INSP - Framing/Rough-in3/4/19983/5/19983/5/1998ACANC
Details
03/05/98 338 - cancelled by jonScheduled by Hello!. Contact phone is [8
INSP - Framing/Rough-in2/19/19982/20/19982/20/1998PPART
Details
02/20/98 338 - east 1/3 ceiling grid ok ###-#### jon
INSP - Framing/Rough-in2/10/19982/11/19982/11/1998APART
Details
02/11/98 338 - jon ###-#### framing mADE OK SP INSP TO VERIFY INSTALL OF