BLD-Final | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PASS |
|
|
|
penthouse occ--jeff ###-#### 2 new exit signs and occ. Load signs.
|
BLD-Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
|
|
|
Ok for occ.
|
BLD-Final | 11/4/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
|
|
|
Ok for occ. L/C issued #18292
|
INSP-Conference | 5/6/1999 | 5/6/1999 | 5/6/1999 | P | PART |
Rick Jackson
|
|
|
damper for west stair now working
|
INSP-Conference | 5/5/1999 | 5/5/1999 | 5/5/1999 | A | PART |
Rick Jackson
|
|
|
voice evac working - fire watch not needed; left c/n for smoke control station for fans; damper for west fan not working
|
INSP - Final | 4/30/1999 | 5/3/1999 | 5/3/1999 | A | PART |
Rick Jackson
|
|
|
temp occ approved - c/n issued
|
INSP - Final | 4/30/1999 | 5/3/1999 | 5/3/1999 | A | PART |
|
|
|
alarm testing and str walkthrough, made ok for temp occ with full time fire watch whenever tenants are in the building. c/n issued.
|
INSP - Final | 4/29/1999 | 4/30/1999 | 4/30/1999 | P | FAIL |
|
|
|
04/30/99 338 - will reschedule for 05-03-99
|
INSP-Alarm Testing | 4/28/1999 | 4/30/1999 | 4/30/1999 | A | NR |
Rick Jackson
|
|
|
Dan ###-#### panel not ready
|
INSP-Conference | 4/27/1999 | 4/27/1999 | 4/27/1999 | A | PART |
Rick Jackson
|
|
|
discussed c/n issued for generator problems with Robert. items to be fixed prior to occupancy
|
INSP-Final Inspection | 4/27/1999 | 4/27/1999 | 4/27/1999 | P | PART |
Rick Jackson
|
|
|
smoke pressure test of 7th floor - data indicates it passed test
|
INSP-Final Inspection | 4/26/1999 | 4/26/1999 | 4/26/1999 | A | FAIL |
Rick Jackson
|
|
|
generator test failed - overheated
|
INSP-Final Inspection | 4/12/1999 | 4/12/1999 | 4/12/1999 | P | PART |
Rick Jackson
|
|
|
Mike will be on site 8th floor final 8th floor hyro okay - not a final
|
INSP - Framing/Rough-in | 4/8/1999 | 4/8/1999 | 4/9/1999 | P | PART |
|
|
|
04/08/99 338 - made ok for the rest room cover at the penthouse
|
INSP-Final Inspection | 4/6/1999 | 4/6/1999 | 4/6/1999 | P | PART |
Rick Jackson
|
|
|
###-#### MIKE//FINAL FLRS 2,6 &7 not a final - hydro of floors 2, 6 and 7 okay
|
INSP - Framing/Rough-in | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | PART |
|
|
|
04/05/99 338 - made ok for cover cept the bathroom walls confirm frp and
|
INSP-Final Inspection | 3/25/1999 | 3/29/1999 | 3/29/1999 | A | PART |
Rick Jackson
|
|
|
###-#### mike tested fire pump and standpipe flows - okay. alarms not connected or complete
|
INSP - Framing/Rough-in | 3/23/1999 | 3/23/1999 | 3/23/1999 | | PART |
|
|
|
03/23/99 338 - conf with super and owner on the start up proceedure
|
INSP-Conference | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | PART |
Rick Jackson
|
|
|
Jeff Langan at ###-####. discussed final requirements; smoke test; alarms for TI's not okay; lobbys needed
|
INSP - Framing/Rough-in | 3/17/1999 | 3/18/1999 | 3/18/1999 | P | PART |
|
|
|
03/18/99 338 - c/n issued for the core area other c/n of 031699 madeok
|
INSP - Framing/Rough-in | 3/9/1999 | 3/10/1999 | 3/10/1999 | P | PART |
|
|
|
03/10/99 338 - part made ok verbal cn being done
|
INSP-Conference | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | PART |
Rick Jackson
|
|
|
left letter requesting alarm plans with CSDI
|
INSP - Framing/Rough-in | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | FAIL |
|
|
|
03/08/99 338 - still must confirm penetration protection.
|
INSP-Sprinkler Rough-in/Hydro | 3/8/1999 | 3/8/1999 | 3/8/1999 | | PART |
Rick Jackson
|
|
|
/ / 409 - VORTEX PLATE INSTALLED IN WATER TANK - OKAY TO COVER TANK
|
INSP-Conference | 3/4/1999 | 3/4/1999 | 3/4/1999 | A | PART |
Rick Jackson
|
|
|
profit meeting
|
INSP - Framing/Rough-in | 2/16/1999 | 2/17/1999 | 2/17/1999 | P | PART |
|
|
|
02/17/99 338 - WITH PAT AND FIRE SEALER FOR THE FLOOR PERIMETER
|
INSP - Framing/Rough-in | 1/11/1999 | 1/14/1999 | 1/15/1999 | A | PART |
|
|
|
01/14/99 338 - madeok with sp insp approval
|
INSP - Framing/Rough-in | 1/11/1999 | 1/11/1999 | 1/11/1999 | P | FAIL |
|
|
|
01/11/99 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 1/11/1999 | 1/11/1999 | 1/11/1999 | P | PART |
|
|
|
01/11/99 333 - 7th core ok
|
INSP - Framing/Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 | P | PART |
|
|
|
12/28/98 333 - 6th ok
|
INSP-Sprinkler Rough-in/Hydro | 12/14/1998 | 12/14/1998 | 12/14/1998 | A | FAIL |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/11/1998 | 12/11/1998 | 12/11/1998 | P | CANC |
Joe Tawney
|
|
|
12/11/98 406 - GREG ###-#### PAGER CANCEL RESCHEDULE FOR 12/14/98
|
INSP - Framing/Rough-in | 12/10/1998 | 12/11/1998 | 12/10/1998 | A | PART |
|
|
|
12/11/98 333 - 2nd and 3rd floor ok
|
INSP - Framing/Rough-in | 12/10/1998 | 12/10/1998 | 12/10/1998 | | PART |
|
|
|
12/10/98 333 - third and fourth floor corridors and baths
|
INSP - Framing/Rough-in | | | 12/10/1998 | | PART |
|
|
|
12/10/98 333 - PAT SIMONS ###-####
|
INSP - Framing/Rough-in | 12/3/1998 | 12/4/1998 | 12/4/1998 | A | PART |
|
|
|
12/04/98 333 - fire stop conference
|
INSP - Framing/Rough-in | 11/20/1998 | 11/23/1998 | 11/23/1998 | A | PART |
|
|
|
11/23/98 333 - 1st second and basement
|
INSP - Concrete | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | PASS |
Bob Archibald
|
|
|
PAT AT ###-####. Covered by special inspection.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/30/1998 | 10/30/1998 | P | PART |
Rick Jackson
|
|
|
GREG ###-#### 1:15 checked 3rd floor - check sway bracong requirements on feed main
|
INSP-Supply line flush | 10/29/1998 | 10/30/1998 | 10/30/1998 | P | PASS |
Rick Jackson
|
|
|
GREG ###-#### 1:15 underground flush okay
|
INSP - Framing/Rough-in | 10/13/1998 | 10/14/1998 | 10/14/1998 | P | PART |
|
|
|
10/14/98 333 - basement all but soffits
|
INSP-Sprinkler Rough-in/Hydro | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PART |
Rick Jackson
|
|
|
pat simons ###-#### fire r-in insp requested location for outside bell - northeast wall
|
INSP - Concrete | 10/8/1998 | 10/9/1998 | 10/9/1998 | A | CANC |
Dave Lightfoot
|
|
|
10/09/98 337 - pat ###-####
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | A | PART |
|
|
|
resubmittal
|
INSP-Sprinkler Rough-in/Hydro | 10/1/1998 | 10/2/1998 | 10/2/1998 | A | PART |
Rick Jackson
|
|
|
GREG ###-#### PAGER checked the placement of the standpipe hose outlets in stairs - okay.
|
INSP - Concrete | 9/24/1998 | 9/25/1998 | 9/25/1998 | A | PART |
|
|
|
09/25/98 333 - ok floor
|
INSP-Conference | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PART |
Rick Jackson
|
|
|
okay to bury underground - not connected to city, still requires flush and hydro. reviewed sprinkler plans and temporary standpipe.
|
INSP - Framing/Rough-in | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | PART |
|
|
|
first floor in progress
|
INSP - Concrete | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
Tom Arcoraci
|
|
|
09/18/98 408 - PAT ###-####-POUR SLAB INSP-4TH FLOOR SPEC INSP ON SITE TMA
|
INSP - Framing/Rough-in | 9/3/1998 | 9/8/1998 | 9/8/1998 | A | PART |
|
|
|
09/08/98 333 - talked about firestoping req with elect
|
INSP - Foundation | 9/1/1998 | 9/2/1998 | 9/2/1998 | P | PASS |
|
|
|
09/02/98 333 - pend spec insp reports
|
INSP - Concrete | 8/27/1998 | 8/28/1998 | 8/28/1998 | A | |
|
|
|
pouring stair tower on the west side ###-#### allday
|
INSP - Concrete | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | PART |
|
|
|
08/25/98 333 - pour east stair tower for the 8th floor ###-#### pour ok
|
INSP - Foundation | 8/20/1998 | 8/21/1998 | 8/21/1998 | A | PART |
|
|
|
08/21/98 333 - 5TH FLOOR STAIR OK PEND SPEC INSP REPORTS
|
INSP - Concrete | 8/14/1998 | 8/17/1998 | 8/17/1998 | A | PART |
|
|
|
08/17/98 333 - 5th floor stair
|
INSP - Concrete | 8/12/1998 | 8/14/1998 | 8/14/1998 | A | PART |
|
|
|
08/14/98 333 - 4th floor stair tower ok pend spec insp reports
|
INSP - Foundation | 7/9/1998 | 7/10/1998 | 7/10/1998 | A | PART |
Jim Storey
|
|
|
07/10/98 301 - covered w/special insp on site pending report.
|
INSP - Framing/Rough-in | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PART |
|
|
|
07/09/98 333 - third floor elevators
|
INSP - Concrete | 6/19/1998 | 6/22/1998 | 6/22/1998 | A | PART |
|
|
|
06/22/98 333 - east stair tower first pour
|
INSP - Framing/Rough-in | 6/2/1998 | 6/4/1998 | 6/4/1998 | A | PART |
|
|
|
06/04/98 333 - ok pend spec insp rep
|
INSP - Foundation | 6/2/1998 | 6/2/1998 | 6/2/1998 | | PART |
|
|
|
/ / 333 - NORTH EAST CORNER OK
|
INSP - Framing/Rough-in | 6/2/1998 | 6/2/1998 | 6/2/1998 | P | PART |
|
|
|
06/02/98 333 - north east side ok
|
INSP - Concrete | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | PART |
|
|
|
05/29/98 333 - south east ok
|
INSP - Foundation | 5/12/1998 | 5/12/1998 | 5/12/1998 | | PART |
|
|
|
/ / 333 - SOUTH EAST WALL OK
|
INSP - Foundation | 5/1/1998 | 5/1/1998 | 5/1/1998 | P | PART |
|
|
|
05/01/98 333 - ok pending special insp reports
|
INSP - Foundation | 3/17/1998 | 3/17/1998 | 3/17/1998 | | PART |
|
|
|
/ / 333 - TALKED TO JEFF HE WILL GET PERMIT TODAY
|