INSP - Final | 12/11/1998 | 12/14/1998 | 12/14/1998 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Hello!. c/n ok, l/c issued.
|
INSP - Final | 12/11/1998 | 12/11/1998 | 12/11/1998 | P | FAIL |
Carl Dependahl
|
|
|
joe ###-#### fn occ insp reconnect hvac duct, seal ext wall penetrations
|
INSP - Final | 12/9/1998 | 12/10/1998 | 12/10/1998 | P | FAIL |
Carl Dependahl
|
|
|
DAIRLD ###-#### PLEASE CALL FIRST-KEY IS ABOVE FRONT DOOR unable to access left tag.
|
INSP - Grading Inspection | 12/1/1998 | | 12/1/1998 | | PASS |
Rita DeYoung
|
|
|
Final grading and revegetaion complete and approved by Public Works.
|
INSP - Framing/Rough-in | 6/11/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Bob Archibald
|
|
|
re-inspection said meet 10:30 if possible sheet rock coming at 1 ###-#### dairle. Reasigned to 325. Fail in a.m..
|
INSP - Framing/Rough-in | 6/12/1998 | 6/12/1998 | 6/12/1998 | A | FAIL |
Wes Worcester
|
|
|
no approved plan, fire blking not done, truss eng incomplete....$42 reinspection fee due
|
INSP - Framing/Rough-in | 6/12/1998 | 6/12/1998 | 6/12/1998 | | PASS |
|
|
|
Corrections made ok in p.m..
|
INSP - Framing/Rough-in | 6/9/1998 | 6/10/1998 | 6/10/1998 | A | FAIL |
Wes Worcester
|
|
|
06/10/98 342 - 11am Dairld ###-#### said you'd be out there so...insulating w/spraytech, no masks on site except installers.
|
INSP - Framing/Rough-in | 6/10/1998 | 6/10/1998 | 6/10/1998 | P | FAIL |
Carl Dependahl
|
|
|
per bob; to meet w/ bldr, not onsite, left c/n to bring eng's letter per previous c/n, complete various fireblocks; ok to insul ext walls only.
|
INSP - Framing/Rough-in | 6/2/1998 | 6/3/1998 | 6/3/1998 | A | NR |
Wes Worcester
|
|
|
06/03/98 342 - framing/ ###-#### or ###-#### no electrical, mechanical i and approved plan w/engineering not on site...called Dairle
|
INSP - Framing/Rough-in | 4/14/1998 | 4/14/1998 | 4/14/1998 | P | FAIL |
Carl Dependahl
|
|
|
###-#### DAIRLE...keep c/n, need eng's letter, address differences from eng'd plan & approve moment frame, etc. not complete frame insp, just chkng eng'd features
|
INSP - Framing/Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Hello!. Contact phone is [3779239]. went late pm...no plan, carpentry only; c/n, need eng's ok for moment frames & eng'd features; nail off sheathing..upper & lower edges missed
|
INSP - Framing/Rough-in | 4/3/1998 | 4/2/1998 | 4/2/1998 | P | NR |
Carl Dependahl
|
|
|
not requested insp...chk sheathing at roof prior to covering...looks ok
|
INSP - Conference | 2/4/1998 | 2/4/1998 | 2/4/1998 | A | PASS |
Carl Dependahl
|
|
|
W/ BLDR RE JOIST INSERTS...OK BY BA, BUT TJI?
|
INSP - Foundation | 1/28/1998 | 1/28/1998 | 1/28/1998 | P | PART |
Carl Dependahl
|
|
|
###-####, DAVE...MET W/ CONT.& DAIRLD WIRTZ ONSITE; REQ'D ENG'S OK FOR RIGID FRAME ASSY. & EXCAVATION....ALL LOOKS OK, OK TO PROCEED W/ POUR. HD'S & BAR IN PLACE AT EXT FND.
|
INSP - Conference | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PART |
Carl Dependahl
|
|
|
LEFT NOTE AT JOBSITE FOR CONTRACTOR TO CALL ME.
|
INSP - Carpentry | 1/26/1998 | 1/23/1998 | 1/23/1998 | P | PART |
Carl Dependahl
|
|
|
CHK'D WIP, NO ONE ONSITE, NEED ENG'S OK OF SITE EXCAVATION & CLARIFICATION OF STEEL COL. IMBEDS.
|
INSP - Footings | 1/22/1998 | 1/22/1998 | 1/22/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - need engineer's letter
|
INSP - Framing/Rough-in | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | NR |
Wes Worcester
|
|
|
01/22/98 342 - FOOTINGS LOT 6 BLOCK 1 HILLSBORO SUB. ###-#### DARILD. POUR AT 10:00, 1/22/98 need ftg insp....not ready see ftg insp
|
INSP - Carpentry | 1/22/1998 | 1/22/1998 | 1/22/1997 | P | PART |
Carl Dependahl
|
|
|
has incorrect eng's letter, need prior to pour. ok to begin perimeter ftgs,. need detail for pads w/ imbeds for steel frame; told to have builder call me.
|
INSP - Framing/Rough-in | 2/20/1998 | 2/19/1998 | 2/19/1990 | A | NR |
Carl Dependahl
|
|
|
W/ FRAMER, NEED ENG'D PLANS, SHEAR INSPS
|