Permit NumberBLD97-03210
StatusFinaled
Name DAVE BERENT
Site Address 1010 N ROSE ST
Project NameIDAHY CREDIT UNION
Customer Number 
ePlanReviewNo
Description
IDAHY FEDERAL CREDIT UNION * TO ADD APPROXIMATELY 3892 SQ.FT. OF ADDITIONAL OFFICE/TELLER AREA TO THE EXISTING 7271 SQ.FT BANK BUILDING, INCLUDED IN THIS PERMIT IS A 1008 SQ.FT DRIVE UP CANOPY WHICH IS BEING SUBMITTED FOR REVIEW AS A DEFERED SUBMITTAL. THE ENTIRE BUILDING IS BEING FIRE SPRINKLERED. THE NEW ADDITION IS A SINGLE STORY, METAL FRAMED, TYPE V NONRATED, FOR THE OFFICE AREA AND THE DRIVE UP AREA IS METAL FRAME WITH SKYLIGHT GLAZING. ALL CONSTRUCTION PER THE APPROVED PLANS. ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE THE INSTALLATION OF NEW DOOR HARDWARE, IN THE EXISTING BUILDING. RELOCATING EXISTING TWO DRIVE UP TELLERS AND ADDING TWO NEW DRIVE UP TELLERS AND ADDING 12 NEW PARKING SPACES. MJP (PC# 693-97) DR121-97 CU36-97
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final11/6/199811/9/199811/9/1998APASS
Details
11/09/98 333 - STRUCTURAL OK
Permanent Occupancy 11/9/199811/9/1998 DONE
Details
INSP-Final Inspection10/6/199810/7/199810/7/1998APASS
DetailsRick Jackson
HERB ###-#### occ approved
INSP - Final8/20/19988/21/19988/21/1998APART
Details
08/21/98 333 - TEMP OK FIRE NEEDED FOR PERM STRUCT OK
INSP-Final Inspection8/19/19988/20/19988/20/1998AFAIL
DetailsRick Jackson
HERB WILL CALL TO SCHEDULE . ###-####. tampers produce alarm, not spuervisory; AHU detector not ready for test
INSP-Final Inspection8/20/19988/20/19988/20/1998PPART
DetailsRick Jackson
reinspect from 8/20 am temp occ approved. AHU detector not working. will reschedule when working properly
INSP-Final Inspection8/3/19988/3/19988/3/1998AFAIL
DetailsRick Jackson
sprinkler not monitored; panel not ready, extinguishers needed; test all tampers and flows; smoke detector needed for alarm panel; test detector for AHU
INSP-Final Inspection7/6/19987/7/19987/7/1998PPASS
DetailsRick Jackson
Patrick ###-#### hydro only okay - not a final inspection
INSP-Sprinkler Rough-in/Hydro6/18/19986/19/19986/18/1998P
DetailsRick Jackson
PATRICK ###-####
INSP-Supply line flush6/18/19986/18/19986/18/1998APASS
DetailsRick Jackson
underground flush only - okay
INSP - Foundation5/4/19985/4/19985/4/1998 PASS
Details
05/04/98 333 - olk pend special insp reports
INSP - Framing/Rough-in4/27/19984/28/19984/28/1998APART
Details
04/28/98 333 - all but center bearing wall need detail for bearing
INSP - Framing/Rough-in4/10/19984/10/19984/10/1998PPART
Details
welding ok
INSP - Foundation3/5/19983/6/19983/6/1998PPASS
Details
03/06/98 333 - pending special insp IDAHY CREDIT UNION--FOOTING--NELL 3
INSP - Foundation3/2/19983/3/19983/3/1998PPART
Details
03/03/98 333 - ftg ok pending spec insp reports