Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD97-03224
StatusFinaled
Name STEVEN HILL
Site Address 8059 W PREECE DR
Project NameSTAPLES
Customer Number 
ePlanReviewNo
Description
STAPLES THE OFFICE SUPER STORE * TO CONSTRUCT A 25206 SQ.FT. NEW SINGLE STORY, CMU EXTERIOR WALL ORIGINALLY SUBMITTED AS A TYPE II-N FULLY SPRINKLERED RETAIL STORE AND STRORAGE AREA. IT WAS RESUBMITTED ASCLASSIFIED AS A II-N BY THE ARCHITECT ALTHOUGH I CLASSIFY IT AS A V-N. IT IS SPRINKLED FOR ALLOWABLE AREA AND AS AN M OCCUPANCY OVER 12000 SQ. FT.ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT SHEET, CABO /ANSIA117.1 AND THE 1994 EDITION OF THE UBC. IT HAS A GRADING PERMIT PENDING BLD97-3458. JML DR#152-97 CU#13-96 PC#706-97
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/4/19985/4/1998 DONE
Details
INSP-Alarm Testing4/28/19984/29/19984/29/1998PPASS
DetailsJoe Tawney
04/29/98 406 - DOMINICK/PAGER###-#### - RE-INSP ON ALARMS. REINSP OK FOR PERM OCC
INSP-Final Inspection4/28/19984/28/19984/28/1998PFAIL
DetailsJoe Tawney
04/28/98 406 - reinspection dominic ###-####-voice pager REINSP FAIL ALARM SYSTEM 3 SEPARATE SIGNALS & NFPA 72 FORM
INSP-Sprinkler Rough-in/Hydro4/22/19984/23/19984/24/1998AFAIL
DetailsJoe Tawney
04/23/98 406 - ###-####- VOICE PAGER/ DOMINICK - PLEASE CALL BEFORE YOU CAN BE THERE. REINSP FAIL ALARM SYSTEM HIGH PILED STORAGE ì
INSP - Final4/10/19984/13/19984/13/1998APASS
Details
04/13/98 333 - Final on shell & core. This is the one we talked about!
INSP - Final4/10/19984/10/19984/10/1998 PART
Details
04/10/98 338 - ok for cathy to sign temp with achd approval to her
INSP-Final Inspection4/8/19984/9/19984/9/1998PPART
DetailsJoe Tawney
###-#### DOMINIQUE \STAPLES FINAL OK FOR TEMP OCC SPKLRS ALARM SYSTEM PAPERWORK
INSP-Sprinkler Rough-in/Hydro3/30/19983/31/19983/31/1998APART
DetailsJoe Tawney
03/31/98 406 - RON ###-####--WILL CALL TO SCHEDULE--STAPLES OK ON HYDRO TEST OF FDC PIPING
INSP-Sprinkler Rough-in/Hydro3/26/19983/26/19983/26/1998 PART
DetailsJoe Tawney
/ / 406 - ok on hydro test exc FDC piping ok onrough in exc coverage S
INSP - Framing/Rough-in3/20/19983/23/19983/23/1998APASS
Details
03/24/98 338 - CONFERENCE--###-####
INSP-Supply line flush3/23/19983/23/19983/23/1998 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND FLUSH
INSP - Framing/Rough-in3/4/19983/4/19983/6/1998PPASS
Details
03/05/98 338 - made ok for the rear portion ok to cover as ele insp appr int. framing
INSP - Framing/Rough-in1/20/19981/21/19981/21/1998APASS
Details
01/21/98 338 - BLOCK GROUTING ###-#### ok with sp insp approval
INSP - Framing/Rough-in1/16/19981/20/19981/20/1998APART
DetailsTom Arcoraci
MASONARY ,DOMINIQUE ###-####
INSP - Conference1/15/19981/15/19981/15/1998 PASS
Details
/ / 338 - on phone for continuity of inspections between building and
INSP - Framing/Rough-in1/15/19981/15/19981/15/1998PPART
Details
01/15/98 338 - this is for a masonry r-bar inspection r-bar is placed ok FRMS-OK FORMS-REBAR