Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD97-03332
StatusFinaled
Name BOB ERLAND
Site Address 4980 W CAMAS ST
Project NameEVENING SHADE APT.
Customer Number 
ePlanReviewNo
Description
EVENING SHADE APARTMENTS * TO CONSTRUCT A NEW 15 UNIT TWO STORY APARTMENT BUILDING ON ORCHARD AND CAMAS ST. Construction to be Type V-1Hr with two separate corridor stairways. The building is composed of one 173sf laundry room, 8-509sf one bedroom units with 116sf patio each; 4-572sf one bedroom units with 104sf patios, one 435sf one bedroom unit, and two 304sf studio units with no patios all under one roof. DR97-0144 CU45-97. ACHD # 98-0235; PRP PC#716-97
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/13/199810/13/199810/13/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC SIGNED OF BY P PAINE
INSP - Final10/12/199810/12/199810/12/1998PFAIL
DetailsJoe Tawney
10/12/98 406 - BOB WILL CALL TO SCHEDULE..###-#### FINAL FAIL SMOKE DETECTORS IN UNIT # 16
Permanent Occupancy 10/12/199810/12/1998 DONE
Details
INSP - Final10/8/199810/9/199810/12/1998PPART
Details
10/09/98 338 - made eok occ req card signed 406 c/n made ok
INSP - Energy code compliance5/22/19985/22/19985/22/1998APASS
Details
MADE OK TO COVER
INSP - Framing/Rough-in5/21/19985/22/19985/22/1998APASS
Details
MADE OK C/N REMOVED
INSP - Framing/Rough-in5/18/19985/19/19985/19/1998AFAIL
Details
bob ###-#### c/n issued fans and the recessed lights penetrations too big for 1-hour seperations.
INSP - Framing/Rough-in4/13/19984/14/19984/14/1998APART
Details
04/13/98 338 - PART MADE OK CONF ONLY VERBAL ONLYBOB ###-####-PRE FRAMIN
INSP - Framing/Rough-in3/26/19983/27/19983/27/1998APART
Details
03/27/98 338 - steel straps bob ###-#### made ok missing two straps
INSP - Concrete2/12/19982/12/19982/12/1998PPASS
Details
02/12/98 338 - FRMS-OK FORMS-REBAR
INSP - Concrete2/9/19982/9/19982/9/1998PPASS
Details
02/09/98 338 - footings ryan ###-#### ok to pour when the r-bar is place waiting for the r-bar to arrive