INSP - Final | 12/30/1998 | 12/30/1998 | 12/30/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL DUCT DETECTORS, REFRIGERATION ISSUES
|
INSP-Final Inspection | 12/29/1998 | 12/29/1998 | 12/29/1998 | P | CANC |
Joe Tawney
|
|
|
12/29/98 406 - BLAKE ###-#### CANCEL RESCHED FOR 1:00 PM 12/30/98
|
INSP - Final | 12/2/1998 | 12/2/1998 | 12/2/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP ON SPKLR SYSTEM SPKLR SYSTEM SIGNED OFF OK
|
INSP - Final | 11/10/1998 | 11/10/1998 | 11/10/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL OK FOR TEMP OCC SPKLR ITEMS, DUCT DET, EMERG GEN TIME
|
INSP-Final Inspection | 11/5/1998 | 11/5/1998 | 11/5/1998 | P | PART |
Joe Tawney
|
|
|
11/05/98 406 - BLAKE ###-#### PRE FINAL CONF AND WALK THRU WITH GEN CONTR
|
INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
|
|
|
store found to be occupying addition without any final approval from fire or structural. request for fire sprinkler contractor to produce plans to do rough-in had been ignored. informed store manager of illegal occupancy - he contacted general contractor
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
Mike Kinnear
|
|
|
Inspection of fire sprinkler roughin for occupancy with Grinnell's engineer. Found many difficiencies and left copy with store manager.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | |
Jim Sly
|
|
|
|
INSP - Final | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | FAIL |
Jim Sly
|
|
|
10/27/98 316 - C/N...Complete prev corr and add address #'s....
|
INSP - Final | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | FAIL |
Jim Sly
|
|
|
10/26/98 316 - C/N..All signatures,draftstops,letterEngineer&specinsp,P/
|
INSP-Sprinkler Rough-in/Hydro | 10/23/1998 | 10/23/1998 | 10/23/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN OF NEW SPKLR SYSTEM FAIL NEED CONF WITH SPKLR CONTR
|
INSP - Framing/ Rough-in | 10/22/1998 | 10/22/1998 | 10/22/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N...No inspection of (completed) 1hr hood shafts..Not appr
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1998 | 10/22/1998 | 10/22/1998 | A | PART |
Joe Tawney
|
|
|
10/22/98 406 - KERRY TURNER- PAGER ####-#### SPR INSP OK ON HYDRO TEST OF NEW SYSTEM EXC FDC PIPING
|
INSP - Framing/Rough-in | 10/20/1998 | 10/20/1998 | 10/20/1998 | P | PART |
Jim Sly
|
|
|
10/20/98 316 - Ceiling grid at front and South end center section...OK
|
INSP - Framing/Rough-in | 10/5/1998 | 10/6/1998 | 10/6/1998 | A | PART |
Jim Sly
|
|
|
10/06/98 316 - Ceiling grid OK at cart storage area....
|
INSP - Framing/Rough-in | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PART |
Jim Sly
|
|
|
09/18/98 316 - Insp of new store front framing..eng to specify straps..c
|
INSP - Framing/Rough-in | 9/16/1998 | 9/17/1998 | 9/17/1998 | A | NR |
Jim Sly
|
|
|
09/17/98 316 - Cancelled by Contractor...... phone is [3717146].
|
INSP - Framing/Rough-in | 9/9/1998 | 9/10/1998 | 9/10/1998 | A | CANC |
Jim Sly
|
|
|
09/10/98 316 - Done by Tom A.
|
INSP - Framing/Rough-in | 9/10/1998 | 9/10/1998 | 9/10/1998 | | PART |
Tom Arcoraci
|
|
|
/ / 408 - GRID PART OK
|
INSP - Framing/Rough-in | 8/28/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Jim Sly
|
|
|
08/31/98 316 - Insp of Ceiling grid S. sect, and Bakery...All int. soffi
|
INSP - Letter of compliance | 8/31/1998 | 8/31/1998 | 8/31/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015699
|
INSP - Letter of compliance | 8/31/1998 | 8/31/1998 | 8/31/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 015699
|
INSP-Conference | 8/27/1998 | 8/27/1998 | 8/27/1998 | P | PART |
Stan Johnson
|
|
|
08/27/98 352 - mitch ###-#### test on vents instock area
|
INSP-Sprinkler Rough-in/Hydro | 8/27/1998 | 8/27/1998 | 8/27/1998 | P | PART |
Joe Tawney
|
|
|
08/27/98 406 - Scheduled by Hello!. Contact phone is [3717149]. OK TO COVER IN STORE AREA NORTH SIDE
|
INSP - Framing/Rough-in | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | PART |
Jim Sly
|
|
|
08/25/98 316 - CEILING GRID OK at center drop...approx 3000 sq ft (exis
|
INSP - Framing/Rough-in | 8/8/1998 | 8/10/1998 | 8/10/1998 | A | PART |
Jim Sly
|
|
|
08/10/98 316 - Insp of West common wall (new sect)..between public area
|
INSP - Framing/Rough-in | 7/29/1998 | 7/29/1998 | 7/29/1998 | P | PART |
Jim Sly
|
|
|
07/29/98 316 - Ceiling grid above beer cooler OK
|
INSP - Framing/Rough-in | 7/24/1998 | 7/27/1998 | 7/27/1998 | A | FAIL |
Jim Sly
|
|
|
07/27/98 316 - Ceiling grid NR
|
INSP - Framing/Rough-in | 7/22/1998 | 7/24/1998 | 7/24/1998 | A | PART |
Jim Sly
|
|
|
07/24/98 316 - Grid ceiling OK over New camera bar.
|
INSP - Framing/Rough-in | 7/21/1998 | 7/21/1998 | 7/21/1998 | P | PART |
Jim Sly
|
|
|
07/21/98 316 - OK'd soffit and fascia framing above new meat dept.
|
INSP - Framing/Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - called cell number, left msg at office number....not screwed
|
INSP - Framing/Rough-in | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | NH |
Wes Worcester
|
|
|
/ / 342 - Scheduled by Hello!. Contact phone is [3214953]. could no
|
INSP - Framing/Rough-in | 6/30/1998 | 7/1/1998 | 7/1/1998 | A | PART |
Jim Sly
|
|
|
07/01/98 316 - Grid ceiling OK at West of Pharmacy...
|
INSP-Final Inspection | 5/29/1998 | 6/1/1998 | 6/1/1998 | A | FAIL |
Joe Tawney
|
|
|
05/31/98 406 - ###-#### partial final on phase I FINAL PHASE 1 FAIL SPKLR PROTECTION IN FLORAL COOLER AND SOFFIT PROTECTO
|
INSP - Framing/Rough-in | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | PART |
Tom Arcoraci
|
|
|
/ / 408 - ###-#### ready to move into the new pharmacy PHARMANCY FRAMING ONLY IS OK
|
INSP - Framing/Rough-in | 5/22/1998 | 5/26/1998 | 5/26/1998 | A | PASS |
Jim Sly
|
|
|
05/26/98 316 - CEILING INSPECTION/ Pharmacy......OK
|
INSP - Framing/Rough-in | 5/1/1998 | 5/4/1998 | 5/4/1998 | A | PART |
Jim Sly
|
|
|
05/04/98 316 - ###-#### conference With all trades and job superintenden
|
INSP - Framing/Rough-in | 4/30/1998 | 4/30/1998 | 5/1/1998 | P | PART |
Tom Arcoraci
|
|
|
04/30/98 408 - jason ###-#### NORTH INSIDE PHARMACY WALLS OK TO COVER AF
|
INSP - Foundation | 4/29/1998 | 4/29/1998 | 4/29/1998 | P | PART |
Jim Sly
|
|
|
04/29/98 316 - REBAR INSP Pending spec insp approval...
|
INSP - Foundation | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | PART |
Jim Sly
|
|
|
04/27/98 316 - Footing pending special inspection approval....
|