INSP - Final | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - archived final letter of completion from teracon.
|
Permanent Occupancy | | 10/6/1998 | 10/6/1998 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/2/1998 | 10/2/1998 | 10/2/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Final | 9/30/1998 | 10/1/1998 | 10/1/1998 | A | PART |
Jim Storey
|
|
|
10/01/98 301 - MATT ###-####-CALL 1ST ON FN INSP FNL -OK FINAL pending others by entry by 333.
|
INSP-Final Inspection | 9/29/1998 | 9/29/1998 | 9/30/1998 | P | |
Joe Tawney
|
|
|
matt- ###-#### fn fire insp -call 1st before insp
|
INSP-Final Inspection | 9/24/1998 | 9/25/1998 | 9/25/1998 | P | PART |
Rick Jackson
|
|
|
matt ###-#### temp occ approved - awaiting completion of alarm panel for TI (BLD98-2845)
|
INSP - Final | 9/23/1998 | 9/24/1998 | 9/24/1998 | P | PASS |
|
|
|
09/24/98 333 - final ok for perm
|
INSP-Final Inspection | 9/23/1998 | 9/24/1998 | 9/24/1998 | A | FAIL |
Joe Tawney
|
|
|
09/24/98 406 - MATT- ###-#### FN FIRE INSP FINAL FAIL ALARM SYSTEM SPKLR SYSTEM EXIT PATHWAYS
|
INSP - Final | 9/10/1998 | 9/11/1998 | 9/11/1998 | P | FAIL |
Jim Storey
|
|
|
09/11/98 301 - n/r fire call for insp when sign offs are done.
|
INSP-Sprinkler Rough-in/Hydro | 9/10/1998 | 9/11/1998 | 9/11/1998 | A | PART |
Joe Tawney
|
|
|
09/11/98 406 - randy ###-#### OK ON SPKLR HYDRO TEST
|
INSP - Framing/Rough-in | 9/4/1998 | 9/8/1998 | 9/9/1998 | A | PART |
Jim Storey
|
|
|
09/09/98 301 - MATT ###-#### SIZEMIC CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to drop ceilling.
|
INSP - Framing/Rough-in | 9/8/1998 | 9/8/1998 | 9/8/1998 | | PART |
Jim Storey
|
|
|
09/08/98 301 - MATT ###-#### SIZEMIC CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 9/4/1998 | 9/4/1998 | 9/4/1998 | | CANC |
Joe Tawney
|
|
|
09/04/98 406 - matt ###-#### sizemic CANCELLED STRUCTURAL INSP
|
INSP-Conference | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | PART |
Joe Tawney
|
|
|
08/06/98 406 - MATT ###-#### CONF ON SPKLR PROTECTION UNDER CONVEYERS OVER 4 FT WIDE
|
INSP - Framing/Rough-in | 8/4/1998 | 8/4/1998 | 8/4/1998 | A | PASS |
Jim Storey
|
|
|
08/04/98 301 - wall bracing c/n resolved ok for wall cover.
|
INSP - Framing/Rough-in | 7/29/1998 | 7/30/1998 | 7/30/1998 | A | NR |
Jim Storey
|
|
|
07/30/98 301 - matt ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Framing/Rough-in | 7/27/1998 | 7/28/1998 | 7/28/1998 | A | PART |
Jim Storey
|
|
|
07/28/98 301 - framing air cargo steel frame. matt ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pend plum and ele
|
INSP-Sprinkler Rough-in/Hydro | 6/11/1998 | 6/11/1998 | 6/11/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND HYDRO TEST
|
INSP-Supply line flush | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Joe Tawney
|
|
|
06/11/98 406 - ###-#### fire line flush said he already spoke to you abo OK ON UNDERGROUND FLUSH
|
INSP - Foundation | 6/3/1998 | 6/3/1998 | 6/3/1998 | P | PART |
Jim Storey
|
|
|
06/03/98 301 - Matt ###-#### Masonry Wall placed w/special insp pending
|
INSP - Framing/Rough-in | 6/1/1998 | 6/1/1998 | 6/1/1998 | P | PART |
Jim Storey
|
|
|
06/01/98 301 - masorny/ ###-#### first cource ok
|
INSP - Framing/Rough-in | 5/14/1998 | 5/15/1998 | 5/15/1998 | A | FAIL |
Jim Storey
|
|
|
05/15/98 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED work n/r arch.
|
INSP - Foundation | 3/29/1999 | 4/23/1998 | 4/23/1998 | | PART |
|
|
|
conference with plumber on gw opk
|
INSP - Foundation | 4/13/1998 | 4/14/1998 | 4/14/1998 | A | PART |
Jim Storey
|
|
|
04/14/98 301 - C/N REQUIR SPECIAL INSP.SCOPE OF WORK. RESUBMITTAL OF FO
|
INSP - Foundation | 4/8/1998 | 4/8/1998 | 4/8/1998 | P | PART |
Jim Storey
|
|
|
04/08/98 301 - matt ###-####
|