Permanent Occupancy | | 7/29/1998 | 7/29/1998 | | DONE |
|
|
|
|
INSP - Final | 6/26/1998 | 6/26/1998 | 6/26/1998 | P | NR |
Carl Dependahl
|
|
|
will place landing at door 3 per c/n; recall when ready. 338 area.
|
INSP - Final | 6/24/1998 | 6/25/1998 | 6/25/1998 | A | FAIL |
Carl Dependahl
|
|
|
06/25/98 340 - phil ###-#### c/n, need landing at rear door or approval door is from warehouse area w/ 1 other exit.
|
INSP - Final | 6/19/1998 | 6/22/1998 | 6/22/1998 | A | FAIL |
|
|
|
06/22/98 338 - not ready need code enforcement, public works drainage
|
INSP-Final Inspection | 6/18/1998 | 6/19/1998 | 6/19/1998 | A | PASS |
Joe Tawney
|
|
|
06/19/98 406 - Phil ###-#### REINSP OK FOR PERM OCC WHSE AND CERT OF COMPLETION FOR STORE
|
INSP - Final | 6/11/1998 | 6/11/1998 | 6/11/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL WORK NOT COMPLETED EXIT SIGNS SPKLR RISER CLEARAN
|
INSP-Final Inspection | 6/8/1998 | 6/10/1998 | 6/10/1998 | P | CANC |
Joe Tawney
|
|
|
06/10/98 406 - Phil ###-#### Will call and set up time CANCELLED RESCHED FOR 8:30 AM 6/11/98
|
INSP - Framing/Rough-in | 6/8/1998 | 6/9/1998 | 6/9/1998 | A | PART |
|
|
|
MADE OK TO COVER THE CEILING WILL INSPECT CORRECTIONS AT THE FINAL WALK THROUGH NEED SOME LIGHT FIXTURE WORK
|
INSP-Final Inspection | 6/1/1998 | 6/1/1998 | 6/1/1998 | P | FAIL |
Joe Tawney
|
|
|
06/01/98 406 - partial final temp occ/ warehouse/ ###-#### phil FINAL ON WHSE FAIL ALARM SYSTEM LIGHTS
|
INSP - Framing/Rough-in | 5/18/1998 | 5/19/1998 | 5/19/1998 | P | PART |
|
|
|
made ok to drywall and start the grid ceiling this section
|
INSP - Framing/Rough-in | 5/15/1998 | 5/18/1998 | 5/18/1998 | P | CANC |
|
|
|
05/19/98 338 - canc by the cntr 2:pm on the phone other agencies not app
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP-Sprinkler Rough-in/Hydro | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST
|
INSP - Framing/Rough-in | 3/20/1998 | 3/23/1998 | 3/23/1998 | A | PASS |
|
|
|
03/24/98 338 - made ok to insulate called phil
|
INSP-Sprinkler Rough-in/Hydro | 3/18/1998 | 3/18/1998 | 3/18/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON SPKLR ROUGH IN FOR NEW ADDITION
|
INSP - Framing/Rough-in | 3/6/1998 | 3/9/1998 | 3/9/1998 | A | PASS |
|
|
|
03/09/98 338 - SHEER NAILING PHIL ###-#### SHEAR NAILING MADE OK NEED TO A-35 TOP OF INT SHEAR WALL # 4
|
INSP - Footings | 1/27/1998 | 1/28/1998 | 1/29/1998 | A | PASS |
|
|
|
01/28/98 338 - ETHAN ALLEN--###-#### KEVIN made ok r-bar placed
|
INSP - Framing/Rough-in | 1/28/1998 | 1/28/1998 | 1/29/1998 | P | PASS |
|
|
|
01/28/98 338 - HIS IS FOR A WALL--KEVIN ###-#### made ok r-bar placed
|
INSP - Foundation | 1/28/1998 | 1/28/1998 | 1/28/1998 | | |
|
|
|
/ / 338 -
|
INSP - Foundation | 1/26/1998 | 1/26/1998 | 1/26/1998 | P | PART |
|
|
|
01/26/98 338 - kevin ###-#### reinspection made ok sp insp not required
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/26/1998 | P | PART |
|
|
|
01/26/98 338 - POURING AT 2:30--KEVIN--###-####--ENGINEER SAYS THEY DON' INSPECTION. made ok for the rear/north footing wall only to use concrete the road
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/26/1998 | P | PASS |
|
|
|
01/26/98 338 - PER YOUR REQUEST made ok to pour r-bar placed FTG -OK FOOTING
|
INSP - Footings | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PART |
|
|
|
01/23/98 333 - special insp required appears ok as far as they have gote
|
INSP - Footings | 1/23/1998 | 1/23/1998 | 1/23/1998 | | FAIL |
|
|
|
/ / 338 - r-bar not placed
|