Permanent Occupancy | | 3/20/1998 | 3/20/1998 | | DONE |
|
|
|
|
INSP - Final | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | PASS |
|
|
|
03/05/98 338 - 10:30 a.m. no access called operations manager derrick le
|
INSP - Final | 3/3/1998 | 3/3/1998 | 3/3/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR CERT OF COMPLETION
|
INSP - Framing/Rough-in | 2/26/1998 | 2/27/1998 | 2/27/1998 | P | NR |
|
|
|
02/27/98 338 - what kind of insp is requestednks he is ready for a final
|
INSP-Sprinkler Rough-in/Hydro | 2/26/1998 | 2/27/1998 | 2/27/1998 | A | FAIL |
Joe Tawney
|
|
|
02/27/98 406 - robert ###-#### FINAL CONSTRUCTION OK SPKLR SYSTEM NEEDS ANNUAL INSPECTION FAIL
|
INSP - Framing/Rough-in | 2/19/1998 | 2/19/1998 | 2/19/1998 | P | PASS |
|
|
|
02/19/98 338 - madeok need to brace / block ends of joists at the stair
|
INSP - Footings | 2/4/1998 | 2/4/1998 | 2/4/1998 | | PASS |
|
|
|
/ / 338 - made ok r-bar placed
|
INSP - Footings | 2/4/1998 | 2/4/1998 | 2/4/1998 | | PASS |
|
|
|
/ / 338 - made ok r-bar placed
|
INSP - Footings | 2/3/1998 | 2/4/1998 | 2/4/1998 | A | NR |
|
|
|
02/04/98 338 - ken ###-#### no access
|
INSP - Framing/Rough-in | 1/22/1998 | 1/23/1998 | 1/23/1998 | A | PASS |
|
|
|
01/23/98 338 - this is a conference on the comparison of the existing bu new remodel plan for the mezz extension need to cut slab to be sure of questions
|