INSP - Final | 5/8/1998 | 5/11/1998 | 5/11/1998 | A | PASS |
Joe Tawney
|
|
|
05/11/98 406 - PERM OCC SIGNED OFF 4/27/98
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | A | PART |
Carl Dependahl
|
|
|
conf; has signatures...will recall
|
INSP - Final | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | |
Wes Worcester
|
|
|
w/ Jeff at site, has card
|
Permanent Occupancy | | 5/11/1998 | 5/11/1998 | | DONE |
|
|
|
|
INSP - Final | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | FAIL |
Carl Dependahl
|
|
|
JEFF/###-#### 20201 - FINAL STRUCTURAL INSP. c/n firestop 1hr lid at penetrations, get other signatures (p&z, p. wks...) signed card for temp
|
INSP-Final Inspection | 4/27/1998 | 4/27/1998 | 4/27/1998 | P | PASS |
Joe Tawney
|
|
|
04/27/98 406 - ###-#### RADIO CODE 20201/JEFF - FIRE INSP. FINAL OK FOR PERM OCC
|
INSP - Final | 4/15/1998 | 4/15/1998 | 4/15/1998 | P | PASS |
Wes Worcester
|
|
|
04/15/98 342 - gerad ###-#### to insp roof only
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | A | FAIL |
Wes Worcester
|
|
|
04/05/98 342 - still has outstanding c/n -10:00 AS PER 342-MARK ###-####
|
INSP - Framing/Rough-in | 4/3/1998 | 4/6/1998 | 4/6/1998 | A | NR |
Carl Dependahl
|
|
|
ROOF-10:00 342 IS ALSO GOING OUT...no insp, conf w/ wes
|
INSP - Framing/Rough-in | 4/1/1998 | 4/2/1998 | 4/2/1998 | A | FAIL |
Wes Worcester
|
|
|
04/01/98 342 - ROOF GERALD ###-####
|
INSP - Framing/Rough-in | 3/18/1998 | 3/19/1998 | 3/19/1998 | A | PART |
Wes Worcester
|
|
|
03/19/98 342 - placing double 5 bar at door headers
|
INSP - Foundation | 3/16/1998 | 3/17/1998 | 3/17/1998 | A | PART |
Wes Worcester
|
|
|
03/17/98 342 - GROUTING BLOCK WALL--JERROD ###-####
|
INSP - Concrete | 3/12/1998 | 3/12/1998 | 3/12/1998 | A | NR |
Carl Dependahl
|
|
|
NEED PLBG OK BEFORE SLAB
|
INSP - Concrete | 3/6/1998 | 3/6/1998 | 3/6/1998 | A | PART |
Carl Dependahl
|
|
|
discussed insps w/ mason; found wall looks ok, will pour grout in approx 4' lifts.
|
INSP - Foundation | 3/4/1998 | 3/5/1998 | 3/5/1998 | P | PART |
Carl Dependahl
|
|
|
JERROD ###-####; allready grouted, bar looks ok. Told gen'l to have mason call me
|
INSP - Foundation | 3/4/1998 | 3/4/1998 | 3/4/1998 | A | PASS |
Carl Dependahl
|
|
|
BAR IN PLACE; TOLD CONT TO HAVE ALL MASONRY INSPS CALLED IN...NO SPEC. INSP. PER ARLAN S.
|
INSP - Foundation | 3/3/1998 | 3/4/1998 | 3/4/1998 | A | CANC |
Wes Worcester
|
|
|
03/03/98 342 - JERAD ###-#### ASAP given to Carl
|
INSP - Concrete | 3/3/1998 | 3/3/1998 | 3/3/1998 | A | NR |
Carl Dependahl
|
|
|
DISCUSSED INSP PROCESS, NEED REBAR IN; TOLD TO RECALL, WOULD TRY TO HAVE WES GO BY LATE AM.
|
INSP - Foundation | 3/3/1998 | 3/3/1998 | 3/3/1998 | | NR |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Foundation | 3/2/1998 | 3/3/1998 | 3/3/1998 | A | NR |
Wes Worcester
|
|
|
03/03/98 342 - ATHLETIC COMPLEX--BATHROOMS--FOOTING--11 am apt
|
INSP - Foundation | 2/26/1998 | 3/2/1998 | 3/2/1998 | P | NR |
Carl Dependahl
|
|
|
gerard ###-#### for a footing insp...NR, NEED BAR IN & DETERMINATION FOR SPEC INSP FOR STRUCT MASONRY.
|