Information based on query as of Saturday, July 6, 2024.
Permit Information
Permit NumberBLD97-03798
StatusFinaled
Name PAUL MOHR
Site Address 7031 S EISENMAN RD
Project NamePOWER BAR
Customer Number 
ePlanReviewNo
Description
* TO CONSTRUCT A 64,62 SQ. FT. SHELL ONLY ADDITION TO THE EXISTING WEST END OF THE PRESENT FACILITY. CONSTRUCTION SHALL BE METAL FRAME TYPE V-N, FULLY FIRE SPRINKLERED, UNLIMITED AREA. 60 FOOT OPEN YARDS SURROUNDING THE BUILDING SHALL BE MAINTAINED. ALL WORK IS PER APPROVED PLANS AND NO OCCUPANCY OF THE ADDITION IS ALLOWED UNDER THIS PERMIT. ALL WORK IS TO CONFORM WITH DR#97-0243 PC#826-97.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/14/19989/14/19989/14/1998 PASS
DetailsJim Storey
/ / 301 - FNL -OK FINAL
INSP-Final Inspection9/10/19989/10/19989/10/1998PPASS
DetailsRick Jackson
occ approved
INSP-Final Inspection6/15/19986/15/19986/15/1998APART
DetailsRick Jackson
tested tampers for sprinkler - okay. knox box installed and duct detectors shut downs - okay. fire lanes painted on 6/16.
INSP - Final6/9/19986/10/19986/10/1998APART
DetailsJim Storey
06/10/98 301 - final ok pending fire insp. isues...
INSP-Final Inspection6/9/19986/9/19986/9/1998PPART
DetailsRick Jackson
as per 409 2:30 TIME/TRACY ###-#### tampers retest, AHU shutdown, etc. c/n issued
INSP - Final5/21/19985/22/19985/26/1998PNR
DetailsRuss Owen
05/22/98 407 - not ready,need other inspections. plumbing,fire
INSP - Framing/Rough-in5/7/19985/7/19985/8/1998PPART
DetailsRuss Owen
05/07/98 407 - inside non-bearing walls ok. need stell joist lay out app
INSP-Sprinkler Rough-in/Hydro5/6/19985/6/19985/6/1998PPART
DetailsRick Jackson
esfr sprinkler heads obstructed by ductwork
INSP - Foundation3/24/19983/24/19983/25/1998PPART
DetailsRuss Owen
03/24/98 407 - this foundation is required to have special inspector app to reports.
INSP - Foundation3/20/19983/23/19983/24/1998APART
DetailsRuss Owen
03/23/98 407 - this job is under special inspection.Subject to the repor
INSP - Foundation3/23/19983/23/19983/23/1998PPART
Details
03/23/98 333 - pending si reports
INSP - Foundation3/19/19983/19/19983/20/1998PPART
DetailsRuss Owen
03/19/98 407 - this requires special inspection,pending reports.
INSP - Foundation3/18/19983/18/19983/18/1998PPART
DetailsRuss Owen
03/18/98 407 - this requires special inspection subject to report.