INSP - Final | 4/26/1999 | 4/27/1999 | 4/27/1999 | A | PASS |
Carl Dependahl
|
|
|
04/27/99 340 - SIGNED COPY, CARD TO OWNERBill ###-####
|
INSP - Final | 4/20/1999 | 4/21/1999 | 4/21/1999 | A | FAIL |
Carl Dependahl
|
|
|
04/21/99 340 - ###-#### BILL//FINAL; need p&z 1st.
|
INSP-Final Inspection | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | PASS |
Joe Tawney
|
|
|
11/02/98 406 - bob ###-#### final fire REINSP OK FOR PERM OCC
|
INSP - Final | 10/22/1998 | 10/22/1998 | 10/23/1998 | P | PART |
|
|
|
10/22/98 338 - signed the temp col of the occ req card told them to go d
|
INSP - Final | 10/21/1998 | 10/21/1998 | 10/22/1998 | P | NH |
|
|
|
10/21/98 338 - out of time will recall for 10/23/98
|
INSP-Final Inspection | 10/20/1998 | 10/21/1998 | 10/21/1998 | A | PART |
Joe Tawney
|
|
|
10/21/98 406 - ROGER ###-#### REINSP OK FOR TEMP OCC OF FREEZER ROOM SUPRV LABELING PIPES
|
INSP-Final Inspection | 9/21/1998 | 9/22/1998 | 9/22/1998 | A | FAIL |
Joe Tawney
|
|
|
09/22/98 406 - jennifer ###-#### FINAL FAIL WIRE VLV TAMPER SWITCH OBSTRUCTED SPKLR HEADS
|
INSP-Final Inspection | 9/11/1998 | 9/14/1998 | 9/13/1998 | A | NR |
|
|
|
09/14/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 8/28/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Joe Tawney
|
|
|
08/31/98 406 - SHELLY ###-#### OK ON SPKLR ROUGH IN AND HYDRO TEST
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | | PART |
|
|
|
08/05/98 338 - ok to cover
|
INSP - Framing/Rough-in | 8/13/1998 | 8/13/1998 | 8/13/1998 | | PART |
|
|
|
08/05/98 338 - ok to cover
|
INSP - Foundation | 7/21/1998 | 7/21/1998 | 7/23/1998 | P | PASS |
|
|
|
07/21/98 338 - made ok to pour all footings and walls are complete
|
INSP - Foundation | 6/30/1998 | 6/30/1998 | 6/30/1998 | P | PART |
|
|
|
06/30/98 338 - SLABS NOT INSPECTED BY ME
|
INSP - Framing/Rough-in | 6/8/1998 | 6/8/1998 | 6/8/1998 | P | PART |
|
|
|
06/08/98 338 - made ok to pour r-bar placed in the west and south walls
|
INSP - Framing/Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 | P | PART |
|
|
|
05/15/98 338 - MADE OK FOR THE FREEZER EAST TO WEST WALLS ONLY
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | PASS |
|
|
|
MADE OK R-BAR PLACED
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PASS |
|
|
|
04/30/98 338 - FRMS-OK FORMS-REBAR
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 4/30/1998 | | PASS |
|
|
|
04/30/98 338 - FRMS-OK FORMS-REBAR
|
INSP - Foundation | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
|
|
|
04/28/98 338 - north wall
|
INSP - Conference | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
/ / 338 - made k general ctr confirming conversation with Eng of earli
|
INSP - Conference | 4/21/1998 | 4/21/1998 | 4/21/1998 | | PART |
|
|
|
/ / 338 - with eng on design concrete 3000 is not reqired 10 min on ph
|
INSP - Foundation | 4/17/1998 | 4/20/1998 | 4/20/1998 | A | NR |
|
|
|
04/20/98 338 - NOT READY NEED SP INSP FOR DESIGN LOADS OF 3000 PSI PER C
|
INSP - Foundation | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | NR |
|
|
|
04/16/98 338 - 2nd time on jobsite without the approved plans on site c/
|
INSP - Foundation | 4/14/1998 | 4/15/1998 | 4/15/1998 | P | NR |
|
|
|
04/15/98 338 - need to have approved plans on jobsite for proper inspect
|