Permanent Occupancy | | 9/30/1998 | 9/30/1998 | | DONE |
|
|
|
|
INSP - Final | 9/29/1998 | 9/29/1998 | 9/29/1998 | P | PASS |
Jim Storey
|
|
|
09/29/98 301 - andy ###-#### FNL -OK FINAL pending ele sign. ì
|
INSP-Sprinkler Rough-in/Hydro | 9/25/1998 | 9/25/1998 | 9/25/1998 | P | PASS |
Rick Jackson
|
|
|
ANDY ###-#### occ approved for perm - not a sprinkler rough-in
|
INSP-Sprinkler Rough-in/Hydro | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | FAIL |
Rick Jackson
|
|
|
ANDY ###-#### this was a final insp. sliding gate lock problem; sprinkler heads obstructed in coffee shop and storage room; alarms tested okay
|
INSP - Framing/Rough-in | 7/22/1998 | 7/22/1998 | 7/22/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING fire stopping of occ. septration in walls through floor
|
INSP - Framing/Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | | PART |
Jim Storey
|
|
|
07/17/98 301 - ARAMARK COFFEE BAR/GIFT SHOP/ ANDY SURMELIS/ ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping required at all assembly to be done and submital to be on site at reinsp ok to rock all locations that will be concealed in wall c
|
INSP - Framing/Rough-in | 7/16/1998 | 7/17/1998 | 7/17/1998 | P | PART |
Jim Storey
|
|
|
07/17/98 301 - floor fire stopping at 5 locations must have submittals a other walls ok for cover.
|