INSP - Final | 10/19/1998 | 10/19/1998 | 10/19/1998 | P | PASS |
|
|
|
10/19/98 338 - signed perm col
|
Permanent Occupancy | | 10/19/1998 | 10/19/1998 | | DONE |
|
|
|
|
INSP - Final | 9/29/1998 | 10/1/1998 | 10/1/1998 | A | FAIL |
Tom Arcoraci
|
|
|
10/01/98 408 - Scheduled by Hello!. Contact phone is [9398850].
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL FIRE EXT STILL NOT TAGGED
|
INSP-Final Inspection | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | FAIL |
Joe Tawney
|
|
|
09/04/98 406 - ###-#### please call REINSP FAIL ALARM SYSTEM CALCS
|
INSP-Final Inspection | 8/14/1998 | 8/17/1998 | 8/17/1998 | A | FAIL |
Joe Tawney
|
|
|
08/16/98 406 - mark guho ###-#### fire and life safety FINAL FAIL ALARM SUBM FIRE EXT STROBES SPKLR SYST ANNUAL INSP
|
INSP - Final | 8/7/1998 | 8/7/1998 | 8/7/1998 | | FAIL |
|
|
|
08/07/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Final | 8/6/1998 | 8/7/1998 | 8/7/1998 | A | NR |
|
|
|
other agencies not approvedt phone is [9398850].
|
INSP-Sprinkler Rough-in/Hydro | 7/14/1998 | 7/15/1998 | 7/15/1998 | A | PART |
Joe Tawney
|
|
|
07/15/98 406 - ###-#### OK ON ROUGH IN EXC POSSIBLY SIDE WALL HEADS IN CORRIDOR CEILING NOT FINI
|
INSP - Framing/Rough-in | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
|
|
|
06/05/98 338 - Scheduled by Hello!. Contact phone is [9398850]. made ok to cover int walls and insulate the ceiling/roof area
|
INSP - Framing/Rough-in | 5/29/1998 | 6/1/1998 | 6/1/1998 | A | NR |
|
|
|
06/01/98 338 - outof time
|
INSP - Concrete | 5/13/1998 | 5/14/1998 | 5/14/1998 | P | PASS |
|
|
|
05/14/98 338 - made ok to pour with sp insp approval
|
INSP - Foundation | 5/5/1998 | 5/6/1998 | 5/6/1998 | P | PASS |
|
|
|
05/06/98 338 - made ok sp insp made ok to pour
|
INSP - Foundation | 5/1/1998 | 5/4/1998 | 5/4/1998 | P | NR |
|
|
|
need special insp letter before concrete hits the ground
|