INSP - Framing/Rough-in | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Russ Owen
|
|
|
12/17/98 407 - told them it would not require an inspection to pour this
|
INSP - Framing/Rough-in | 11/3/1998 | 11/3/1998 | 11/3/1998 | P | PART |
Russ Owen
|
|
|
refered architect to plan review as the side walls of the hocky bench area walls have fire retardant wood and a plastic board for finish this does not meet type II construction. One in each rink.
|
INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | PART |
Russ Owen
|
|
|
noted to contractor man door at zamboni room does not have correct rating.
|
INSP-Conference | 10/26/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Russ Owen
|
|
|
profit meeting.
|
INSP - Framing/Rough-in | 10/15/1998 | 10/15/1998 | 10/15/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - taled with contractor about fire assembly windows.
|
INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/12/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - ceiling in lockers.
|
INSP - Framing/Rough-in | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - walk thru contractor has not installed wall joint fire stopi notified to correct at cmu walls.
|
INSP - Framing/Rough-in | 9/29/1998 | 9/29/1998 | 9/29/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - walk thru with builder progress check.
|
INSP - Framing/Rough-in | 9/25/1998 | 9/25/1998 | 9/25/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Talked with contractor about fire stoping ceiling assemblies protection.
|
INSP - Framing/Rough-in | 9/23/1998 | 9/23/1998 | 9/23/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Talked with builder about the need for verification of fire wood.said he would verify.
|
INSP - Framing/Rough-in | 9/17/1998 | 9/17/1998 | 9/17/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - meet with architect about ceiling changed details for upper construction.
|
INSP - Framing/Rough-in | 9/10/1998 | 9/10/1998 | 9/10/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - talked with builder and architect about upper ceiling
|
INSP - Framing/Rough-in | 9/9/1998 | 9/9/1998 | 9/9/1998 | P | PART |
Russ Owen
|
|
|
09/09/98 407 - meet with architect about corrections ,fire assembly for
|
INSP - Framing/Rough-in | 9/2/1998 | 9/2/1998 | 9/2/1998 | A | FAIL |
Russ Owen
|
|
|
inspections of ceilings and fire walls partial inspections have corrections for the continuity of the 3 hr fire wall,also upper 1 hour lid,and they have not started the 3 required shafts,left correction notice on site.
|
INSP - Foundation | 5/19/1998 | 5/19/1998 | 5/19/1998 | P | PART |
Jim Storey
|
|
|
05/19/98 301 - PLACED W/SPECIAL INSP. PENDING REPORT.
|
INSP - Framing/Rough-in | 5/4/1998 | 5/4/1998 | 5/4/1998 | P | PART |
Russ Owen
|
|
|
need refirgeration lines inspected by the designer told yhis to contractor.NG AT 1:30.
|
INSP - Foundation | 4/30/1998 | 4/30/1998 | 5/1/1998 | P | PART |
Russ Owen
|
|
|
04/30/98 407 - unable to make inspection today.special inspector / phil
|
INSP - Foundation | 4/28/1998 | 4/29/1998 | 4/30/1998 | A | PART |
Russ Owen
|
|
|
04/29/98 407 - no one at the job site,went out late pm,unable to make it meetings.(###-####--footing special inspection on job
|
INSP - Foundation | 4/21/1998 | 4/21/1998 | 4/21/1998 | P | PART |
Russ Owen
|
|
|
04/21/98 407 - this wall has been poured but contractor said special ins
|
INSP - Foundation | 4/15/1998 | 4/16/1998 | 4/16/1998 | A | PART |
Russ Owen
|
|
|
04/16/98 407 - ok, site visit,also special inspector on site.
|