INSP - Final | 10/5/1998 | 10/6/1998 | 10/6/1998 | A | PASS |
Russ Owen
|
|
|
10/06/98 407 - re-insp.936 FOR FN OCC INSP
|
Permanent Occupancy | | 10/6/1998 | 10/6/1998 | | DONE |
|
|
|
|
INSP - Final | 9/21/1998 | 9/21/1998 | 9/22/1998 | P | PART |
Russ Owen
|
|
|
09/21/98 407 - left correction ok for temp. also have special inspection final report for concrete etc,all items ok,also sent this along with truss roof plans to our plan file department.
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | CANC |
Russ Owen
|
|
|
09/18/98 407 - taked with Mechanical inspector on phone no electrical or this time
|
INSP-Final Inspection | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved - awaiting assembly permit
|
INSP-Final Inspection | 9/16/1998 | 9/17/1998 | 9/17/1998 | P | NR |
Rick Jackson
|
|
|
ty ###-#### too many items to complete. reviewed fire plan check comments with general contractor
|
INSP - Framing/Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | FAIL |
Russ Owen
|
|
|
09/14/98 407 - left corrections. CEILING GRID
|
INSP - Framing/Rough-in | 9/3/1998 | 9/3/1998 | 9/3/1998 | P | PASS |
Jim Storey
|
|
|
09/03/98 301 - TY ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 8/28/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Russ Owen
|
|
|
08/31/98 407 - not yet complete. also stil need truss details stamped by
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | A | PART |
Russ Owen
|
|
|
08/28/98 407 - ok to cover interior walls with rock.
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | A | PART |
Russ Owen
|
|
|
/ / 407 - Looked at hold downs. re-inspection.
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | FAIL |
Russ Owen
|
|
|
/ / 407 - pat ###-#### okay to cover
|
INSP - Framing/Rough-in | 8/25/1998 | 8/25/1998 | 8/25/1998 | A | PART |
Russ Owen
|
|
|
ADDED BOLTS TO FRONT HOLD DOWNS,ALSO TOLD CONTRACTOR TO GET INFORMATION FOR THE SHAFTS FOR COOKING EQUIPMENT.
|
INSP - Framing/Rough-in | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | PASS |
Russ Owen
|
|
|
exterior shear nailing.
|
INSP - Framing/Rough-in | 8/17/1998 | 8/17/1998 | 8/17/1998 | P | PART |
Russ Owen
|
|
|
WALLS IN FREEZER ONLY ,NEED TO ADD ANCHOR BOLTS.
|
INSP - Foundation | 7/13/1998 | 7/14/1998 | 7/14/1998 | P | PART |
Russ Owen
|
|
|
07/14/98 407 - subject to the special inspectors approval.
|
INSP - Foundation | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | PART |
Russ Owen
|
|
|
07/13/98 407 - special inspector has been by and approved per contractor
|
INSP - Foundation | 7/9/1998 | 7/9/1998 | 7/10/1998 | P | PART |
Russ Owen
|
|
|
07/09/98 407 - subject to special inspector approval.jack-in-box- call j
|