INSP-Final Inspection | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for 2nd floor; c/n issued
|
INSP-Final Inspection | 12/3/1998 | 12/3/1998 | 12/3/1998 | A | PART |
Rick Jackson
|
|
|
walk through for final occupancy - work not completed
|
INSP-Final Inspection | 12/1/1998 | 12/1/1998 | 12/1/1998 | P | PART |
Rick Jackson
|
|
|
checked progress for final
|
INSP-Final Inspection | 11/30/1998 | 11/30/1998 | 11/30/1998 | P | PART |
Rick Jackson
|
|
|
checked progress for final with George S.
|
INSP-Final Inspection | 11/25/1998 | 11/25/1998 | 11/25/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for first floor only
|
INSP - Framing/Rough-in | 11/24/1998 | 11/24/1998 | 11/24/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - PARTIAL INSPECTION TO CHECK FOR ITEMS TO TO OBTAIN TEMP OC F
|
INSP-Final Inspection | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | FAIL |
Rick Jackson
|
|
|
alarms not complete; sprinklers okay
|
INSP - Conference | 11/23/1998 | 11/23/1998 | 11/23/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - OUT TO JOB SITE FOR PROGRESS CHECK.
|
INSP-Final Inspection | 11/20/1998 | 11/20/1998 | 11/20/1998 | P | PART |
Rick Jackson
|
|
|
temp occ approved for rink "a" only for the weekend
|
INSP-Sprinkler Rough-in/Hydro | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | FAIL |
Rick Jackson
|
|
|
small leak, will retest on 11/20
|
INSP - Conference | 11/19/1998 | 11/18/1998 | 11/19/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - MEET WITH THE APPROPRIATE PARTIES TO LOOK AT THE POSSIBILITY
|
INSP-Final Inspection | 11/18/1998 | 11/18/1998 | 11/18/1998 | P | FAIL |
Rick Jackson
|
|
|
rink "a" occ request met with project manager to discuss requirements for opening; all issues on c/n will be ready?
|
INSP - Final | 11/13/1998 | 11/16/1998 | 11/16/1998 | P | PART |
Russ Owen
|
|
|
MEET WITH PHIL TO SCHEDUAL TIME FOR TEMP OC AT RINK A.
|
INSP - Framing/Rough-in | 11/10/1998 | 11/10/1998 | 11/10/1998 | A | PART |
Russ Owen
|
|
|
meet with architect and other trades for profit meeting.
|
INSP-Conference | 11/10/1998 | 11/10/1998 | 11/10/1998 | A | PART |
Rick Jackson
|
|
|
smoke dampers in floors; alarm testing and sprinkler tests will be done on 11/20;
|
INSP-Conference | 11/4/1998 | 11/4/1998 | 11/4/1998 | | PART |
Mike Kinnear
|
|
|
Notice of 1 EQ brace in concession need stress load check. Higher temp heads in Zamboni and compressor rooms, etc. FDC shall be clear and straight access from obstruction. Shall have QR heads in "light hazard occupancies" no matter what the system is designed for!
|
INSP-Sprinkler Rough-in/Hydro | 10/27/1998 | 10/27/1998 | 10/27/1998 | A | PART |
Rick Jackson
|
|
|
reviewed FDC location and continued with rough-in
|
INSP-Conference | 10/26/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Rick Jackson
|
|
|
profit meeting for partial opening scheduled for 11/13 - gave requirements to contractor
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1998 | 10/21/1998 | 10/21/1998 | P | PART |
Rick Jackson
|
|
|
DOUG ###-#### upper floor has main and branch lines installed - no drops for heads in yet. peak heads are 26 inches from peak - okay. told doug a hydro test is still needed for all wet. window heads all installed
|
INSP-Sprinkler Rough-in/Hydro | 10/12/1998 | 10/12/1998 | 10/12/1998 | A | PART |
Rick Jackson
|
|
|
requested info from designer about heads on 2nd floor within 2 feet of peak - awaiting info.
|
INSP-Final Inspection | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
Rick Jackson
|
|
|
doug ###-#### not a final - hydro test of first floor locker/bathroom/zamboni areas - okay. heads not cut, rehydro after heads are cut (hard lid within the above areas)
|
INSP-Sprinkler Rough-in/Hydro | 10/5/1998 | 10/5/1998 | 10/5/1998 | A | PART |
Rick Jackson
|
|
|
early rough-in of shell, sway bracing not installed yet;
|
INSP-Sprinkler Rough-in/Hydro | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
Rick Jackson
|
|
|
phil ###-#### rink a & b dry system; antifreeze loop and hose stations okay for hydro. rest of wet and dry canopy not installed.
|
INSP-Conference | 9/17/1998 | 9/17/1998 | 9/17/1998 | A | PART |
Rick Jackson
|
|
|
discussed hydro testing dry system/antifreeze system in arenas. will test on 9/18
|
INSP-Supply line flush | 9/4/1998 | 9/4/1998 | 9/4/1998 | A | PASS |
Rick Jackson
|
|
|
underground flush and hydro okay
|
INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 | P | PART |
Russ Owen
|
|
|
went out reviewed plans for tenant t-i.
|
INSP - Framing/Rough-in | 8/7/1998 | 8/7/1998 | 8/7/1998 | A | PART |
Russ Owen
|
|
|
08/07/98 407 - partial inspection,only.
|
INSP - Framing/Rough-in | 8/7/1998 | 8/7/1998 | 8/7/1998 | | PART |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED fire stopping of floor assemb stud framing at gable weld detail west end expantion foint need fire sto detail not as per
|
INSP - Framing/Rough-in | 8/6/1998 | 8/6/1998 | 8/6/1998 | P | CANC |
Russ Owen
|
|
|
unable to do inspection this day.
|