Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-01122
StatusFinaled
Name THE BALCONY
Site Address 150 N 8TH (225, 226, 227) ST Unit: 2 FLR
Project NameCAPITAL TERRACE
Customer Number 
ePlanReviewNo
Description
(THE BALCONY) This building is required to be fire sprinkled. To expand an existing bar into an adjacent area. The floor area of the expanded tenant space, including the balcony and mezzanine, will be 7,116 square feet. Work is to include a 2-hr fire-resistive occupancy separation to function as a horizontal exit, 2 restrooms accessible to the disabled, interior nonbearing walls, modified suspended ceilings, floor finishes, counters, an interior mezzanine, structural modifications for the mezzanine, and interior stairs all per approved drawings, engineering, and plan review conditions on file. The maximum allowable occupant load of the interior space (309) and the balcony (71) shall be posted near the main exits from these areas. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-250-98 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/5/19993/5/1999 DONE
Details
INSP - Final3/3/19993/3/19993/3/1999 PASS
Details
/ / 338 - MADE OK SIGNED OCC REQ CARD PERM COL OTHER AGENCIES APPROVED
INSP-Final Inspection3/2/19993/2/19993/2/1999PPASS
DetailsRick Jackson
03/02/99 409 - occ approved
INSP - Foundation1/7/19991/7/19991/8/1999PPASS
Details
01/08/99 333 - ok
INSP - Foundation11/12/199811/13/199811/13/1998APASS
Details
11/13/98 333 - FDN -OK FOUNDATION
INSP - Final10/29/199810/30/199810/30/1998APASS
Details
10/30/98 333 - temp ok CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Final10/29/199810/30/199810/30/1998APASS
Details
10/30/98 333 - temp ok CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection10/29/199810/30/199810/30/1998APART
DetailsRick Jackson
temp occ approved for balcony club; monitor control valves for anti-freeze loop (locked now); baffles between heads; repair leak onto balcony; calcs for new system
INSP-Sprinkler Rough-in/Hydro10/28/199810/29/199810/29/1998ANR
DetailsRick Jackson
MIKE ###-#### FIRE INSP window sprinkler system not complete
INSP-Alarm Testing10/28/199810/28/199810/28/1998PPART
DetailsRick Jackson
balcony alarms okay. annual test, alarm plans, retest entire system, batteries replaced for the entire building
INSP - Final10/23/199810/26/199810/26/1998PFAIL
Details
10/26/98 333 - pre final
INSP-Final Inspection10/23/199810/26/199810/26/1998PFAIL
DetailsRick Jackson
larry ###-#### retest voice evac; complete 2 hour wall; sprinklers for glazing
INSP-Final Inspection10/23/199810/23/199810/23/1998PFAIL
DetailsRick Jackson
requested by simplex to test alarms etc audible voice evac in other areas weak; simplex to increase volume
INSP - Framing/Rough-in10/16/199810/16/199810/16/1998 PART
Details
10/16/98 333 - demising wall ok
INSP-Sprinkler Rough-in/Hydro10/16/199810/16/199810/16/1998AFAIL
DetailsRick Jackson
head obstructed by beam in southeast corner of bar
INSP-Sprinkler Rough-in/Hydro10/6/199810/6/199810/6/1998AFAIL
DetailsRick Jackson
lower than 22 inches from deck in dance floor area; overspaced in mezzanine area; 2 painted heads; discussed requirements for temp bar at east side of space
INSP-Conference10/2/199810/2/199810/2/1998PPART
DetailsRick Jackson
TVFP requested details for the balcony sprinkler requirements
INSP - Framing/Rough-in9/30/19989/30/19989/30/1998PPASS
Details
09/30/98 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in8/20/19988/21/19988/24/1998PPART
Details
08/21/98 333 - bath and sofit walls ok
INSP - Framing/Rough-in8/5/19988/7/19988/7/1998PPART
Details
08/07/98 333 - floor pour ok
INSP - Final3/3/19993/3/1999