Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD98-01154
StatusFinaled
Name WENDEL BILHAM
Site Address 6001 CASSIA ST
Project NameBORAH HS AUDITORIUM
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A TWO-STORY TYPE IIFR HIGH SCHOOL AUDITORIUM WITH TWO CLASSROOMS AND STORE ROOMS. OTHER WORK INCLUDES ALL SITE IMPROVEMENTS AND LANDSCAPING PER * CUP97-110 PC#259-98 MLO 1348 SQ. FT. 2ND FLOOR WITH 20238 SQ.FT. 1ST FLOOR.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/23/19999/23/19999/23/1999PPASS
DetailsCarl Dependahl
Borah High Auditorium Ok for C/O
FIRE-Final Inspection9/21/19999/22/19999/22/1999APASS
DetailsJoe Tawney
dwayne ###-#### ok for permanent occ.
Permanent Occupancy 9/22/19999/22/1999 DONE
Details
INSP-Final Inspection9/3/19999/7/19999/7/1999APART
DetailsJoe Tawney
9/7 OK on installation of sprinklr heads above stage. jrb REQUEST 9AM. TRACY ###-####
INSP - Final9/1/19999/2/19999/2/1999PPART
DetailsCarl Dependahl
09/02/99 340 - DWAYNE ###-####; ok for t/o, need fire ok
INSP-Final Inspection9/1/19999/2/19999/2/1999APART
DetailsJoe Tawney
09/01/99 406 - REINSP OK FOR TEMP OCC FAX OF ALARM SIGNALS
INSP-Conference8/19/19998/19/19998/19/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/DWAYNE ON FIRE DOORS
INSP - Final8/17/19998/18/19998/18/1999AFAIL
DetailsCarl Dependahl
08/18/99 340 - dwayne ###-#### part fn, c/ handrails, etc
INSP-Final Inspection8/17/19998/18/19998/18/1999PFAIL
DetailsJoe Tawney
08/18/99 406 - REINSP FAIL SPKLR ALARM TEST OK, ALARM SYST NOT COMPLETE
INSP - Final8/16/19998/17/19998/17/1999PNR
DetailsCarl Dependahl
08/17/99 340 - DWAYNE-- ###-#### CELL- PARTIAL FN-
INSP-Final Inspection8/17/19998/17/19998/17/1999
DetailsJoe Tawney
INSP-Conference8/16/19998/16/19998/16/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/GEORGE EIDEM REG ALARM C/N
INSP-Final Inspection8/12/19998/12/19998/12/1999PFAIL
DetailsJoe Tawney
08/12/99 406 - ALARM TEST FAIL C/N ISSUED
INSP - Framing/ Rough-in8/10/19998/10/19998/10/1999 PART
DetailsCarl Dependahl
/ / 340 - REC'D SPEC INSP & ENG'S LETTER: OK
INSP-Final Inspection7/15/19997/16/19997/16/1999APART
DetailsJoe Tawney
07/16/99 406 - OK ON TEST OF FIRE CURTAIN FOR STAGE
INSP-Conference7/15/19997/15/19997/15/1999 PART
DetailsJoe Tawney
/ / 406 - CONF REG TESTING OF FIRE DOOR
INSP - Framing/ Rough-in6/30/19996/30/19996/30/1999 PART
DetailsCarl Dependahl
/ / 340 - STAGE VENTS BACK ORDERED, CHK AT FINAL
INSP - Framing/Rough-in6/24/19996/25/19996/25/1999APART
DetailsCarl Dependahl
06/25/99 340 - rated ceiling Dwayne ###-####
INSP - Framing/Rough-in6/22/19996/23/19996/23/1999AFAIL
DetailsCarl Dependahl
06/23/99 340 - partial Dwayne ###-####; COMPLETE FIRESTOPS AT RATED LID/
INSP - Framing/ Rough-in6/16/19996/16/19996/16/1999 PART
DetailsCarl Dependahl
/ / 340 - REVIEWED FIRE PROOFING REPORT...NEED CLARIFICATION
INSP - Framing/ Rough-in6/15/19996/15/19996/15/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF. ONLYW/ BLDR. NEED FIRESTOPS AT LOBBY HARD LID
INSP - Framing/Rough-in6/8/19996/9/19996/10/1999AFAIL
DetailsCarl Dependahl
06/09/99 340 - Dwayne ###-####...CLG AT LOBBY; C/N, FIRESTOP, ADD SEISMI
INSP - Framing/Rough-in4/29/19994/29/19994/29/1999PPART
DetailsCarl Dependahl
04/29/99 340 - partial framing/ Dwayne ###-####, front of mezz ok to cov
INSP - Framing/Rough-in4/28/19994/29/19994/28/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF; REVIEWED PART SPEC INSP REPORTS FOR STEEL
INSP - Framing/Rough-in4/26/19994/26/19994/27/1999PPART
DetailsCarl Dependahl
04/26/99 340 - Partial\\###-#### Duwane; LOBBY LID, SOUND PANELS, OK TO
INSP - Framing/Rough-in4/23/19994/23/19994/23/1999 PART
DetailsCarl Dependahl
/ / 340 - SOUND PANELS, ADD CHANNEL AT ENDS, OK TO COVER
INSP - Framing/Rough-in4/22/19994/22/19994/22/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF RE FIRESTOPS AT RATED LIDS
INSP - Framing/Rough-in4/20/19994/21/19994/21/1999PPART
DetailsCarl Dependahl
04/21/99 340 - ###-#### DUANE//PARTIAL FRAMING; ok to rock bathroom lids
INSP - Framing/Rough-in4/16/19994/16/19994/16/1999PPART
DetailsCarl Dependahl
04/16/99 340 - DWAYNE ###-####; acoustic panels(drywall) at auditorium l
INSP - Framing/Rough-in4/13/19994/14/19994/14/1999AFAIL
DetailsCarl Dependahl
04/14/99 340 - ###-#### DWAYNE//PARTIAL FIRE CEILING; vents at restrooms
INSP - Wall cover4/13/19994/13/19994/13/1999 NR
DetailsCarl Dependahl
/ / 340 - CONF ONLY, REVIEWED SPEC INSP REPORTS...FAILED FIREPROOFING
INSP-Final Inspection4/13/19994/13/19994/13/1999PPART
DetailsJoe Tawney
04/13/99 406 - ok above grnd hydro test & rough in exc 3 items
INSP - Framing/Rough-in3/29/19993/29/19993/29/1999 FAIL
DetailsCarl Dependahl
/ / 340 - CONF ONLY, KEEP CN, NEED DETAIL FOR LID PENETRATIONS
INSP - Framing/Rough-in3/18/19993/19/19993/19/1999AFAIL
DetailsCarl Dependahl
03/19/99 340 - partial framing dwayne ###-#### need cert' for pre fab steel framing...archs detail for ceiling penetrat
INSP - Framing/Rough-in3/10/19993/10/19993/10/1999PFAIL
DetailsCarl Dependahl
03/10/99 340 - DWAYNE 321-*4974 need clarification of clg penetrations; ok to rock 1st layer at auditori
INSP-Final Inspection3/8/19993/9/19993/9/1999APART
DetailsJoe Tawney
03/09/99 406 - OK ON UNDERGROUND HYDRO TEST
INSP-Supply line flush3/9/19993/9/19993/9/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON SUPPLY LINE FLUSH
INSP - Framing/Rough-in3/4/19993/4/19993/4/1999 NR
DetailsCarl Dependahl
03/03/99 340 - rated A occ, need to seal all penetrations, submit spec i
INSP - Framing/Rough-in3/2/19993/3/19993/3/1999PFAIL
DetailsCarl Dependahl
partial ###-#### Duane...rated bldg, seal penetrations, need city plans
INSP - Framing/Rough-in1/11/19991/12/19991/12/1999APART
Details
01/12/99 338 - made ok to cover ext wall at the restrooms in rear of the
INSP - Framing/Rough-in12/29/199812/29/199812/29/1998PPASS
Details
12/29/98 338 - ok to close up music room ceilings
INSP-Conference12/21/1998 12/21/1998 PART
Follow up on a fax from Materials Testingand Inspection of non complying welds at the ends of trusses. AWS D1.1-98 requires that at extreme cold tempuratures (-4 degrees F to +5 degrees F ) pre heating of welds is required. As the welding forman refused to follow the proceedures of same all welds inspected today are unacceptable.. Per Mike Riccardelli "special inspector" I called the general contractor Scott Hedrick to tell him that work will be stopped if this matter is not resolved by tomorrow a.m. He contacted the special inspection agencie and we had a conference call..resulting in the agreement the any welding done today on these trusses must be ground out if they are in the way of the required welding of these members.Any welding other than these tack welds will be done in temperatures acceptable to the AWS D1.1-98..MR HEDRICK IS TO SEND LETTER TO WELDING CONTRACTOR TO THIS AFFECT..Copies are to be cc'd to myself and D. Cramm with Materials Testing and Inspection. I have also left message on the voice mail of Wendall Bigham with the Independent School District of Boise on this matter I am awaiting his returned call. It is now 5:45 p.m.
INSP - Framing/Rough-in12/15/199812/15/199812/16/1998PPART
Details
DWAYNE ###-#### made ok with sp insp approval
INSP - Foundation11/6/199811/9/199811/9/1998PPART
Details
11/09/98 338 - made ok with sp insp approval
INSP - Concrete10/14/199810/15/199810/15/1998APART
Details
10/15/98 338 - made ok to pour with sp insp approval
INSP - Foundation10/12/199810/12/199810/12/1998 PART
Details
/ / 338 - MADE OK WITH SP INSP APPROVAL
INSP - Framing/Rough-in10/9/199810/12/199810/12/1998APART
Details
10/12/98 338 - made k with sp insp approval
INSP - Foundation10/6/199810/6/199810/6/1998PPART
DetailsTom Arcoraci
10/06/98 408 - duane ###-#### rebar and footing part spec on site
INSP - Foundation10/1/199810/1/199810/1/1998PPART
DetailsTom Arcoraci
10/01/98 408 - footing and rebar dwayne ###-#### special insp on site
INSP - Framing/Rough-in9/28/19989/29/19989/29/1998APART
Details
09/29/98 338 - DWAYNE ###-#### STEM WALL AND REBAR MADE OKWITH SP ISP APPROVAL
INSP - Framing/Rough-in9/22/19989/23/19989/23/1998PPART
Details
09/23/98 338 - made ok with sp insp approval
INSP - Foundation9/21/19989/22/19989/22/1998APART
Details
09/22/98 338 - made ok with sp insp approval
INSP - Foundation9/15/19989/16/19989/16/1998APART
Details
09/17/98 338 - made ok to pour with the sp insp approval
INSP - Foundation9/14/19989/15/19989/14/1998APART
Details
09/15/98 338 - made ok with sp insp approval
INSP - Concrete9/9/19989/10/19989/10/1998APART
Details
09/10/98 338 - made ok with sp insp approval
INSP - Foundation9/8/19989/8/19989/8/1998PPART
Details
09/08/98 338 - MADE OK WITH SP INSP APPROVAL
INSP - Foundation9/2/19989/3/19989/3/1998APART
Details
09/03/98 338 - made ok with sp insp approval
INSP - Foundation9/2/19989/2/19989/2/1998PPART
Details
09/02/98 338 - rebar footing/ ###-#### made ok for the south footing wal