BLD-Final | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PASS |
Carl Dependahl
|
|
|
Borah High Auditorium Ok for C/O
|
FIRE-Final Inspection | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PASS |
Joe Tawney
|
|
|
dwayne ###-#### ok for permanent occ.
|
Permanent Occupancy | | 9/22/1999 | 9/22/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/3/1999 | 9/7/1999 | 9/7/1999 | A | PART |
Joe Tawney
|
|
|
9/7 OK on installation of sprinklr heads above stage. jrb REQUEST 9AM. TRACY ###-####
|
INSP - Final | 9/1/1999 | 9/2/1999 | 9/2/1999 | P | PART |
Carl Dependahl
|
|
|
09/02/99 340 - DWAYNE ###-####; ok for t/o, need fire ok
|
INSP-Final Inspection | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PART |
Joe Tawney
|
|
|
09/01/99 406 - REINSP OK FOR TEMP OCC FAX OF ALARM SIGNALS
|
INSP-Conference | 8/19/1999 | 8/19/1999 | 8/19/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF W/DWAYNE ON FIRE DOORS
|
INSP - Final | 8/17/1999 | 8/18/1999 | 8/18/1999 | A | FAIL |
Carl Dependahl
|
|
|
08/18/99 340 - dwayne ###-#### part fn, c/ handrails, etc
|
INSP-Final Inspection | 8/17/1999 | 8/18/1999 | 8/18/1999 | P | FAIL |
Joe Tawney
|
|
|
08/18/99 406 - REINSP FAIL SPKLR ALARM TEST OK, ALARM SYST NOT COMPLETE
|
INSP - Final | 8/16/1999 | 8/17/1999 | 8/17/1999 | P | NR |
Carl Dependahl
|
|
|
08/17/99 340 - DWAYNE-- ###-#### CELL- PARTIAL FN-
|
INSP-Final Inspection | 8/17/1999 | 8/17/1999 | 8/17/1999 | | |
Joe Tawney
|
|
|
|
INSP-Conference | 8/16/1999 | 8/16/1999 | 8/16/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF W/GEORGE EIDEM REG ALARM C/N
|
INSP-Final Inspection | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | FAIL |
Joe Tawney
|
|
|
08/12/99 406 - ALARM TEST FAIL C/N ISSUED
|
INSP - Framing/ Rough-in | 8/10/1999 | 8/10/1999 | 8/10/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - REC'D SPEC INSP & ENG'S LETTER: OK
|
INSP-Final Inspection | 7/15/1999 | 7/16/1999 | 7/16/1999 | A | PART |
Joe Tawney
|
|
|
07/16/99 406 - OK ON TEST OF FIRE CURTAIN FOR STAGE
|
INSP-Conference | 7/15/1999 | 7/15/1999 | 7/15/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF REG TESTING OF FIRE DOOR
|
INSP - Framing/ Rough-in | 6/30/1999 | 6/30/1999 | 6/30/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - STAGE VENTS BACK ORDERED, CHK AT FINAL
|
INSP - Framing/Rough-in | 6/24/1999 | 6/25/1999 | 6/25/1999 | A | PART |
Carl Dependahl
|
|
|
06/25/99 340 - rated ceiling Dwayne ###-####
|
INSP - Framing/Rough-in | 6/22/1999 | 6/23/1999 | 6/23/1999 | A | FAIL |
Carl Dependahl
|
|
|
06/23/99 340 - partial Dwayne ###-####; COMPLETE FIRESTOPS AT RATED LID/
|
INSP - Framing/ Rough-in | 6/16/1999 | 6/16/1999 | 6/16/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - REVIEWED FIRE PROOFING REPORT...NEED CLARIFICATION
|
INSP - Framing/ Rough-in | 6/15/1999 | 6/15/1999 | 6/15/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF. ONLYW/ BLDR. NEED FIRESTOPS AT LOBBY HARD LID
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/10/1999 | A | FAIL |
Carl Dependahl
|
|
|
06/09/99 340 - Dwayne ###-####...CLG AT LOBBY; C/N, FIRESTOP, ADD SEISMI
|
INSP - Framing/Rough-in | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | PART |
Carl Dependahl
|
|
|
04/29/99 340 - partial framing/ Dwayne ###-####, front of mezz ok to cov
|
INSP - Framing/Rough-in | 4/28/1999 | 4/29/1999 | 4/28/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF; REVIEWED PART SPEC INSP REPORTS FOR STEEL
|
INSP - Framing/Rough-in | 4/26/1999 | 4/26/1999 | 4/27/1999 | P | PART |
Carl Dependahl
|
|
|
04/26/99 340 - Partial\\###-#### Duwane; LOBBY LID, SOUND PANELS, OK TO
|
INSP - Framing/Rough-in | 4/23/1999 | 4/23/1999 | 4/23/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SOUND PANELS, ADD CHANNEL AT ENDS, OK TO COVER
|
INSP - Framing/Rough-in | 4/22/1999 | 4/22/1999 | 4/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF RE FIRESTOPS AT RATED LIDS
|
INSP - Framing/Rough-in | 4/20/1999 | 4/21/1999 | 4/21/1999 | P | PART |
Carl Dependahl
|
|
|
04/21/99 340 - ###-#### DUANE//PARTIAL FRAMING; ok to rock bathroom lids
|
INSP - Framing/Rough-in | 4/16/1999 | 4/16/1999 | 4/16/1999 | P | PART |
Carl Dependahl
|
|
|
04/16/99 340 - DWAYNE ###-####; acoustic panels(drywall) at auditorium l
|
INSP - Framing/Rough-in | 4/13/1999 | 4/14/1999 | 4/14/1999 | A | FAIL |
Carl Dependahl
|
|
|
04/14/99 340 - ###-#### DWAYNE//PARTIAL FIRE CEILING; vents at restrooms
|
INSP - Wall cover | 4/13/1999 | 4/13/1999 | 4/13/1999 | | NR |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY, REVIEWED SPEC INSP REPORTS...FAILED FIREPROOFING
|
INSP-Final Inspection | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PART |
Joe Tawney
|
|
|
04/13/99 406 - ok above grnd hydro test & rough in exc 3 items
|
INSP - Framing/Rough-in | 3/29/1999 | 3/29/1999 | 3/29/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY, KEEP CN, NEED DETAIL FOR LID PENETRATIONS
|
INSP - Framing/Rough-in | 3/18/1999 | 3/19/1999 | 3/19/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/19/99 340 - partial framing dwayne ###-#### need cert' for pre fab steel framing...archs detail for ceiling penetrat
|
INSP - Framing/Rough-in | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/10/99 340 - DWAYNE 321-*4974 need clarification of clg penetrations; ok to rock 1st layer at auditori
|
INSP-Final Inspection | 3/8/1999 | 3/9/1999 | 3/9/1999 | A | PART |
Joe Tawney
|
|
|
03/09/99 406 - OK ON UNDERGROUND HYDRO TEST
|
INSP-Supply line flush | 3/9/1999 | 3/9/1999 | 3/9/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 3/4/1999 | 3/4/1999 | 3/4/1999 | | NR |
Carl Dependahl
|
|
|
03/03/99 340 - rated A occ, need to seal all penetrations, submit spec i
|
INSP - Framing/Rough-in | 3/2/1999 | 3/3/1999 | 3/3/1999 | P | FAIL |
Carl Dependahl
|
|
|
partial ###-#### Duane...rated bldg, seal penetrations, need city plans
|
INSP - Framing/Rough-in | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | PART |
|
|
|
01/12/99 338 - made ok to cover ext wall at the restrooms in rear of the
|
INSP - Framing/Rough-in | 12/29/1998 | 12/29/1998 | 12/29/1998 | P | PASS |
|
|
|
12/29/98 338 - ok to close up music room ceilings
|
INSP-Conference | 12/21/1998 | | 12/21/1998 | | PART |
|
|
|
Follow up on a fax from Materials Testingand Inspection of non complying welds at the ends of trusses. AWS D1.1-98 requires that at extreme cold tempuratures (-4 degrees F to +5 degrees F ) pre heating of welds is required. As the welding forman refused to follow the proceedures of same all welds inspected today are unacceptable.. Per Mike Riccardelli "special inspector" I called the general contractor Scott Hedrick to tell him that work will be stopped if this matter is not resolved by tomorrow a.m. He contacted the special inspection agencie and we had a conference call..resulting in the agreement the any welding done today on these trusses must be ground out if they are in the way of the required welding of these members.Any welding other than these tack welds will be done in temperatures acceptable to the AWS D1.1-98..MR HEDRICK IS TO SEND LETTER TO WELDING CONTRACTOR TO THIS AFFECT..Copies are to be cc'd to myself and D. Cramm with Materials Testing and Inspection. I have also left message on the voice mail of Wendall Bigham with the Independent School District of Boise on this matter I am awaiting his returned call. It is now 5:45 p.m.
|
INSP - Framing/Rough-in | 12/15/1998 | 12/15/1998 | 12/16/1998 | P | PART |
|
|
|
DWAYNE ###-#### made ok with sp insp approval
|
INSP - Foundation | 11/6/1998 | 11/9/1998 | 11/9/1998 | P | PART |
|
|
|
11/09/98 338 - made ok with sp insp approval
|
INSP - Concrete | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
|
|
|
10/15/98 338 - made ok to pour with sp insp approval
|
INSP - Foundation | 10/12/1998 | 10/12/1998 | 10/12/1998 | | PART |
|
|
|
/ / 338 - MADE OK WITH SP INSP APPROVAL
|
INSP - Framing/Rough-in | 10/9/1998 | 10/12/1998 | 10/12/1998 | A | PART |
|
|
|
10/12/98 338 - made k with sp insp approval
|
INSP - Foundation | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
Tom Arcoraci
|
|
|
10/06/98 408 - duane ###-#### rebar and footing part spec on site
|
INSP - Foundation | 10/1/1998 | 10/1/1998 | 10/1/1998 | P | PART |
Tom Arcoraci
|
|
|
10/01/98 408 - footing and rebar dwayne ###-#### special insp on site
|
INSP - Framing/Rough-in | 9/28/1998 | 9/29/1998 | 9/29/1998 | A | PART |
|
|
|
09/29/98 338 - DWAYNE ###-#### STEM WALL AND REBAR MADE OKWITH SP ISP APPROVAL
|
INSP - Framing/Rough-in | 9/22/1998 | 9/23/1998 | 9/23/1998 | P | PART |
|
|
|
09/23/98 338 - made ok with sp insp approval
|
INSP - Foundation | 9/21/1998 | 9/22/1998 | 9/22/1998 | A | PART |
|
|
|
09/22/98 338 - made ok with sp insp approval
|
INSP - Foundation | 9/15/1998 | 9/16/1998 | 9/16/1998 | A | PART |
|
|
|
09/17/98 338 - made ok to pour with the sp insp approval
|
INSP - Foundation | 9/14/1998 | 9/15/1998 | 9/14/1998 | A | PART |
|
|
|
09/15/98 338 - made ok with sp insp approval
|
INSP - Concrete | 9/9/1998 | 9/10/1998 | 9/10/1998 | A | PART |
|
|
|
09/10/98 338 - made ok with sp insp approval
|
INSP - Foundation | 9/8/1998 | 9/8/1998 | 9/8/1998 | P | PART |
|
|
|
09/08/98 338 - MADE OK WITH SP INSP APPROVAL
|
INSP - Foundation | 9/2/1998 | 9/3/1998 | 9/3/1998 | A | PART |
|
|
|
09/03/98 338 - made ok with sp insp approval
|
INSP - Foundation | 9/2/1998 | 9/2/1998 | 9/2/1998 | P | PART |
|
|
|
09/02/98 338 - rebar footing/ ###-#### made ok for the south footing wal
|