IDAHO ELKS REHABILATION HOSPITAL (SHELL & CORE) * TO BUILD A NEW 149,210 SQ. FT., FOUR STORY, HOSPITAL AND ADMINISTRATION SHELL AND CORE BUILDING. THIS BUILDING WILL BE CONSTRUCTED OF STRUCTURAL STEEL FRAME, CONCRETE SLAB FLOORS, METAL STUD WITH GYPSUM BOARD EXTERIOR WALLS AND METAL ROOF DECK AND CLASS "A" ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH97-0195/CUP97-0195/PC#310-98/JCM (NOTE: THIS PERMIT ALSO INCLUDES THE SITE GRADING & DRAINAGE DESCRIBED UNDER BLD98-2512.)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/19/20016/19/20016/19/2001PPASS
DetailsCarl Dependahl
Final - reinspect; shell ok for l/c 6/19/2001 2:28:49 PM
BLD-Final6/7/20016/8/20016/8/2001ANR
DetailsCarl Dependahl
Final reinspect; Called Tim...bring in all cards. 6/8/2001 2:24:23 PM
BLD-Conference6/6/20016/6/20016/6/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/6/2001 11:10:49 AM rec'd eng's & spec insp's letters
BLD-Final5/25/20015/25/20015/25/2001AFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/25/2001 11:00:33 AM c/n, need eng's / spec. insp's affidavits...
BLD-Conference4/3/20014/3/20014/3/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/3/2001 2:28:27 PM rec'd curtain wall/floor firestop assy from Steve Turney, arch...ok
BLD-Conference3/15/20013/15/20013/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/15/2001 9:33:38 AM w/ bldr re set up conf for 3-16...spoke w/ arch & GS...keep c/n
BLD-Conference3/14/20013/14/20013/14/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/14/2001 9:11:33 AM keep c/n, need detail
BLD-Conference1/24/20011/24/20011/24/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/24/2001 4:31:26 PM w Dan S re c/n of 1-23...2hr fl/ curtain wall ssy req'd
BLD-Framing/Rough-in1/22/20011/23/20011/23/2001AFAIL
DetailsCarl Dependahl
FR MIKE ###-#### , ok to cover north/west canopy lid. c/n issued re firesafing at fl./ ext wall assy same side...archs detail req'd 1/23/2001 12:06:21 PM
BLD-Framing/Rough-in12/11/200012/12/200012/12/2000APART
DetailsCarl Dependahl
ext canopy ateast side, ok pending spec insp reports for spray on fp 12/12/2000 11:28:40 AM
BLD-Framing/Rough-in12/11/200012/11/200012/11/2000PCANC
DetailsJim Storey
Mike Mason ###-#### set up for carl am 12/12/2k 12/11/2000 4:11:57 PM
BLD-Conference10/3/200010/4/200010/4/2000APART
DetailsJim Storey
Wants Jim Story to take the inspection per George Slane Mike Mason ###-#### pending resubmital from arch. to address 2 hr. assembly. 10/4/2000 1:37:25 PM
BLD-Conference9/29/200010/2/200010/2/2000ACANC
DetailsRuss Owen
CONF-- MIKE ###-#### I called this number several times and could not make contact 407. 10/2/2000 12:35:42 PM
BLD-Footing8/1/20008/2/20008/2/2000ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 08/01/2000 at 14:22:07. Contact: .
will call back in special inspector will be on job per foreman 8/2/2000 4:01:02 PM
FIRE-Conference3/13/20003/13/20003/13/2000APART
DetailsRick Jackson
gave general the requirements for the stair signage UBC Standard 10-2
INSP - Framing/Rough-in5/7/19995/7/19995/10/1999PPART
Details
05/07/99 338 - ok to cover with ele div blessing
INSP - Framing/Rough-in4/19/19994/20/19994/21/1999PPART
Details
04/20/99 338 - c/n need stand pipe in progress asap resolve issue with p
INSP - Framing/Rough-in4/16/19994/19/19994/19/1999PPART
Details
04/19/99 338 - madeok for the detail on the paraput ok to spray fire pro
INSP-Conference4/7/19994/7/19994/7/1999PPART
DetailsRick Jackson
profit meeting
INSP - Framing/Rough-in3/29/19993/30/19993/30/1999A
Details
###-#### idaho elks rehab
INSP - Framing/Rough-in12/16/199812/17/199812/17/1998PPART
DetailsWes Worcester
12/17/98 342 - MIKE- CELL ###-#### CALL 1ST-CONF INSP
INSP - Foundation11/17/199811/18/199811/18/1998APART
DetailsWes Worcester
11/18/98 342 - MIKE...###-#### cleaning out elevator shaft for cover ea
INSP - Foundation11/6/199811/6/199811/6/1998 PART
DetailsWes Worcester
/ / 342 - special inspector on site
INSP - Foundation11/5/199811/6/199811/6/1998APART
DetailsWes Worcester
11/06/98 342 - MIKE ###-#### will do on Mon, special insp
INSP - Foundation10/14/199810/15/199810/15/1998AFAIL
DetailsWes Worcester
10/15/98 342 - MIKE ###-#### MOBILE ###-#### inadequayte cover at inter
INSP - Foundation10/9/199810/9/199810/12/1998PFAIL
DetailsWes Worcester
10/09/98 342 - TIM ###-#### poured without special inspection scope of w not pour until log and scope o0n site