INSP - Wall cover | 8/31/1999 | 8/31/1999 | 8/31/1999 | | PASS |
Jim Storey
|
|
|
archived intior finsh report to meet smoke/flame test
|
INSP - Final | 6/8/1999 | 6/8/1999 | 6/8/1999 | P | PASS |
Jim Storey
|
|
|
06/08/99 301 - final ok
|
Permanent Occupancy | | 6/8/1999 | 6/8/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 6/7/1999 | 6/7/1999 | 6/7/1999 | A | FAIL |
Rick Jackson
|
|
|
emergency tested - passed; need balance report for kitchen system; perm address
|
INSP-Alarm Testing | 6/3/1999 | 6/3/1999 | 6/3/1999 | P | PART |
Rick Jackson
|
|
|
tested hood extinguishing system - okay; beed balance report
|
INSP - Framing/Rough-in | 5/21/1999 | 5/24/1999 | 5/24/1999 | A | FAIL |
Jim Storey
|
|
|
05/24/99 301 - c/n isued
|
INSP - Framing/Rough-in | 5/18/1999 | 5/18/1999 | 5/18/1999 | | PASS |
Jim Storey
|
|
|
05/18/99 301 - ceilling ok
|
INSP-Final Inspection | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | FAIL |
Rick Jackson
|
|
|
###-#### TRACY//FINAL 1:00-1:30 PLEASE sprinkler alarms okay; tags and signs needed for sprinklers; alarms not complete; kicthen hood not complete; obstructions in sales floor; c/n issued
|
INSP - Framing/Rough-in | 5/5/1999 | 5/6/1999 | 5/6/1999 | A | FAIL |
Jim Storey
|
|
|
05/06/99 301 - fire calk/ Mel ###-####
|
INSP-Conference | 5/3/1999 | 5/3/1999 | 5/3/1999 | P | PART |
Rick Jackson
|
|
|
###-#### TRACY//CONFERENCE 1:00 discussed c/n items with designers and general contractor
|
INSP - Framing/Rough-in | 4/29/1999 | 4/30/1999 | 4/30/1999 | A | PART |
Jim Storey
|
|
|
04/30/99 301 - fire ceilling systiem supported corectly./canopy framing
|
INSP - Framing/Rough-in | 4/27/1999 | 4/28/1999 | 4/28/1999 | A | PART |
Russ Owen
|
|
|
04/28/99 407 - OK REFREGERATION LINES. FOR FIRE CAULKING RIGHT WALL.
|
INSP - Framing/Rough-in | 4/26/1999 | 4/27/1999 | 4/27/1999 | A | FAIL |
Jim Storey
|
|
|
04/27/99 301 - support of rc to grid not complet at front of store and n
|
INSP - Framing/Rough-in | 4/23/1999 | 4/23/1999 | 4/23/1999 | P | PART |
Jim Storey
|
|
|
04/23/99 301 - ###-#### MEL//SEISMIC BRACING OF GRID CEILING
|
INSP - Framing/Rough-in | 4/21/1999 | 4/21/1999 | 4/21/1999 | P | PART |
Jim Storey
|
|
|
04/21/99 301 - south c/f up to 4 ok fo cover
|
INSP - Framing/Rough-in | 4/19/1999 | 4/19/1999 | 4/19/1999 | P | PASS |
Jim Storey
|
|
|
04/19/99 301 - ###-#### MEL//FIRE CAULKING MEZZANINE ok
|
INSP-Conference | 4/16/1999 | 4/16/1999 | 4/16/1999 | P | PART |
Rick Jackson
|
|
|
fire treated plywodd info okay - sprinklers N/R in pharmacy concealed space
|
INSP - Framing/Rough-in | 4/13/1999 | 4/14/1999 | 4/14/1999 | A | PASS |
Jim Storey
|
|
|
04/14/99 301 - ###-#### mel//fire caulking
|
INSP-Conference | 4/13/1999 | 4/13/1999 | 4/13/1999 | A | PART |
Rick Jackson
|
|
|
left c/n for locating sprinklers under refrigeration lines in mezzanine
|
INSP - Framing/Rough-in | 4/9/1999 | 4/12/1999 | 4/12/1999 | A | PART |
Jim Storey
|
|
|
04/12/99 301 - first bay south end of bldg ok for tile.
|
INSP-Final Inspection | 4/9/1999 | 4/12/1999 | 4/12/1999 | A | PART |
Rick Jackson
|
|
|
###-#### not a final but sprinkler rough-in inspection - okay to cover sales floor area only.
|
INSP - Framing/Rough-in | 4/6/1999 | 4/7/1999 | 4/7/1999 | P | PART |
Jim Storey
|
|
|
04/07/99 301 - Mel ###-#### Conference Seismic Pods on ceiling grids app
|
INSP - Framing/Rough-in | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | FAIL |
Jim Storey
|
|
|
04/05/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 3/26/1999 | 3/26/1999 | 3/26/1999 | | CANC |
Russ Owen
|
|
|
03/26/99 407 - unable to get this today,to many.
|
INSP - Framing/Rough-in | 3/26/1999 | 3/26/1999 | 3/26/1999 | P | CANC |
Russ Owen
|
|
|
###-#### MEL//FRAMING
|
INSP - Framing/Rough-in | 3/19/1999 | 3/22/1999 | 3/22/1999 | A | PART |
Jim Storey
|
|
|
03/22/99 301 - ###-#### MEL//SCREW PATTERN ON DRYWALL back/north and sou
|
INSP - Framing/Rough-in | 3/16/1999 | 3/17/1999 | 3/17/1999 | P | PART |
Jim Storey
|
|
|
03/17/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to start gy
|
INSP-Supply line flush | 3/16/1999 | 3/16/1999 | 3/16/1999 | P | PASS |
Rick Jackson
|
|
|
03/16/99 409 - requested by tracy flush okay
|
INSP - Framing/Rough-in | 3/11/1999 | 3/12/1999 | 3/12/1999 | A | FAIL |
Jim Storey
|
|
|
03/12/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 3/12/1999 | 3/12/1999 | 3/12/1999 | A | PART |
Rick Jackson
|
|
|
###-#### tracy not a final inspection - underground hydro! pass
|
INSP - Framing/Rough-in | 3/8/1999 | 3/9/1999 | 3/9/1999 | A | PART |
Jim Storey
|
|
|
03/09/99 301 - MEL CONFERENCE ###-#### WILL BE ON SITE
|
INSP - Framing/Rough-in | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | FAIL |
Jim Storey
|
|
|
03/04/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 3/3/1999 | 3/4/1999 | 3/4/1999 | P | PART |
Rick Jackson
|
|
|
###-#### not a final - underground inspection only - okay to cover. not installed per plans. requested certification on water flow calcs
|
INSP - Framing/Rough-in | 2/16/1999 | 2/17/1999 | 2/17/1999 | A | PART |
Jim Storey
|
|
|
02/17/99 301 - SOUTH WALL JOINTS OK TO ROOF DECK INSIDE ONLY, OUTSIDE OK
|
INSP - Framing/Rough-in | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | FAIL |
Jim Storey
|
|
|
02/16/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 2/11/1999 | 2/11/1999 | 2/11/1999 | P | PART |
Jim Storey
|
|
|
02/11/99 301 - north half of building roof deeck welding in progess o
|
INSP - Foundation | 2/5/1999 | 2/5/1999 | 2/5/1999 | | PASS |
Jim Storey
|
|
|
/ / 301 - REVIEWED SPECIAL INSP. REPORTS AND ARCHIVED
|
INSP - Foundation | 12/4/1998 | 12/7/1998 | 12/8/1998 | A | PART |
Russ Owen
|
|
|
12/08/98 407 - unable to go by subject to special inspection.
|
INSP - Foundation | 11/25/1998 | 11/25/1998 | 11/25/1998 | P | NR |
Jim Storey
|
|
|
11/25/98 301 - mel -cell # ###-#### ft insp
|
INSP - Foundation | 11/23/1998 | 11/24/1998 | 11/24/1998 | A | PART |
Jim Storey
|
|
|
11/24/98 301 - had pre-const meeting with job supper/rick fire russ stru
|
INSP-Conference | 11/24/1998 | 11/24/1998 | 11/24/1998 | A | PART |
Rick Jackson
|
|
|
fire lanes identified on site plans; reviewed plan check comments with general
|