INSP - Final | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Russ Owen
|
|
|
08/28/98 407 - Scheduled by Hello!. Contact phone is [8912222].
|
INSP - Letter of compliance | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Russ Owen
|
|
|
/ / 407 - lc#15931
|
INSP - Letter of compliance | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Russ Owen
|
|
|
/ / 407 - lc#15931
|
INSP - Energy code compliance | 7/20/1998 | 7/20/1998 | 7/20/1998 | P | PASS |
Russ Owen
|
|
|
07/20/98 407 - Scheduled by Hello!. Contact phone is [8912222].
|
INSP - Energy code compliance | 7/20/1998 | 7/20/1998 | 7/20/1998 | A | FAIL |
Russ Owen
|
|
|
07/20/98 407 - left corrections.
|
INSP - Framing/Rough-in | 7/16/1998 | 7/16/1998 | 7/16/1998 | P | FAIL |
Russ Owen
|
|
|
/ / 407 - need electrical aPPROVAL BUT DID A FRAMING INSP.
|
INSP - Wall cover | 7/14/1998 | 7/14/1998 | 7/14/1998 | P | PASS |
Russ Owen
|
|
|
07/14/98 407 - ok they added more shear panels.
|
INSP - Wall cover | 7/13/1998 | 7/13/1998 | 7/13/1998 | A | FAIL |
Russ Owen
|
|
|
07/13/98 407 - has corrections reinspection required. Need more shear panels,contractor at site,will have done and recall.
|
INSP - Foundation | 6/4/1998 | 6/5/1998 | 6/5/1998 | A | PART |
Russ Owen
|
|
|
06/05/98 407 - footing / ###-####.No approved plans at the site,No plans at all, set backs appear ok, The footings have (2)#4 rebar at all locations garage footing is continous at the front and there are vertical bars with hooks tied to the footing,The footings exceed City's minimum requirements. Note: Later I was informed by the Contractor that the home owner gave them a detail for footings which is not on the City approved plans.
|