Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-01537
StatusExpired
Name MUGS & MOVIES
Site Address 416 S 9TH ST
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(MUGS & MOVIES) Fire sprinklers are used to substitute for 1-hr fire-resistive construction of the building. To construct a tenant space to be used as a theater and a restaurant (6,995 square foot main level - 1,067 square foot mezzanine). Work is to include an interior mezzanine, raised floors, interior stairways, an interior wheelchair lift, and a kitchen all per approved drawings, engineering, and plan review conditions on file. The maximum allowable occupant load for the lobby (88) and for the theater (284) shall be posted on a sign near the main exits from these rooms. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-347-98 DRH-97-0161 **CJW** (12-18-98) IN ORDER TO REDUCE SEWER FEES, THE OWNER DELETED A NUMBER OF ITEMS FROM THE KITCHEN EQUIPMENT PLAN. THERE WERE NO PROPOSED CHANGES TO THE ARCHITECTURAL, STRUCTURAL, ELECTRICAL, PLUMBING, OR MECHANICAL DRAWINGS.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final4/23/19994/23/19994/23/1999PPART
Details
04/23/99 338 - made ok for temp occ signed the temp occ card need perm o
INSP - Final4/21/19994/22/19994/22/1999PFAIL
Details
c/n iiisued signage and signoffs
INSP-Final Inspection4/22/19994/22/19994/22/1999PFAIL
DetailsRick Jackson
occ load signs; extinguishers; sprinkler head in cooler; assembly permit required
INSP-Alarm Testing4/21/19994/21/19994/21/1999PFAIL
DetailsRick Jackson
tested duct detectors only - didn't shut down heat pumps
INSP-Conference3/9/1999 3/9/1999 PART
RESUBMITTALS DISCUSSED WITH CJW AND KYLE OF BRS OK TO CONSTRUCT DUMMY SHAFT BY WRIGHT LEISURE BUT NEEDS PROPER ASSY FOR SAME SHAFT. DUCT CAN BE PLACED BUT WILL BE CAPPED AT THE TOP AND THE BOTTOM. ACCESS TO THE CLEANOUT AT THE TRANSITION ABOVE THE 2ND FLOOR LEVEL IS REQUIRED. SEPERATE PERMITS ARE REQUIRED FOR THE FUTURE HOOD AND SHAFT TO BE DONE AT A LATER DATE. 2-HRS
INSP - Framing/Rough-in2/18/19992/19/19992/19/1999APART
DetailsJim Storey
02/19/99 301 - grid line 9 &12 ok for cover. pennatrations ok on grid li
INSP - Framing/Rough-in2/4/19992/5/19992/5/1999APART
Details
02/05/99 338 - made ok to cover the screen wall only cept for the penetr
INSP - Foundation1/20/19991/22/19991/22/1999APART
Details
made ok to pour with sp insp approval