INSP - Final | 6/25/1999 | 6/25/1999 | 6/25/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP - Final | 6/25/1999 | 6/25/1999 | 6/25/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SHELL BLDG
|
INSP - Final | 6/22/1999 | 6/23/1999 | 6/23/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/23/99 340 - Scheduled by Hello!. Contact phone is [8677613].
|
INSP-Final Inspection | 6/22/1999 | 6/23/1999 | 6/23/1999 | P | FAIL |
Joe Tawney
|
|
|
06/23/99 406 - REINSP FAIL NFPA 72 FORM
|
INSP - Final | 6/11/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Carl Dependahl
|
|
|
06/11/99 340 - c/n, eng's letter, etc, ok for t/o...sign at office pleas
|
INSP-Final Inspection | 6/11/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Joe Tawney
|
|
|
06/11/99 406 - REINSP OK FOR TEMP OCC BARRICADES, NFPA 72
|
INSP-Final Inspection | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | FAIL |
Joe Tawney
|
|
|
06/10/99 406 - REINSP SHELL FAIL SPKLR SPACING, GAS METER BARRICADE, ROT
|
INSP-Sprinkler Rough-in/Hydro | 6/7/1999 | 6/7/1999 | 6/7/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN FAIL HYDRO FDC FAIL
|
INSP-Sprinkler Rough-in/Hydro | 6/4/1999 | 6/4/1999 | 6/4/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FDC PIPING DID NOT HOLD PRESSURE
|
INSP-Final Inspection | 6/1/1999 | 6/2/1999 | 6/2/1999 | A | FAIL |
Joe Tawney
|
|
|
06/02/99 406 - FINAL SHELL FAIL HYDRO TESTS, SPKLR R I, ALARM TEST
|
INSP-Supply line flush | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | PASS |
Rick Jackson
|
|
|
underground flush okay
|
INSP - Framing/Rough-in | 10/7/1998 | 10/7/1998 | 10/9/1998 | P | PART |
|
|
|
10/07/98 338 - made ok to pour with sp insp approvaal tilt up wall panel
|
INSP - Wall cover | 10/2/1998 | 10/2/1998 | 10/2/1998 | P | PART |
|
|
|
10/05/98 338 - madeok to cover
|
INSP - Foundation | 9/24/1998 | 9/25/1998 | 9/25/1998 | A | PART |
|
|
|
09/25/98 338 - made ok to pour with sp insp approval
|