Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD98-01674
StatusFinaled
Name PAT HANIGAN
Site Address 8948 W BARNES ST
Project NameQUE-FINANCIAL
Customer Number 
ePlanReviewNo
Description
QUE-FINANCIAL SERVICE WARE TECHNOLOGIES * TO CONSTRUCT A NEW 11,000 S.F. OFFICE BUILDING. THIS TWO STORY BUILDING HAS A SLAB ON GRADE FOUNDATION WITH PERIMETER FOOTINGS. THE STRUCTURE IS PRE-ENGINEERED STEEL FRAMED WITH METAL STUDS AT THE PERIMETER AND ALUCOBND SKIN, BRICK PILASTERS WITH COLUMNS FLANK THE EXTERIOR. ALUMINUM WINDOWS WRAP THE BUILDING ON ALL FLOORS. THE METAL FLAT ROOF HAS A PARAPET AROUND THE PERIMETER. THE INTERIOR IS COMPLETELY FINISHED WITH METAL STUDS, GYP.BD., LAY-IN CEILING AND BUILT IN CABINETRY. SITE WORK IS TO BE COMPLETE WITH LANDSCAPPING, PATIO, IRRIGATION SYSTEM AND PARKING LOT STRIPING. ALL PER APPROVED PLANS. The building is fully fire sprinkled. DRH97-0237-8948 PC#375-98 jml M_P
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/31/20003/31/2000 DONE
Details
Permanent Occupancy 3/31/20003/31/2000 DONE
Details
BLD-Final3/29/20003/30/20003/30/2000PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/29/2000 at 16:21:06. Contact: ###-####. Card to cont. 3/31/00 8:53:06 AM
FIRE-Final Inspection3/27/20003/28/20003/28/2000PPASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/27/2000 at 16:57:25. Contact: ###-####. Reinsp. ok for perm. occ. 3/29/00 10:11:08 AM
BLD-Final3/24/20003/27/20003/27/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/24/2000 at 15:22:06. Contact: ###-####. N/R 3/28/00 9:16:31 AM
FIRE-Final Inspection3/24/20003/27/20003/27/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/24/2000 at 15:21:09. Contact: ###-####. Reinsp. fail alarm system problems 3/27/00 4:22:25 PM
FIRE-Final Inspection3/23/20003/24/20003/24/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/23/2000 at 09:41:15. Contact: ###-####. Final fail C/N issued. 3/24/00 1:09:45 PM
FIRE-Supply Line Hydro3/10/20003/10/20003/10/2000PPART
DetailsJoe Tawney
terry nelson ###-#### Ok on underground & above ground hydro tests. 3/14/00 11:21:59 AM
BLD-Other2/21/20002/22/20002/22/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/21/2000 at 15:05:39. Contact: ###-####. C/N; need detail for disontinuity. 2/23/00 11:27:01 AM
FIRE-Sprinkler Rough-in1/24/20001/24/20001/26/2000PPART
DetailsJoe Tawney
###-#### Terry Ok to cover hard lid area in south canopy. 1/26/00 2:18:35 PM
BLD-Framing/Rough-in12/10/199912/13/199912/13/1999APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/10/1999 at 14:56:51. Contact: ###-####. Insulation, ok to cover.
FIRE-Supply Line Flush12/9/199912/9/199912/9/1999PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 12/09/1999 at 08:32:22. Contact: ###-####. Ok supply line flush.
BLD-Framing/Rough-in12/2/199912/3/199912/3/1999APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/02/1999 at 15:53:30. Contact: ###-####. Need EFIS listing; ok to insulate ext. walls.
BLD-Framing/Rough-in11/24/199911/24/199911/24/1999PPART
DetailsCarl Dependahl
Need all listing/ install & er. report for EFIS.
BLD-Framing/Rough-in11/19/199911/19/199911/19/1999APART
DetailsCarl Dependahl
Verbal request for EFIS (dryvit) listing for compliance w/UBC 1402; EFIS to be installed over OSB shear walls that are load bearing.
BLD-Framing/Rough-in11/15/199911/15/199911/16/1999PFAIL
DetailsCarl Dependahl
GREG ###-#### CELL R/I-- NAILING INSP C/N.. Hold downs @ mark 4, complete shear wall (int.) roof nailing; ok to begin cover @ ext.
BLD-Framing/Rough-in11/5/199911/8/199911/8/1999APART
DetailsCarl Dependahl
GREG--- FR ###-#### Ext. "Pilasters" only- ok to delets sprinklers.
BLD-Framing/Rough-in11/3/199911/4/199911/4/1999AFAIL
Details
GREG ###-#### Need eng. Written approval of the details submitted by same.
FIRE-Conference11/2/199911/2/199911/2/1999PPART
DetailsJoe Tawney
Conf. on costr. of columns to meet code expectation for spklr. protection.
BLD-Framing/Rough-in11/1/199911/1/199911/1/1999PFAIL
DetailsCarl Dependahl
GREG ###-#### Referred to fire insp. Re: sprinklers @ concealed space
BLD-Foundation10/11/199910/7/199910/8/1999APART
DetailsCarl Dependahl
Pending special insp. report and eng's ok for shear wall construction
BLD-Conference9/23/19999/23/19999/23/1999PPART
DetailsCarl Dependahl
Keep C/N
INSP - Foundation9/14/19999/14/19999/14/1999PPART
DetailsCarl Dependahl
MTI ONSITE, PEND SPCL INSPCTN REPORT
INSP - Foundation9/8/19999/9/19999/9/1999APART
DetailsCarl Dependahl
MT/onsite, prelim soils report (test) ok. Keep c/n, need engr's clarification for sheer walls.
INSP - Footings9/2/19999/2/19999/2/1999 FAIL
DetailsCarl Dependahl
/ / 340 - NEED SPEC INS FTGS;CLARIFY CONST DETAILS: SHEAR WALLS
INSP - Foundation9/1/19999/2/19999/2/1999ACANC
DetailsTom Arcoraci
09/02/99 408 - done by 340
INSP - Foundation9/1/19999/1/19999/1/1999PFAIL
DetailsCarl Dependahl
09/01/99 340 - GREGG ###-####, FOOTING; RECALL, WILL NEED ENG'S CLARIFIC