BLD-Final | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | PASS |
Carl Dependahl
|
|
|
Harvey ###-#### ok for c/o, card to cont.
|
Permanent Occupancy | | 10/5/1999 | 10/5/1999 | | DONE |
|
|
|
|
BLD-Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PART |
Tom Arcoraci
|
|
|
HARVEY ###-#### TEM OCC INSP/ OK FOR PERM OCC
|
FIRE-Final Inspection | 9/30/1999 | 9/30/1999 | 10/1/1999 | P | PASS |
Joe Tawney
|
|
|
HARVEY ###-#### FN FIRE ok
|
FIRE-Final Inspection | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Joe Tawney
|
|
|
HARVEY-- ###-#### FN INSP Final fail access signs, door hardware
|
INSP - Framing/Rough-in | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | PART |
Carl Dependahl
|
|
|
09/02/99 340 - CEILING. HARVEY ###-####
|
INSP-Conference | 8/31/1999 | 9/1/1999 | 9/1/1999 | A | PART |
Joe Tawney
|
|
|
09/01/99 406 - CONF W/HARVEY ON DUCT DET & OTHER ISSUES
|
INSP - Framing/Rough-in | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
Carl Dependahl
|
|
|
08/30/99 340 - CEILING TILE HARVEY ###-####; c/n,need pods, s.closing op
|
INSP - Energy code compliance | 7/6/1999 | 7/7/1999 | 7/7/1999 | A | PART |
|
|
|
07/07/99 338 - MADE OK TO START COVER
|
INSP - Framing/Rough-in | 7/1/1999 | 7/2/1999 | 7/2/1999 | P | PART |
|
|
|
07/02/99 338 - made ok to insulate
|
INSP - Framing/Rough-in | 6/28/1999 | 6/29/1999 | 6/29/1999 | A | PART |
Carl Dependahl
|
|
|
06/29/99 340 - Harvey ###-####; truss fix ok, ok to insulate pend hvac.
|
INSP - Framing/ Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ROOF, OCC SEP WALL OK TO CXOVER
|
INSP - Framing/ Rough-in | 6/21/1999 | 6/21/1999 | 6/21/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ BLDR
|
INSP - Framing/Rough-in | 6/17/1999 | 6/17/1999 | 6/17/1999 | P | PART |
Carl Dependahl
|
|
|
06/17/99 340 - Dennis ###-####; ext nailing ok to cover
|
INSP - Framing/Rough-in | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Carl Dependahl
|
|
|
06/16/99 340 - late am Harvey ###-####, int shear nail ok at E-W wall
|
INSP - Framing/Rough-in | 5/27/1999 | 5/28/1999 | 5/28/1999 | A | PART |
Carl Dependahl
|
|
|
05/28/99 340 - harvey --###-#### hds ok at int wall
|
INSP - Foundation | 4/19/1999 | 4/19/1999 | 4/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - INT FTGS/SLAB OK,SOIL TESTED
|
INSP - Framing/Rough-in | 4/14/1999 | 4/19/1999 | 4/18/1999 | P | NR |
Carl Dependahl
|
|
|
04/19/99 340 - HARVEY--###-#### SLAB INSP; awaiting density report, will
|
INSP - Foundation | 4/16/1999 | 4/16/1999 | 4/16/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FND, THICKENED SLAB BELOW MECH AREA OK
|
INSP - Framing/Rough-in | 4/14/1999 | 4/16/1999 | 4/16/1999 | P | NR |
Carl Dependahl
|
|
|
04/16/99 340 - HARVEY ###-#### --SLAB INSP--FLAT WORK; not frame
|
INSP - Foundation | 4/2/1999 | 4/5/1999 | 4/5/1999 | A | PART |
Carl Dependahl
|
|
|
04/05/99 340 - ###-#### HARVEY//FOUNDATION; discussed bolt locations
|
INSP - Foundation | 4/2/1999 | 4/2/1999 | 4/2/1999 | P | NR |
Carl Dependahl
|
|
|
04/02/99 340 - Harvey ###-#### late pm...nr, will recall when complete
|
INSP - Foundation | 4/1/1999 | 4/1/1999 | 4/1/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FTG AT INT WALL
|
INSP - Foundation | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | PART |
Carl Dependahl
|
|
|
03/31/99 340 - ###-#### HARVEY//FOOTING, part, remainder ext ftgs ok
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | P | PART |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### HARVEY//FOOTING rec'd engs letter for 2500# concrete, no spec insp; ftgs ok to pour
|
INSP - Foundation | 3/24/1999 | 3/24/1999 | 3/24/1999 | P | NR |
Carl Dependahl
|
|
|
03/24/99 340 - footing harvy ###-#### complete forms/ compaqtion
|
INSP - Foundation | 3/23/1999 | 3/18/1999 | 3/18/1999 | P | NR |
Carl Dependahl
|
|
|
conf w/ bldr re spec insp
|
INSP - Foundation | 3/11/1999 | 3/11/1999 | 3/11/1999 | P | PART |
Wes Worcester
|
|
|
03/11/99 342 - HARVEY ###-#### caled Carl to go over special inspection
|