INSP - Final | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
Wes Worcester
|
|
|
01/22/99 342 - TIM DIGITAL ###-#### RE-INSP FIN
|
INSP - Final | 1/20/1999 | 1/21/1999 | 1/21/1999 | A | FAIL |
Wes Worcester
|
|
|
01/21/99 342 - tim digital ###-#### fn-call 1/2 hr before insp handrail,
|
INSP - Grading Inspection | 1/21/1999 | | 1/21/1999 | | BOND |
Rita DeYoung
|
|
|
Grading approved but revegetation is not complete. Slopes above and below house are not revegetated yet. Recommend $500.00 bond to cover cost of revegetation. Upon receipt of bond the grading is approved.
|
INSP - Wall cover | 11/6/1998 | 11/6/1998 | 11/6/1998 | P | PASS |
Wes Worcester
|
|
|
11/06/98 342 - SHEER WALL--TIM ###-####
|
INSP - Energy code compliance | 11/3/1998 | 11/3/1998 | 11/3/1998 | P | PASS |
Wes Worcester
|
|
|
TIM ###-#### REINSPECT
|
INSP - Energy code compliance | 11/3/1998 | 11/3/1998 | 11/3/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Energy code compliance | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | FAIL |
Wes Worcester
|
|
|
11/02/98 342 - TIM ###-#### PAGER REINSPECT
|
INSP - Energy code compliance | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
Carl Dependahl
|
|
|
TIM DOLAN- ###-#### ENERGY CODE...still need seal soffit penetrations...keep c/n on frame. 342 area
|
INSP - Framing/Rough-in | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
Carl Dependahl
|
|
|
TIM DOLAN ###-#### FR/INSP...complete fastening truss hangers, complete air seal, some missed.
|
INSP - Framing/Rough-in | 10/29/1998 | 10/29/1998 | 10/29/1998 | P | FAIL |
Carl Dependahl
|
|
|
TIM ###-#### PLEASE CALL WOULD LIKE TO MEET YOU THERE per 325 c/n, fireblocks, truss hangers, add brace panels plate-to-plate at upper floor as needed (gyp ok)...etc, ok to insul.
|
INSP - Framing/Rough-in | 10/21/1998 | 10/21/1998 | 10/22/1998 | P | PART |
Wes Worcester
|
|
|
10/21/98 342 - tim- ###-#### digital -preliminary fr-shear wall insp
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | NR |
Wes Worcester
|
|
|
10/20/98 342 - SHEAR WALL /###-####
|
INSP - Foundation | 9/1/1998 | 9/1/1998 | 9/1/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 | | PART |
Wes Worcester
|
|
|
09/01/98 342 - rebar john ###-####
|
INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 | P | FAIL |
Wes Worcester
|
|
|
09/01/98 342 - landscaping/retaining wall over 4', retaining earth and w slope > than 2:1 needs design engineering
|
INSP - Foundation | 8/27/1998 | 8/28/1998 | 8/28/1998 | A | NR |
Wes Worcester
|
|
|
08/28/98 342 - rebar/steel footing john ###-####
|
INSP - Foundation | 8/28/1998 | 8/28/1998 | 8/28/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|