INSP - Final | 1/19/1999 | 1/20/1999 | 1/20/1999 | P | PASS |
|
|
|
made ok for perm signed the perm col
|
INSP-Final Inspection | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | PASS |
Rick Jackson
|
|
|
01/20/99 409 - JR ###-#### occ approved
|
Permanent Occupancy | | 1/20/1999 | 1/20/1999 | | DONE |
|
|
|
|
INSP - Final | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
|
|
|
01/11/99 338 - signed the temp col of the occ req card need hood for the
|
INSP-Final Inspection | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
Rick Jackson
|
|
|
JR ###-#### NFPA 72; detector for doors on upper floor; elevator shaft has expsoed wood
|
INSP - Final | 1/7/1999 | 1/8/1999 | 1/8/1999 | P | FAIL |
|
|
|
01/08/99 333 - not ready
|
INSP-Final Inspection | 1/7/1999 | 1/8/1999 | 1/8/1999 | P | FAIL |
Rick Jackson
|
|
|
JR ###-#### doors in corridor not complete, retest alarms
|
INSP - Final | 12/29/1998 | 12/30/1998 | 12/30/1998 | A | FAIL |
|
|
|
12/30/98 333 - not ready left note to Jr that its not ready
|
INSP-Final Inspection | 12/22/1998 | 12/22/1998 | 12/22/1998 | P | FAIL |
Rick Jackson
|
|
|
JR ###-#### test generator and alarms; knox box; sprinkler line wrong; label and certify gas; install doors and hardware; extinguishers; penetrations; finish elevator and doors
|
INSP - Framing/Rough-in | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PART |
|
|
|
12/04/98 333 - ceilings ok all but corridors firestops not done in corri
|
INSP - Framing/Rough-in | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | PART |
|
|
|
12/01/98 333 - conf on ceilings
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | FAIL |
|
|
|
11/19/98 333 - elevator not complete need cover at landings ok to cover
|
INSP - Framing/Rough-in | 11/5/1998 | 11/5/1998 | 11/6/1998 | P | PART |
Tom Arcoraci
|
|
|
11/05/98 408 - JR ###-#### ok to vover int walls and lid check shaft for gen set
|
INSP-Conference | 11/2/1998 | 11/2/1998 | 11/2/1998 | A | PART |
|
|
|
discussed 1 hr ceiling membrane, advised to present assempbly to structural inspector for review to drop 1 hr celing below services. advise the med gas room ventialtion may not be changed without revising plans. smoke damper in coridor was being installed improperly. showed mech contractor and general.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | CANC |
Joe Tawney
|
|
|
11/02/98 406 - jr ###-#### ceiling reading CANCEL TO BE DONE BY 405
|
INSP - Framing/Rough-in | 10/29/1998 | 10/30/1998 | 10/30/1998 | A | PART |
|
|
|
10/30/98 333 - talked about 1hr wall at entry
|
INSP - Framing/Rough-in | 10/15/1998 | 10/16/1998 | 10/16/1998 | A | PART |
|
|
|
10/16/98 333 - checked on ada per plan
|