Permit Information
Permit NumberBLD98-02012
StatusFinaled
Name DAVIES & ROURKE
Site Address 3637 N LAKEHARBOR LN
Project NameDAVIES & ROURKE ADVR
Customer Number 
ePlanReviewNo
Description
DAVIES & ROURKE * TO CONSTRUCT A NEW 5288 SQ. FT. SINGLE STORY OFFICE BUILDING. Work to include site work and complete building for tenant occupancy. The construction is wood froam with a crawlspace and a trussed and stick framed roof system. The building is not sprinklered. DRH98-0105 CUP 98-39 PC#457-98 jml
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final12/4/199812/4/199812/4/1998PPASS
DetailsCarl Dependahl
joe ###-#### fn occ insp...ok, card to contractor.
Permanent Occupancy 12/4/199812/4/1998 DONE
Details
INSP - Final12/3/199812/3/199812/3/1998PFAIL
DetailsCarl Dependahl
keep c/n, rec'd arch's letter re exit signs, ok. still need code enforcement ok
INSP - Final11/30/199812/1/199812/1/1998ACANC
DetailsRuss Owen
12/01/98 407 - TRANS TO CARL .D
INSP - Final12/1/199812/1/199812/1/1998PFAIL
DetailsCarl Dependahl
need P&Z ok, install temp glass & all signage (exit, accessible, etc.) OK for T/O, card to contractor.
INSP - Final11/30/199811/30/199811/30/1998PFAIL
DetailsCarl Dependahl
joe 870 4930...question re final insp...need plbg, install temp glazing. not complete insp.
INSP - Final11/25/199811/27/199811/27/1998PNR
DetailsWes Worcester
11/27/98 342 - JOE ###-####
INSP-Final Inspection11/27/199811/27/199811/27/1998APASS
DetailsRick Jackson
occ approved
INSP-Final Inspection11/25/199811/25/199811/25/1998AFAIL
DetailsRick Jackson
address; mount extinguishers
INSP - Framing/Rough-in10/27/199810/28/199810/28/1998APART
DetailsCarl Dependahl
joe ###-#### ok to cover shear walls ok
INSP - Framing/Rough-in10/27/199810/27/199810/27/1998APART
DetailsCarl Dependahl
conf only, re c/n 10-26-98.
INSP - Framing/Rough-in10/23/199810/26/199810/26/1998PFAIL
DetailsCarl Dependahl
JOE ###-####,c/n, need eng's report for trusses cut, fireblocks, temp glazing at doors, etc. ok to insul
INSP - Conference10/22/199810/22/199810/22/1998 PASS
DetailsAlan Hauser
/ / 350 - called to see if hvac had permit, they did
INSP - Framing/Rough-in10/15/199810/15/199810/15/1998PPART
DetailsCarl Dependahl
carpentry only; met w/ super, need all shear panels installed per eng'd plan.
INSP - Framing/Rough-in10/13/199810/13/199810/13/1998PFAIL
DetailsCarl Dependahl
not complete frame, carpentry only; has detail for alternate brg at int wall (pony wall on spead ftg shares load w/ stem wall.) need truss eng's detail for trusses to be cut/trimmed at brg
INSP - Framing/Rough-in10/12/199810/12/199810/12/1998PFAIL
DetailsCarl Dependahl
conf only w/ super re truss bracing....need lateral braces in lieu of hard lid. verbal c/n.
INSP - Framing/Rough-in10/8/199810/8/199810/8/1998PNR
DetailsCarl Dependahl
CARPENTRY ONLY, SPOKE W/ FRAMER. NEED ENG'S REPORT PRIOR TO COMPLETE FRAME INSP.
INSP - Foundation10/5/199810/5/199810/5/1998PPART
DetailsCarl Dependahl
met w/ framer...need eng's design for change in brg at strip ftg rather than isolated pads (roof/wall loads). wip/ carpentry insp only.
INSP - Framing/Rough-in9/22/19989/22/19989/22/1998PPART
DetailsCarl Dependahl
joe/ beniton constr; floor framing: verbal to strap pony walls...still need eng'g report for change in brg locations from pads to pony wall.
INSP - Framing/Rough-in9/17/19989/17/19989/17/1998PPART
DetailsCarl Dependahl
joe ###-#### partial insp...FLOOR FRAMING...NEED ENG'S DESIGN FOR ADD'L BEARING PONY WALL IN LIEU OF PIERS/SADDLES...WORK LOOKS OK. SUPT. WILL PROVIDE (HAS?) INFO.
INSP - Concrete9/11/19989/11/19989/11/1998PPART
DetailsCarl Dependahl
conf w/ wes re eng'd resubmittal...he approved ftg pour
INSP - Foundation9/10/19989/10/19989/10/1998ANR
DetailsCarl Dependahl
conf only ...w/ Bruce Poe , arch
INSP - Foundation9/10/19989/10/19989/10/1998PPASS
DetailsWes Worcester
09/10/98 342 - TIM ###-####
INSP - Foundation9/9/19989/9/19989/9/1998PNR
DetailsCarl Dependahl
conf only...w/ arch, resubmittal
INSP - Foundation9/8/19989/8/19989/8/1998PNR
DetailsCarl Dependahl
conf only...rec'd add'l resub re roof framing/found. modifications. Discussed w/ Jon Levien.
INSP - Foundation9/8/19989/8/19989/8/1998 PART
DetailsWes Worcester
09/08/98 342 - need engineering for change of 4 sq ft from 9 sq ft pier
INSP - Foundation9/4/19989/8/19989/8/1998APART
DetailsWes Worcester
09/08/98 342 - tim ###-####
INSP - Foundation9/3/19989/3/19989/3/1998 PASS
DetailsWes Worcester
/ / 342 - went bk at 11 am
INSP - Foundation9/3/19989/3/19989/3/1998PNR
DetailsWes Worcester
09/03/98 342 - tim ###-####
INSP - Foundation9/2/19989/2/19989/2/1998ANR
DetailsCarl Dependahl
conf only w/ Bruce Poe...will send roof diagram for previous resubmittal.
INSP - Foundation8/31/19988/31/19988/31/1998PPEND
DetailsCarl Dependahl
conf only w/ John Levein re fnd resubmittal. Need roof framing diagram for full review.
INSP - Foundation8/31/19988/31/19988/31/1998PPEND
DetailsCarl Dependahl
requested roof diagram from Doug Tamura to attach to fnd resub.
INSP - Foundation8/27/19988/28/19988/28/1998APASS
DetailsWes Worcester
08/28/98 342 - joe ###-####
INSP - Foundation8/27/19988/27/19988/27/1998PNR
DetailsCarl Dependahl
conf only...no spec insp req'd; resubmittal ok for foundation
INSP - Foundation8/26/19988/27/19988/27/1998AFAIL
DetailsWes Worcester
08/27/98 342 - rebar in dirt ì
INSP - Foundation8/25/19988/26/19988/27/1998PPART
DetailsWes Worcester
08/26/98 342 - footing as close to 3:30pm joe ###-####
INSP - Foundation8/26/19988/26/19988/26/1998ANR
DetailsCarl Dependahl
conf only, rec'd reusubmittal for fnd; chk'd vault for original plans
INSP - Foundation8/25/19988/26/19988/26/1998ANR
DetailsWes Worcester
08/26/98 342 - FOOTING--###-#### JOE
INSP - Foundation8/25/19988/25/19988/25/1998PNR
DetailsCarl Dependahl
conf only...w/ Bruce Poe, project arch.