INSP - Final | 6/18/1999 | 6/21/1999 | 6/21/1999 | A | PASS |
Carl Dependahl
|
|
|
06/21/99 340 - 859+2755/*/FINAL; ok card to bldr
|
INSP-Final Inspection | 6/17/1999 | 6/17/1999 | 6/17/1999 | P | PASS |
Joe Tawney
|
|
|
06/17/99 406 - REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 6/17/1999 | 6/17/1999 | | DONE |
|
|
|
|
INSP - Final | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR TEMP OCC KNOX BOX, NFPA 72
|
INSP-Final Inspection | 6/1/1999 | 6/1/1999 | 6/1/1999 | P | NR |
Joe Tawney
|
|
|
06/01/99 406 - FINAL NOT READY RESCHED FOR 6/2/99 1:00 PM
|
INSP - Framing/Rough-in | 4/21/1999 | 4/22/1999 | 4/22/1999 | A | PART |
Carl Dependahl
|
|
|
04/22/99 340 - CONFERENCE Shawn ###-####, need all sigs for final
|
INSP - Final | 4/20/1999 | 4/21/1999 | 4/21/1999 | A | NR |
Carl Dependahl
|
|
|
04/21/99 340 - ###-#### SHAWN//CONFERENCE
|
INSP-Final Inspection | 4/16/1999 | 4/16/1999 | 4/16/1999 | P | FAIL |
Joe Tawney
|
|
|
04/16/99 406 - REINSP FAIL SUITE NMBRS, SEAL ONE HOUR WALLS
|
INSP-Sprinkler Rough-in/Hydro | 3/11/1999 | 3/11/1999 | 3/11/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
|
INSP-Sprinkler Rough-in/Hydro | 3/11/1999 | 3/11/1999 | 3/11/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON ABOVE GROUND HYDRO TEST
|
INSP-Final Inspection | 3/8/1999 | 3/9/1999 | 3/9/1999 | A | FAIL |
Joe Tawney
|
|
|
03/09/99 406 - FINAL FAIL SPKLR SYSTEM, FIRE EXT, DOOR LANDINGS
|
INSP - Framing/Rough-in | 2/12/1999 | 2/12/1999 | 2/12/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - verbal c/n: nail off all shear panels at blocks and edges pe when ready
|
INSP - Framing/Rough-in | 12/22/1998 | 12/23/1998 | 12/23/1998 | A | PART |
|
|
|
12/23/98 338 - made ok to cover interior walls
|
INSP - Framing/Rough-in | 11/25/1998 | 11/30/1998 | 11/30/1998 | A | PART |
|
|
|
11/30/98 338 - made ok to cover roof .
|
INSP - Foundation | 9/28/1998 | 9/28/1998 | 9/28/1998 | P | PART |
|
|
|
09/28/98 338 - MADE OK TO POUR THE INTERIOR FOOTINGS WITH THE SLAB
|
INSP - Conference | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PART |
|
|
|
/ / 338 - MADE OK Q'S ON PLACCEMENT OF THE ANCHOR BOLTS IN THE INTERIO
|
INSP - Foundation | 9/18/1998 | 9/21/1998 | 9/21/1998 | A | PART |
|
|
|
09/21/98 338 - MADE OK TO POUR THE FOUND WALLS FORMS ANND R-BAR PLACED.
|
INSP - Foundation | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | PASS |
|
|
|
09/17/98 338 - MADED OK WITH SP INSP APPROVAL ON THE EPOXY BAR
|
INSP - Foundation | 9/9/1998 | 9/10/1998 | 9/10/1998 | A | PASS |
|
|
|
09/10/98 338 - conf ok to proceed eed eng for fill ok
|