INSP - Final | 1/22/1999 | 1/25/1999 | 1/25/1999 | A | PASS |
Wes Worcester
|
|
|
01/25/99 342 - robert head- ###-#### fn occ insp
|
INSP - Final | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | FAIL |
Wes Worcester
|
|
|
01/22/99 342 - ROBERT ###-#### FINAL OCC no answer, unknown access, left
|
INSP - Final | 1/7/1999 | 1/7/1999 | 1/8/1999 | P | FAIL |
Wes Worcester
|
|
|
Robert Head ###-#### per 338, bcec, other inspections, clean crawl
|
INSP - Framing/Rough-in | 10/21/1998 | 10/22/1998 | 10/23/1998 | A | PASS |
|
|
|
10/22/98 333 - ROBERT HEAD-###-#### FR & INSULATION INSP FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | PART |
Wes Worcester
|
|
|
10/20/98 342 - DON ###-#### CALL FIRST
|
INSP - Framing/Rough-in | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
Wes Worcester
|
|
|
10/16/98 342 - robert ###-#### conference at 1:30-2:00
|
INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/13/1998 | P | PART |
Wes Worcester
|
|
|
10/13/98 342 - DONALD ###-#### SHEARNAIL
|
INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 | P | FAIL |
Wes Worcester
|
|
|
10/08/98 342 - ROBERT ###-#### SHEAR WALL 8am apt, not nailed off, not hdr bracing not in, sheathing membrane broken
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
Wes Worcester
|
|
|
10/06/98 342 - robert ###-#### conference
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | NR |
Carl Dependahl
|
|
|
conf only w/ Bob, owner; need resubmittal clarifying duplex only const: minimum (1) 1hr wall & draft stop to deck
|
INSP - Wall cover | 9/25/1998 | 9/25/1998 | 9/25/1998 | | PASS |
|
|
|
1hr walls in attic.
|
INSP - Framing/Rough-in | 9/25/1998 | 9/25/1998 | 9/24/1998 | P | PART |
|
|
|
09/25/98 333 - firewall ok
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | A | NR |
Wes Worcester
|
|
|
09/22/98 342 - don slynn-###-#### for fire wall insp-
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PART |
Wes Worcester
|
|
|
09/22/98 342 - Bob A inspected
|
INSP - Wall cover | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PASS |
|
|
|
Sheeyrock nailing and fireblock installation of 2 1hr walls.
|
INSP - Wall cover | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | PART |
Wes Worcester
|
|
|
09/14/98 342 - RON ###-#### FIRE WALL INSPECTION
|
INSP - Foundation | 8/24/1998 | 8/24/1998 | 8/25/1998 | P | CANC |
Tom Arcoraci
|
|
|
08/24/98 408 - ###-#### dwayne footing DONE BY 342
|