BLD-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Jim Storey
|
|
|
tammy ###-####
|
INSP - Final | 2/16/1999 | 2/16/1999 | 2/18/1999 | P | FAIL |
Jim Storey
|
|
|
02/16/99 301 - PENDING SPECIAL INSP. REPORT FINAL.
|
INSP - Final | 2/16/1999 | 2/16/1999 | 2/16/1999 | | NR |
Jim Storey
|
|
|
02/16/99 301 - front landing ok ada at curb cut ok ceilling at entry ok
|
INSP - Framing/Rough-in | 10/29/1998 | 10/29/1998 | 10/29/1998 | | PASS |
Jim Storey
|
|
|
10/28/98 301 - south wall framing ok
|
INSP - Foundation | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | PART |
Jim Storey
|
|
|
10/27/98 301 - steve ###-#### footing FTG -OK FOOTING
|
INSP - Framing/Rough-in | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | PART |
Jim Storey
|
|
|
10/27/98 301 - steve ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 10/7/1998 | 10/7/1998 | 10/7/1998 | | PASS |
Jim Storey
|
|
|
/ / 301 - recieved resubmittal of briggs engineering of weld connectio screws. archived to approved plan.
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | | FAIL |
Jim Storey
|
|
|
/ / 301 - STEVE ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NL -OK FINAL
|
INSP - Wall cover | 10/2/1998 | 10/2/1998 | 10/2/1998 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 9/30/1998 | 10/1/1998 | 10/1/1998 | A | PART |
Jim Storey
|
|
|
10/01/98 301 - STEVE ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to start cover need clearifacation form engineer and engineers report of field review.
|
INSP - Framing/Rough-in | 11/30/1998 | 12/1/1998 | 12/19/1980 | A | PASS |
Jim Storey
|
|
|
12/01/98 301 - both entrys ok for cover.
|