Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-02163
StatusExpired
Name ALLEN QUINTERI
Site Address 300 W FORT ST
Project NameSCHOOL
Customer Number 
ePlanReviewNo
Description
BOISE HIGH SCHOOL BASEBALL FIELD AT FORT BOISE * THE WORK INCLUDES RECONFIGURING AND REHABILITATING EXISTING AREA INTO A BALL FIELD COMPLETE WITH FENCING, TWO STORY 827 SQ. FT., TYPE VN, CONCESSIONS BUILDING WITH RESTROOMS AND PRESSBOX ON SECOND FLOOR, DUGOUTS, CONCRETE PAVING, LANDSCAPING, AND INSTALLATION OF A LAWN SPRINKLER SYSTEM. PC#497-98 FIRST FLOOR OF CONCESSION IS 525 SQ. FT. WITH SECOND FLOOR AT 302 SQ. FT. NO SPECTATOR SEATING IS INCLUDED WITH THIS PERMIT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Framing/Rough-in11/23/199811/24/199811/24/1998ANR
Details
11/24/98 333 - frame not ready
INSP - Wall cover10/2/199810/5/199810/5/1998AFAIL
DetailsJim Storey
10/05/98 301 - cmu walls randy ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED cmu gruted with out insp have special insp. verify bar location.
INSP - Foundation9/18/19989/18/19989/18/1998PPART
DetailsJim Storey
09/18/98 301 - special insp on site pending report slip form cason pour.
INSP - Foundation9/16/19989/17/19989/17/1998AFAIL
DetailsJim Storey
09/17/98 301 - Scheduled by Hello!. Contact phone is [9392822]. insp allready done c/n posted by wes w.