Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD98-02202
StatusFinaled
Name MIKE HASHIM
Site Address 8515 W FAIRVIEW AVE
Project NameBURGER KING
Customer Number 
ePlanReviewNo
Description
TO CONSTURCT A 2728 s.f.BURGER KING RESTAURANT AND 825 s.f. PLAYGROUND INCLUDING SITE WORK * THE CONSTRUCTION IS SLAB ON GRADE WITH WOOD AND STEEL STRUCTURAL WALLS AND A TRUSSED ROOF SYSTEM AND STUCCO SIDING. DRH98-0112 CUP98-0056 PC#502-98 JML
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/8/19994/8/1999 DONE
Details
INSP - Final3/30/19993/30/19993/30/1999PPART
DetailsCarl Dependahl
03/30/99 340 - ###-#### struct ok for perm occ, has fee due???
INSP - Final3/25/19993/25/19993/25/1999PFAIL
DetailsCarl Dependahl
03/25/99 340 - burger king\\###-#### ty keep c/n, need eng's letter. recall
INSP-Conference3/25/19993/25/19993/25/1999 PASS
DetailsJoe Tawney
/ / 406 - GAVE CONTR APPROVAL FOR ASSEMBLY PERMIT
INSP-Conference3/25/19993/25/19993/25/1999 PASS
DetailsJoe Tawney
/ / 406 - GAVE CONTR APPROVAL FOR ASSEMBLY PERMIT
INSP - Final3/23/19993/24/19993/24/1999AFAIL
DetailsCarl Dependahl
03/24/99 340 - ###-#### TY//FINAL c/n,need plbg, c.dh.d.& eng's final acceeptance. ok for t/o card to bldr
INSP-Final Inspection3/23/19993/24/19993/24/1999APASS
DetailsJoe Tawney
03/24/99 406 - REINSP OK FOR PERM OCC
INSP-Final Inspection3/22/19993/23/19993/23/1999AFAIL
DetailsJoe Tawney
03/23/99 406 - REINSP FAIL DUCT DET, AIR BAL FOR HOODS
INSP - Final3/22/19993/22/19993/22/1999PFAIL
DetailsCarl Dependahl
03/22/99 340 - need other finals, recall
INSP-Final Inspection3/19/19993/22/19993/22/1999ANR
DetailsJoe Tawney
03/22/99 406 - NOT READY FOR FINAL
INSP - Framing/Rough-in3/19/19993/19/19993/19/1999PFAIL
DetailsCarl Dependahl
03/19/99 340 - ###-#### TY//RI CEILING GRID install seismic braces, has elec cn
INSP - Framing/Rough-in3/11/19993/11/19993/12/1999PFAIL
DetailsCarl Dependahl
03/11/99 340 - SCOTT ###-#### SUSPENDED ACOUSTICAL CEILING INSPECTION need seismic braces
INSP - Framing/Rough-in2/19/19992/22/19992/24/1999AFAIL
DetailsCarl Dependahl
shaft for broiler hood ###-#### Ty...looks ok, need detail for 1hr const. chk w/ ISI & alan H. for his ok
INSP - Framing/Rough-in2/23/19992/23/19992/23/1999APART
DetailsAlan Hauser
shaft not ready, had to change for clearances
INSP - Framing/Rough-in2/16/19992/16/19992/16/1999 PART
DetailsCarl Dependahl
/ / 340 - play area, part
INSP - Wall cover2/16/19992/16/19992/16/1999PPART
DetailsCarl Dependahl
02/16/99 340 - ###-#### Ty; part, rec'd eng's clarification, ok to cover report for steel frame (field insp onsite)
INSP - Framing/Rough-in2/11/19992/11/19992/12/1999PPART
DetailsCarl Dependahl
02/11/99 340 - PLAY GROUND\\###-####
INSP - Framing/Rough-in2/8/19992/9/19992/9/1999APART
DetailsCarl Dependahl
02/09/99 340 - ###-#### TY, c/n need all other oks, spec insp for t.s. m
INSP - Framing/Rough-in2/8/19992/8/19992/8/1999PCANC
Details
cover inspection tye ###-#### cant do because plumbing is not done
INSP - Wall cover2/3/19992/4/19992/4/1999PFAIL
DetailsCarl Dependahl
02/04/99 340 - TY ###-#### keep cn, ok to cover int wall as noted
INSP - Framing/Rough-in2/3/19992/3/19992/3/1999 FAIL
DetailsCarl Dependahl
/ / 340 - part, 2nd cn, need fix at west wall, plate missed at trusss, walls as noted
INSP - Framing/Rough-in2/3/19992/3/19992/3/1999PFAIL
DetailsCarl Dependahl
TY ###-####, part, dining, kitchen only, c/n; has plbg c/n
INSP - Framing/Rough-in2/2/19992/2/19992/2/1999PFAIL
DetailsCarl Dependahl
###-#### Ty c/n
INSP - Framing/Rough-in2/2/19992/2/19992/2/1999 FAIL
DetailsCarl Dependahl
/ / 340 - ext walls ...c/n , need fireblocks, detail shear panels ( en
INSP - Framing/Rough-in2/1/19992/1/19992/1/1999PFAIL
DetailsCarl Dependahl
02/01/99 340 - TY ###-#### COVER INSP fail, has plbg c/n
INSP - Framing/Rough-in1/29/19991/29/19991/29/1999PFAIL
DetailsRuss Owen
01/29/99 407 - need other inspections before a structural.
INSP - Framing/Rough-in1/21/19991/21/19991/21/1999PPART
Details
ty- ###-#### fr insp-sheathing for roof & ex siding & hold downs need to tighten down the nuts on the east side shear panel.
INSP - Framing/Rough-in12/15/199812/15/199812/15/1998PPART
Details
12/15/98 338 - ok to pour only signed off areas c/n in force need compac
INSP - Foundation12/10/199812/11/199812/11/1998AFAIL
Details
12/11/98 338 - not ready organics in the pour area