INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PASS |
Jim Storey
|
|
|
09/18/98 301 - JASON ###-#### FNL -OK FINAL card on site.
|
INSP-Final Inspection | 9/17/1998 | 9/17/1998 | 9/17/1998 | P | PASS |
Rick Jackson
|
|
|
jason ###-#### occ approved
|
INSP-Sprinkler Rough-in/Hydro | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | FAIL |
Rick Jackson
|
|
|
JASON ###-#### FIRE LIFE SAFETY INSP-4TH FLOOR SUITE 410 heads within 6 ft of each other; hangers not correct
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Jim Storey
|
|
|
08/26/98 301 - jason ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 8/21/1998 | 8/21/1998 | 8/21/1998 | P | FAIL |
Jim Storey
|
|
|
08/21/98 301 - JASON ###-#### SUITE 410 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need ele and mech as well as approved plan on site for reinsp.
|