INSP - Letter of compliance | 11/25/1998 | 11/25/1998 | 11/25/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16293
|
INSP - Letter of compliance | 11/25/1998 | 11/25/1998 | 11/25/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16293
|
INSP - Final | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | PASS |
Jim Sly
|
|
|
11/24/98 316 - C/C # 16293
|
INSP - Final | 11/23/1998 | 11/23/1998 | 11/24/1998 | P | FAIL |
Tom Arcoraci
|
|
|
11/23/98 408 - walt ###-#### as late as possible
|
INSP - Framing/Rough-in | 10/5/1998 | 10/6/1998 | 10/6/1998 | A | PASS |
Jim Sly
|
|
|
10/06/98 316 - WALT ###-#### REINSPECT
|
INSP - Energy code compliance | 10/2/1998 | 10/5/1998 | 10/5/1998 | A | FAIL |
Tom Arcoraci
|
|
|
10/05/98 408 - walt ###-#### no eng ì
|
INSP - Framing/Rough-in | 10/1/1998 | 10/2/1998 | 10/5/1998 | A | FAIL |
Tom Arcoraci
|
|
|
10/02/98 408 - WALT ###-#### no letter from eng on hold down sub
|
INSP - Framing/Rough-in | 9/30/1998 | 10/1/1998 | 10/5/1998 | A | FAIL |
Jim Sly
|
|
|
10/05/98 316 - C/N....Misc engineering
|
INSP - Framing/Rough-in | 10/1/1998 | 10/1/1998 | 10/1/1998 | | FAIL |
Jim Sly
|
|
|
10/01/98 316 - C/N...Seal at floor deck, Need Eng for 42 in lieu of 22 H
|
INSP - Framing/Rough-in | 9/30/1998 | 9/30/1998 | 10/1/1998 | P | FAIL |
Tom Arcoraci
|
|
|
09/30/98 408 - walt ###-####
|
INSP - Foundation | 8/18/1998 | 8/19/1998 | 8/20/1998 | P | NR |
Tom Arcoraci
|
|
|
08/19/98 408 - BETWEEN 3-4 PM ###-####/ ALREADY POURED APPEARS OK
|
INSP - Conference | 8/19/1998 | 8/19/1998 | 8/19/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 - Insp of excavation for foundation....
|