BLD-Final | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PART |
Jim Storey
|
|
|
Call 1st - Mike # ###-#### - he will meet you on this one at the same as Bldg. A pend special insp. Resolve of discrepence.
|
INSP-Alarm Testing | 8/2/1999 | 8/5/1999 | 8/5/1999 | A | PASS |
Rick Jackson
|
|
|
sprinkler system monitored okay; alarms okay
|
INSP-Final Inspection | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
Rick Jackson
|
|
|
temp occ approved; need spare heads and proper sized outlet on inspectors test
|
INSP-Alarm Testing | 7/20/1999 | 7/21/1999 | 7/21/1999 | A | FAIL |
Rick Jackson
|
|
|
GEORGE PAGER ###-#### no phone lines
|
INSP-Final Inspection | 7/15/1999 | 7/15/1999 | 7/15/1999 | A | FAIL |
Rick Jackson
|
|
|
need to test alarms and sprinklers; knox box; off site monitoring
|
INSP-Final Inspection | 7/14/1999 | 7/14/1999 | 7/14/1999 | A | NR |
Rick Jackson
|
|
|
GEORGE ###-#### PAGER talked to him on phone and alarms not ready
|
INSP-Supply line flush | 4/30/1999 | 4/30/1999 | 4/30/1999 | P | PASS |
Rick Jackson
|
|
|
flush okay
|
INSP - Framing/Rough-in | 4/2/1999 | 4/5/1999 | 4/5/1999 | P | PART |
Jim Storey
|
|
|
04/05/99 301 - front canopy pending ele work in progess.
|
INSP - Framing/Rough-in | 3/30/1999 | 3/31/1999 | 3/31/1999 | A | FAIL |
Jim Storey
|
|
|
03/31/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Sprinkler Rough-in/Hydro | 3/12/1999 | 3/12/1999 | 3/12/1999 | | PART |
Rick Jackson
|
|
|
/ / 409 - UNDERGROUND OKAY TO COVER
|
INSP - Foundation | 2/5/1999 | 2/5/1999 | 2/5/1999 | | PASS |
Jim Storey
|
|
|
/ / 301 - REVIEWED SPECIAL INSPECTION REPORTS AND ARCHIVED
|
INSP - Foundation | 2/3/1999 | 2/3/1999 | 2/3/1999 | P | PART |
Jim Storey
|
|
|
02/03/99 301 - covered with special insp. pending report
|
INSP - Concrete | 2/1/1999 | 2/2/1999 | 2/2/1999 | P | FAIL |
Jim Storey
|
|
|
02/02/99 301 - n/r
|
INSP - Foundation | 1/28/1999 | 1/29/1999 | 1/29/1999 | P | PART |
Jim Storey
|
|
|
01/29/99 301 - covered by special insp. pending report.
|
INSP - Foundation | 1/25/1999 | 1/26/1999 | 1/26/1999 | P | CANC |
Jim Storey
|
|
|
01/26/99 301 - called and canclled
|
INSP - Foundation | 1/22/1999 | 1/25/1999 | 1/25/1999 | P | CANC |
Jim Storey
|
|
|
01/25/99 301 - office called and cancled
|
INSP - Foundation | 1/19/1999 | 1/20/1999 | 1/20/1999 | P | FAIL |
Jim Storey
|
|
|
01/20/99 301 - a bld. nw front colum rebar not tied in place. have engin
|
INSP - Foundation | 1/13/1999 | 1/14/1999 | 1/14/1999 | P | PART |
Jim Storey
|
|
|
01/14/99 301 - COVERED WITH S/I PENDING REPORT.
|
INSP - Foundation | 1/12/1999 | 1/13/1999 | 1/13/1999 | P | PART |
Jim Storey
|
|
|
01/13/99 301 - covered with s/i pending repore rebar ok
|
INSP - Foundation | 1/11/1999 | 1/12/1999 | 1/12/1999 | P | PASS |
Jim Storey
|
|
|
01/12/99 301 - FRMS-OK FORMS pending s/i report.
|
INSP - Foundation | 1/8/1999 | 1/8/1999 | 1/8/1999 | | PART |
Russ Owen
|
|
|
/ / 407 - NEED OK FROM ENGINEER TO EPOXIE SOME ANCHOR BOLTS.CONTRACTOR
|
INSP - Framing/Rough-in | 1/6/1999 | 1/7/1999 | 1/8/1999 | P | FAIL |
Jim Storey
|
|
|
01/07/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED report discrep
|
INSP - Foundation | 1/5/1999 | 1/6/1999 | 1/6/1999 | P | PART |
Jim Storey
|
|
|
01/06/99 301 - coved with special insp pending report.
|
INSP - Foundation | 12/30/1998 | 12/31/1998 | 12/31/1998 | A | NR |
Jim Storey
|
|
|
12/31/98 301 - CARL- ###-#### FT BLD B
|
INSP - Foundation | 1/4/1998 | 1/4/1998 | 1/4/1998 | | PART |
Jim Storey
|
|
|
01/04/99 301 - placed w/si pending report.
|
INSP - Final | 1/1/1959 | 1/1/1959 | 1/1/1959 | | CANC |
Jim Storey
|
|
|
07/15/99 301 - called and canclled
|