BLD-Final | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | PASS |
Jim Storey
|
|
|
dave ###-####
|
BLD-Final | 5/26/2000 | 5/26/2000 | 5/30/2000 | P | NR |
|
|
|
Mel ###-#### done bt 301 5/30/00 10:57:43 AM
|
FIRE-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Wall cover | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 16:35:31. Contact: ###-####. c/n on site fire stopping third floor north loby ceilling. tape fasteners first floor north loby south wall. handrail third floor countinous at guardrail/handrail cou 5/15/00 11:00:14 AMntinous. 5/15/00 11:00:33 AM
|
BLD-Framing/Rough-in | 4/11/2000 | 4/13/2000 | 4/13/2000 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 14:48:04. Contact: 084660006.
|
FIRE-Sprinkler Rough-in | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | FAIL |
Rick Jackson
|
|
|
checked attic area - sprinkler head bent
|
BLD-Framing/Rough-in | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 14:57:20. Contact: ###-####. third floor ok 3/28/00
|
BLD-Framing/Rough-in | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 16:32:20. Contact: ###-####. 2 nd floor shaft ok 3/23/00 11:33:39 AM
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 12:59:46. Contact: ###-####. truss engineer to field review and respond to truss conections hc2a/hc2b to verrify that design values have been achived. truss engineer to give min. load bearing at#13 truss hc1. seal draftt stops. missing sprinkler at south stair attic space. 3/22/00 10:55:19 AM
|
BLD-Framing/Rough-in | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/20/2000 at 15:36:35. Contact: ###-####. Still needs more fire caulk at penetrations of membrane 3/21/00 4:18:45 PM
|
BLD-Framing/Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/16/2000 at 12:44:22. Contact: ###-####. C/N posted 3/17/00 2:40:29 PM
|
BLD-Framing/Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 09:56:12. Contact: ###-####. C/N 5 items ok to start gyp. 1st fl. 3/2/00 4:45:53 PM
|
BLD-Framing/Rough-in | 2/25/2000 | 2/28/2000 | 2/28/2000 | P | PASS |
Jim Storey
|
|
|
ready at 2 roof nailing north end ###-#### Roof deck nailing ok. 2/29/00 2:59:47 PM
|
FIRE-Supply Line Flush | 2/24/2000 | 2/28/2000 | 2/28/2000 | A | PASS |
Rick Jackson
|
|
|
mid morning ###-#### Underground flush okay. 2/28/00 2:41:30 PM
|
BLD-Framing/Rough-in | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Jim Storey
|
|
|
###-#### \\building b SWE roof nail ok. 2/14/00 2:03:44 PM
|
BLD-Framing/Rough-in | 12/6/1999 | 12/7/1999 | 12/7/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:53:08. Contact: ###-####. Ok floor deck 2nd floor SW corner.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Jim Storey
|
|
|
MEL ###-#### Work in progress Idems for engineers review in RFI.
|
INSP - Foundation | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PART |
Jim Storey
|
|
|
09/02/99 301 - ok pending special insp report
|
INSP - Foundation | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | PART |
Jim Storey
|
|
|
08/26/99 301 - plcced intior ft w/si pending report
|
INSP - Foundation | 8/24/1999 | 8/24/1999 | 8/24/1999 | P | PART |
Jim Storey
|
|
|
08/24/99 301 - placed w/special insp. pending report
|
INSP - Framing/Rough-in | 8/18/1999 | 8/19/1999 | 8/19/1999 | A | PART |
Jim Storey
|
|
|
08/19/99 301 - rebar ok grid 1 colums
|
INSP - Foundation | 8/10/1999 | 8/11/1999 | 8/11/1999 | A | PART |
Jim Storey
|
|
|
08/11/99 301 - MEL ###-#### AS EARLY AS POSSIBLE/POURING AT 11:00 AM
|
INSP - Foundation | 8/10/1999 | 8/10/1999 | 8/10/1999 | P | PART |
Russ Owen
|
|
|
08/10/99 407 - requires special inspection.
|
INSP - Foundation | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
Jim Storey
|
|
|
08/05/99 301 - special insp pending as well as letter for engineers bar
|
INSP - Foundation | 8/4/1999 | 8/4/1999 | 8/4/1999 | P | PART |
|
|
|
08/04/99 338 - made ok for the south wall center to the west and aprox 2
|
INSP - Foundation | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | FAIL |
|
|
|
08/03/99 338 - REBAR/FOOTING NEIL ###-#### need clearance bars in large
|