PRECON TECHNOLOGIES * TO CONSTRUCT A NEW 2,480 SQ. FT. ONE STORY OFFICE BUILDING WITH A 2,480 SQ. FT. BASEMENT. Constructed of Diamond Snap-form eps insulation concrete forming system at the basement walls, "R-Control" insulated sandwich wall panels at the main floor and TJM Trus joist at floor and ceiling framing. South wall is to be 1hr fire resistant w/ parapet. All construction per the approved plans and attached requirement list. DR123-97 PC#/595-98/ads
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval3/31/20083/31/20083/31/2008PPASS
DetailsDena Gambrel
3-28-08 1430 Passed Final.
Code Occupancy Approval1/15/20081/15/20081/15/2008PFAIL
DetailsDena Gambrel
1-15-08 1000 Failed Occupancy Inspection. Correction Notice issued.
BLD-Final1/8/20081/9/20081/9/2008APASS
DetailsTom Arcoraci
dave Phone #: ###-####
BLD-Conference4/30/20075/1/20075/1/2007APASS
DetailsTom Arcoraci
Dave ###-####
BLD-Conference10/25/200610/26/200610/26/2006APASS
DetailsTom Arcoraci
dave; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs to finish items for final and provide approved plans
FIRE-Final Inspection10/4/200610/5/200610/6/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection9/29/20069/29/20069/29/2006PFAIL
DetailsTroy Cobbley
Still need plans and notes
FIRE-Conference8/23/20068/23/20068/23/2006PDONE
DetailsTroy Cobbley
I went over life safety requirements with the owner. He did not have the city approved plans or review comments.
BLD-Conference10/11/200210/11/200210/11/2002APART
DetailsBill VanDegrift
1650 n. hilton contractor called couldn't get anyone to inspect his dry well or piping for his perimiter drainage system, he'd talked to brian murphy and tom arcoraci. told him he should film it , piping, bedding, fill and filter fabric and go from there. bill vandegrift.
BLD-Framing/Rough-in6/3/20026/3/20026/3/2002PPASS
DetailsTom Arcoraci
###-#### dave
BLD-Framing/Rough-in5/9/20025/10/20025/10/2002APASS
DetailsTom Arcoraci
DAVE ###-#### ok to cover 5/10/2002 11:15:41 AM
BLD-Framing/Rough-in5/9/20025/9/20025/9/2002PNR
DetailsJim Sly
dave ###-####
BLD-Conference11/1/200111/2/200111/2/2001APASS
DetailsTom Arcoraci
###-#### Dave needs arch details for change for stairs 11/1/2001 2:56:31 PM
BLD-Framing/Rough-in10/10/200110/10/200110/10/2001PNR
DetailsTom Arcoraci
###-####
BLD-Conference9/19/20019/19/20019/19/2001PPASS
DetailsTom Arcoraci
###-#### DAVE ok for 1 layer 5/8 x and 3 coat stucco at exterior 9/19/2001 2:12:56 PM
BLD-Framing/Rough-in9/14/20019/14/20019/14/2001PPASS
DetailsDave Hannah
###-#### dave first layer of sheet rock on south wall and parapet wall 9/14/2001 1:51:59 PM
BLD-Conference7/5/20017/5/20017/5/2001PPASS
DetailsTom Arcoraci
###-#### need eng detail for post connections 7/5/2001 4:56:57 AM
BLD-Framing/Rough-in5/17/20015/17/20015/17/2001PPART
DetailsTom Arcoraci
DAve ###-#### pre fab walls installed 5/17/2001 1:45:00 PM
BLD-Foundation4/9/20014/9/20014/9/2001PPART
DetailsTom Arcoraci
found insp= dave-- ###-#### -uffer ground not acceptable ufer ground 4/9/2001 1:46:27 PM
BLD-Foundation2/22/20012/23/20012/23/2001APART
DetailsRuss Owen
pouring elevator shaft ###-#### Dave Newman lower portion of elevator shaft cmu 12 foot lift poured with-out inspections,steel visible above block . 2/23/2001 12:18:28 PM
BLD-Framing/Rough-in12/6/200012/7/200012/7/2000APART
DetailsTom Arcoraci
Dave ###-#### conf on special insp for steel 12/7/2000 10:11:34 AM
BLD-Foundation10/11/200010/13/200010/13/2000APART
DetailsCarl Dependahl
Steve ###-####; 10/12/2000 4:02:32 PM walls ok pend spec insp report 10/12/2000 4:02:44 PM
BLD-Footing9/25/20009/26/20009/26/2000APART
DetailsCarl Dependahl
Steve ###-####, ftg appears ok per engs stamped modification. ok to eliminate "ice-block t 9/26/2000 10:57:11 AM ype forms 9/26/2000 10:57:17 AM
BLD-Footing9/25/20009/25/20009/25/2000PPART
DetailsTom Arcoraci
steve ###-#### need eng ok stamped 9/26/2000 8:11:28 AM
BLD-Conference9/19/20009/20/20009/20/2000APASS
DetailsTom Arcoraci
David Newman ###-#### wants to change to steal joists form wood will have 9/20/2000 11:31:31 AM eng provide details 9/20/2000 11:31:49 AM
BLD-Conference8/3/20008/7/20008/7/2000APASS
DetailsTom Arcoraci
dave --###-#### conf insp
BLD-Conference4/21/20004/24/20004/24/2000APASS
DetailsCarl Dependahl
Dave ###-#### conference on site Met w/owner re: plans, may resubmit. 4/26/00 12:14:55 PM